TDIS Scheme New Guidance

Published on 15 Apr 2026 00:00 by Jenny Hyskaj

We are aware that there may be some confusion and/or inconsistent approaches in how multiple energy theft leads/tip-offs relating to the same customer and instance of theft are recorded. RECCo intends to address this through a future change to the energy theft submission files. In the meantime, we would like to provide interim guidance on how this scenario should be managed within the current reporting framework. If you have already submitted theft investigations that fall into the below scenario for the 2025/2026 TDIS Reporting Year, we request that you resubmit them by 01 June 2026 using this guidance to ensure the accuracy of the scheme.
 
Scenario
Supplier X receives multiple ETTOS ISRs relating to a single meter point, with a strong likelihood that they correspond to the same instance of theft and assessed loss period. While some limited activity is required to determine whether these leads are connected, this is significantly less than the effort involved in conducting a full desktop review.
 
Challenge
How should Supplier X record these leads to ensure appropriate record-keeping, without inappropriately claiming for a desktop review?
 
Interim Guidance
Supplier X shall submit the duplicated theft lead record using an Outcome of ‘No Theft’ and an Investigation Type of ‘Other’. The ETTOS ISR reference should be included in the “Information Source Reference - ETTOS Lead” field.
 
Future Changes
This approach provides a consistent methodology across the scheme; however, it does introduce some ambiguity in reporting. For example, cases may be recorded as ‘No Theft’ even where theft is ultimately confirmed on the initial lead. To address this, we will look to raise a REC Change to the PARC to introduce a new Outcome code specifically for this scenario. Further details will be shared as part of the formal REC Change process.