Consequential New and Amended Market Messages for BSC Modification P375

  • 1
    Initial Assessment
  • 2
    Solution Development
  • 3
    Consultation
  • 4
    Decision
  • 5
    Awaiting Implementation
  • 6
    Implemented
Step 6 of 6
Implemented
Summary
-

Latest update and next planned activity

Date of latest update
Latest Update
-

Impacts Overview

Impacted Consumers
Non-Domestic Domestic
Impacted REC Parties and Market Participants
Advanced Meter Equipment Manager (T) Electricity Meter Operator (M) Smart Meter Equipment Manager (S) Half Hourly Data Collector (C) Non Half Hourly Data Collector (D) Electricity Distribution Network Operator (R) Energy Supplier (ES) Half Hourly Data Aggregator (A) Non Half Hourly Data Aggregator (B)
Impacted REC Documents
Standards Definition Document Data Item Catalogue Market Message Catalogue
Other Industry Codes impacted
Balancing and Settlement Code (BSC)
Priority and rationale
High

Solution development

Problem Statement
BSC Modification P375 will be implemented on 30th June 2022 and introduces a new role of Asset Metering Virtual Lead Party (AMVLP), to allow settlement of meters ‘behind the boundary point’. To enable this, the AMVLP will need to exchange Market Messages with other Market Participants that underpin the new process being introduced by the BSC. Some of these Market Messages are governed by the REC and require a consequential REC Change Proposal to deliver the full solution.
Proposed solution summary
  1. As a Consumer I want to be able to access aggregation services so that I can take full advantage of commercial opportunities for my onsite generation or demand reduction.
  2. As Market Participant, I need to understand any changes to Market Messages I send and receive that may impact my business, so I can engage in the change process and plan any required changes to my systems and processes.
  3. As an Asset Metering Virtual Lead Party, I need to be recognised as a valid Market Data Service, so that I can appoint BSC Qualified Agents and fulfil relevant metering operations and data collection activities for Asset Metering.
Solution documents
Legal Text (Tracked Changes) 05 Jun 2026 ZIP - 850.13 KB
05 Jun 2026
Change Plan

Initial Assessment Report published

Completed

Start:

08 Sep 2021

Due:

12 Oct 2021

Completion:

12 Oct 2021

Change Panel review

Completed

Start:

12 Oct 2021

Due:

19 Oct 2021

Completion:

19 Oct 2021

Preliminary Change Report issued

Completed

Start:

19 Oct 2021

Due:

01 Nov 2021

Completion:

29 Oct 2021

Technical Expert Panel review

Completed

Start:

01 Nov 2021

Due:

08 Nov 2021

Completion:

08 Nov 2021

Consultation starts

Completed

Start:

08 Nov 2021

Due:

15 Nov 2021

Completion:

12 Nov 2021

Consultation ends

Completed

Start:

15 Nov 2021

Due:

06 Dec 2021

Completion:

06 Dec 2021

Final Change Report issued

Completed

Start:

06 Dec 2021

Due:

10 Dec 2021

Completion:

10 Dec 2021

Technical Expert Panel decision

Completed

Start:

10 Dec 2021

Due:

22 Dec 2021

Completion:

22 Dec 2021

Original submission

Change details

Gemma Dixon - -
8 Sep 2021

Change details

Consequential New and Amended Market Messages for BSC Modification P375
P375 “Settlement of Secondary BM Units using metering behind the site Boundary Point” was approved by the Authority on 24 February 2021 for implementation on 30 June 2022 as part of the June 2022 BSC Release. As a result, there are a number of consequential changes required to Market Messages and Data Items.
The Balancing and Settlement Code (BSC) have introduced an opportunity for settlement behind the meter for Virtual Lead Parties (VLP). The P375 solution will use Settlement Quality meters at the asset delivering the Balancing Service, or “Asset Metering” which will adhere to the same standards as Boundary Point Metering. VLPs will need the ability to appoint BSC Qualified Agents, similar to the process by which Qualified Party Agents are appointed at the Boundary Point. Specifically, VLPs would need to appoint a qualified Meter Operator Agent (MOA) and Data Collector (DC). Half Hourly Data Aggregators (HHDA) will be required to submit HH metered volume data for Supplier Volume Allocation (SVA) Metering System Numbers associated with Secondary Balancing Mechanism (BM) Units to Settlement. Settlement would use this data and the registration data to calculate an aggregated volume for each Secondary BM Unit, in order to facilitate settlement of Trans European Replacement Reserve Exchange (TERRE) Activations and BM instructions.
Amendments to Market Messages and new Data Items will need to be created for the new metering point. 1. Change to existing data item to enable the use of AMSID as an alias of the MPAN (J0003) The metering systems behind the Boundary Point will be assigned a 13-digit Asset Metering System Identifier (AMSID), similar to the pseudo MPANs some DCs already assign to sub-metering for site monitoring purposes. The J0003 will be the unique national reference for a Metering System or an Asset Metering System, either the MPAN or AMSID. 2. Changes to Market Messages There are 6 existing Market Messages that will require one or more new instances to support the P375 change of VLP process, based on the Change of Supplier process. 3. Add AMVLP as a valid Market Data Service in the Standards Definition document. Please Note the following activity will be completed by Elexon: - Elexon will raise a Market Domain Data (MDD) Change Request to add ‘AMVLP’ as a new Participant Role, which is required before a Participant may become a Data Transfer Participant, before the P375 Implementation Date. - Introduce a new Dxxxx Market Message, for Half Hourly Data Collectors to send ‘Asset Metering System Half Hourly Metered Data’ to the SVAA. - Introduce a new Data Item Jxxxx - Period Asset Metering System Metered Data, to allow HHDC to send Period Asset Metering System Metered Data to the SVAA for all AMSIDs to which they have been appointed. - Introduce a new Data Item Jyyyy – AMSID CORE - A unique identifier for an Asset Metering System, this is an alias of the MPAN Core.
P375 proposes using Metering Equipment ‘behind’ the defined Boundary Point for Balancing Services (‘behind the Meter’), for Settlement purposes rather than the Boundary Point Meter. This will allow balancing-related services on-site to be separated from imbalance-related activities, more accurately reflecting the balancing-energy volumes provided by the Balancing Service Provider (BSP).

Impacts

Electricity, Microbusiness, Small and Medium Enterprise (SME), Industrial and Commercial (I&C)
Other (please provide details in Additional information box below)
Consumers will be impacted as they will be able to participate in TERRE and the BM if they wish to do so.
No details provided
-
No details provided
-
No details provided
-
Data Item Catalogue, Market Message Catalogue, Standards Definition
1. Change to existing data item to enable the use of AMSID as an alias of the MPAN (J0003) 2. Changes to Market Messages that will require one or more new instances to support the P375 change of VLP process. 3. Add AMVLP as a valid Market Data Service in the Standards Definition document.
No details provided
-
No details provided
-
Energy Suppliers, Distribution Network Operators, Data Collectors, Data Aggregators
Other – A new participant role AMVLP Asset metering virtual lead party. Impacts to Half Hourly Market Participants only.
Balancing and Settlement Code (BSC)
-
No
No details provided

Priority & timing

No
N/A
Implementation required in line with P375 approved for June 22
Dependent on Elexon introducing new Market Message and Data Items
No details provided
-

Activity

Proposed solution summary changed to As a Consumer I want to be able to access aggregation services so that I can take full advantage of commercial opportunities for my onsite generation or demand reduction.As Market Participant, I need to understan…
Show more
Implementation Date has been updated to 30 Jun 2022.
beth.brown has been allocated as SME.