C21 to be introduced into STIRG Document

  • 1
    Initial Assessment
  • 2
    Solution Development
  • 3
    Consultation
  • 4
    Decision
  • 5
    Awaiting Implementation
  • 6
    Implemented
Step 6 of 6
Implemented
Summary
This change proposes to add a new category 3 asset condition code to the Guidance for Service Termination Issue Reporting (STIRG) document, to allow Meter Operator Agents (MOAs) to report to the Distribution Network Operator (DNO) where the meter supply neutral is fed via a shared additional N/E block without having to abort the meter work.

Latest update and next planned activity

Date of latest update
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.

Impacts Overview

Impacted Consumers
Domestic Non-Domestic
Impacted REC Parties and Market Participants
Advanced Meter Equipment Manager (T) Electricity Meter Operator (M) Smart Meter Equipment Manager (S) Gas Meter Asset Manager (MAM) Electricity Distribution Network Operator (R)
Impacted REC Documents
Data Item Catalogue
Other Industry Codes impacted
Balancing and Settlement Code (BSC) Distribution Connection and Use of System Agreement (DCUSA)
Priority and rationale
Standard

Solution development

Problem Statement
Parties are having to unnecessarily abort installs where there is a non-standard PME connection arrangement as there is no category 3 asset issue reporting option within the STIRG document.
Solution documents
C21 proposed legal text 05 Jun 2026 PDF - 335 KB
05 Jun 2026
05 Jun 2026
05 Jun 2026
Change Plan

Proposal Plan approved by Change Panel

Completed

Start:

Due:

Completion:

01 Apr 2025

Approved at Metering Expert Panel

Completed

Start:

Due:

Completion:

09 Jul 2025

Original submission

Change details

Chris Varney - OVO
19 Feb 2025

Change details

C21 to be introduced into STIRG Document
Having to abort smart electric meter installations as a B07 asset code where the meter supply neutral is fed via a shared additional N/E block. The C21 asset code was agreed by the ENA parties some time ago but this change is still yet to be released.
This is resulting in multiple repeated aborted installations, which is impacting the RTS removal programme
The release of C21 to replace the relevant B07 scenarios
-

Impacts

Electricity
On site experience
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
-
No details provided

Priority & timing

No
-
-
-
No details provided
On site experience

Activity

Status has been changed to Implemented.
Implementation Date has been updated to 27 Feb 2026.