Cable Colour Identification
Summary
-
Latest update and next planned activity
Date of latest update
Latest Update
-
Impacts Overview
Impacted Consumers
Non-Domestic
Domestic
Impacted REC Parties and Market Participants
Advanced Meter Equipment Manager (T)
Electricity Meter Operator (M)
Smart Meter Equipment Manager (S)
Electricity Distribution Network Operator (R)
Other (Other)
Impacted REC Documents
MOCoPA (since removed)
Priority and rationale
Standard
Solution development
Problem Statement
During times of sustained supply chain shortages, some colour coded cables may not generally be available. Where this is the case, Metering Equipment Managers (MEMs) and Distribution Network Operators (DNOs) need to be able to source a suitable alternative cable so that they can continue to install and maintain meters. Although the labelling of cables with different out sheath colours from the inner insulation is covered by the IET Wiring Regulations, this is not set out within the REC Electricity MOCoP.
Proposed solution summary
- As an electricity Consumer, I want requested meter work to take place safely and efficiently at the time and date agreed, so that I have a safe and working meter.
- As a MEM or a DNO I want clarity on how to deal with cable labelling during periods of coloured cable supply chain shortages, so that I can continue to install or maintain consumer metering.
- As a Metering Scheme Auditor, I want there to be clarity on the permitted labelling of non-standard colour coded cables used when connecting meters, so that audits can be appropriately completed.
Solution documents
Documents Library
Change Plan
Initial Assessment Report published
Completed
Start:
01 Nov 2021Due:
26 Nov 2021Completion:
26 Nov 2021Change Panel review
Completed
Start:
26 Nov 2021Due:
07 Dec 2021Completion:
07 Dec 2021Preliminary Change Report issued
Completed
Start:
07 Dec 2021Due:
04 Jan 2022Completion:
31 Dec 2021Metering Expert Panel review
Completed
Start:
04 Jan 2022Due:
12 Jan 2022Completion:
12 Jan 2022Consultation starts
Completed
Start:
12 Jan 2022Due:
17 Jan 2022Completion:
25 Jan 2022Consultation ends
Completed
Start:
17 Jan 2022Due:
15 Feb 2022Completion:
15 Feb 2022Final Change Report issued
Completed
Start:
15 Feb 2022Due:
25 Feb 2022Completion:
25 Feb 2022Metering Expert Panel decision
Completed
Start:
25 Feb 2022Due:
09 Mar 2022Completion:
09 Mar 2022Original submission
Change details
Colette Baldwin - -
1 Nov 2021
Change details
Cable Colour Identification
Where there are supply chain shortages and it is not possible to source the correct coloured cable, then a cable with a different outer sheath colour to the inner insulation can be used alongside the correct alpha-numeric marking (as defined in Table .1 of the IET Wiring Regulations - BS7671: 2018 Section 514. This change looks to add the relevant table 51.1 alpha-numeric code in to Appendix 9 of the Electricity Metering Code of Practice (MOCoP).
Without a suitable substitute cable with appropriately defined labelling requirements, meter installations could not be completed until supply chain levels resumed.
Relevant alpha- numeric code from Table 51.1 of the IET Wiring Regulations - BS671:2018 Section 514 identification method are included in the Electricity Meter Operations Code of Practice
The issue was previously raised and discussed at the Meter Operator Code of Practice Agreement (MOCoPA) meetings of the Review Panel (RP) and the All Parties Working Group (APWG) from January 2021 until July 2021. A draft change was prepared and consulted on, and the REC Code Manager agreed to raise the change following the transition of MOCoPA to the REC.
Impacts
Electricity
Other (please provide details in Additional information box below)
This will enable meters to be installed when stocks of colour coded cables are in short supply. It will allow MEMs to use a suitable substitute cable, appropriately labelled, to allow the work to proceed without waiting for a supply chain issue to be resolved. It will ensure that the Electricity MEMs, DNOs and REC Meter Operator Auditors have clarity on the requirements to appropriately label in these circumstances.
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
Distribution Network Operators
REC Meter Operator Auditors
No details provided
-
No
No details provided
Priority & timing
No
-
None
None
No details provided
-