Enabling Dual MSA & MSS (SVA MOA) appointments for WC connection types
Summary
Under the legacy/pre-MHHS arrangements the market is segmented by Measurement Class (MC) for settlement purposes which is not sensitive to the Meter type that is installed or is to be installed, meaning that the replacement of Traditional meters to either smart or Advanced metering equipment can be arranged without the need for the Change of Measurement Class (CoMC) process to be conducted concurrent with the meter exchange (MEX). Under MHHS, when a WC connection goes through a MEX from Traditional to Advanced, or from Advanced to Smart in the MHHS arrangements a new complexity is placed on suppliers because the CoSeg process must be tightly co-ordinated to a specified planned MEX date and processed through the MPRS within 3 Working Days of that date.
Latest update and next planned activity
Date of latest update
Latest Update
26/10/2026 - The Consultation has closed. The Code Manager is assessing the responses.
Impacts Overview
Priority and rationale
Standard
Change Reports, Impact Assessments, Consultations and Documents
Change Reports
Solution development
Solution documents
Documents Library
There is currently no Change Plan.
Original submission
Change details
Lee Stone - Npower Commercial Gas Limited
13 Aug 2026
Change details
Enabling Dual MSA & MSS (SVA MOA) appointments for WC connection types
Under the legacy/pre-MHHS arrangements the market is segmented by Measurement Class, (MC) for settlement purposes which is not sensitive to the Meter type that is installed or is to be installed. Except for Unmetered Supplies (UMS allocated to MC D) the current arrangements (pre MHHS) mean that the replacement of Traditional meters to either smart or Advanced metering equipment can be arranged without the need for the Change of Measurement Class (CoMC) process to be conducted concurrent with the meter exchange (MEX). The result of this means that it less complicated to install either meter type as the MEX process is disconnected from the existing market segmentation arrangements (HH and NHH), specifically if the traditional meter exchange is for an Advanced meter it can be conducted under MC A, so should a customer with a Whole Current (WC) connection opt to move to HH settlement then a CoMC from MC A to MC G can be conducted at a point in time after the MEX has.
The MHHS baseline design moves the market segmentation to a combination of meter & connection type for settlement purposes so requires Traditional meter types with WC connections to be allocated to the Smart meter segment upon migration to the MHHS arrangements. This was a design choice to cater for most of the electricity market (where the customer choice of metering solution is not optional) because the largest number of Metering Systems is in the SVA market, the result of this means that
1. where non-domestic customer choice can be offered to non-domestic customers in line with Supplier Licence Condition (SLC) 39.13 & customers opt for Advanced metering solutions it creates a need for the Change of Market Segment (CoSeg) to be performed in line with a planned meter exchange date.
2. Where a customer (domestic or non-domestic) cannot be offered a choice of metering in line with Supplier Licence Condition (SLC) 39.13 but has an advanced meter installed in their premises, the Change of Market Segment (CoSeg) to be performed in line with a planned meter exchange date.
Consequently, when a WC connection goes through a MEX from Traditional to Advanced, or from Advanced to Smart in the MHHS arrangements a new complexity is placed on suppliers because the CoSeg process must be tightly co-ordinated to a specified planned MEX date and processed through the MPRS within 3 Working Days of that date, otherwise the CoSeg process lapses. This arises because suppliers initiate the CoSeg process only once a planned MEX date is agreed with the Metering Service provider which is to be appointed.
The complexity arises because the design removes the ability for the Metering Service to conduct direct customer contact to book MEXs in advance of a MEX as it is not appointed by virtue of the market segmentation being in conflict with the required type of meter that should be installed, e.g. an MSS agent appointment may only exist where Traditional or Smart meter is in place. Even if this was worked around (e.g. information shared via an information sharing web portal) the Metering Service could not proceed due to the lack of an existing appointment, so would have to come back to the supplier to initiate the CoSeg process, When compared to the legacy arrangements this has created additional burdens, increases the risk of failing to meet customer demand for their chosen meter solution, and ultimately acts to impede suppliers ability to meet its metering rollout targets.
1. where non-domestic customer choice can be offered to non-domestic customers in line with Supplier Licence Condition (SLC) 39.13 & customers opt for Advanced metering solutions it creates a need for the Change of Market Segment (CoSeg) to be performed in line with a planned meter exchange date.
2. Where a customer (domestic or non-domestic) cannot be offered a choice of metering in line with Supplier Licence Condition (SLC) 39.13 but has an advanced meter installed in their premises, the Change of Market Segment (CoSeg) to be performed in line with a planned meter exchange date.
Consequently, when a WC connection goes through a MEX from Traditional to Advanced, or from Advanced to Smart in the MHHS arrangements a new complexity is placed on suppliers because the CoSeg process must be tightly co-ordinated to a specified planned MEX date and processed through the MPRS within 3 Working Days of that date, otherwise the CoSeg process lapses. This arises because suppliers initiate the CoSeg process only once a planned MEX date is agreed with the Metering Service provider which is to be appointed.
The complexity arises because the design removes the ability for the Metering Service to conduct direct customer contact to book MEXs in advance of a MEX as it is not appointed by virtue of the market segmentation being in conflict with the required type of meter that should be installed, e.g. an MSS agent appointment may only exist where Traditional or Smart meter is in place. Even if this was worked around (e.g. information shared via an information sharing web portal) the Metering Service could not proceed due to the lack of an existing appointment, so would have to come back to the supplier to initiate the CoSeg process, When compared to the legacy arrangements this has created additional burdens, increases the risk of failing to meet customer demand for their chosen meter solution, and ultimately acts to impede suppliers ability to meet its metering rollout targets.
To enable a solution that enables WC meters to enter the CoSeg process for both Smart to Advanced & Advanced to Smart segments once migrated to the MHHS arrangements that remains open indefinitely and completes when relevant IF/PUB-005s are issued to Supplier Meter Registration Service (SMRS), and enable a CoSeg to be conducted at the point the customer’s choice of metering is confirmed to be advanced as opposed to concurrent with a MEX, removing the complexity that has been introduced for Advanced meter deployment once migrated to MHHS.
Suggested red-lining for REC Schedule 14 provided.
Suggested red-lining for REC Schedule 14 provided.
n/a
Impacts
Electricity, Industrial and Commercial (I&C), Microbusiness, Small and Medium Enterprise (SME)
Billing accuracy, Switching experience
-
Schedule 14 - Metering Operations
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
Energy Suppliers, Meter Operator Agent
-
Balancing and Settlement Code (BSC)
BSC change to be raised
No
No details provided
Priority & timing
No
-
Development: Feb 2027 (to align with the associated BSC CP)
Implementation: N/A
Implementation: N/A
This is cross code change in conjunction with a BSC CP.
No details provided
Billing accuracy, Switching experience