Market-wide Half-Hourly Settlement Implementation
Summary
-
Latest update and next planned activity
Date of latest update
Latest Update
-
Impacts Overview
Impacted Consumers
Others
Domestic
Non-Domestic
Impacted REC Parties and Market Participants
Other (Other)
Impacted REC Documents
REC Main Body
Other Industry Codes impacted
Balancing and Settlement Code (BSC)
Priority and rationale
High
Solution development
Problem Statement
The successfully introduction of Market-wide Half-Hourly Settlement (MHHS) requires changes to made to the systems and processes governed by other codes outside of the BSC, including the REC. Elexon as the Senior Responsible Owner (SRO) and Ofgem as the Programme Sponsor for the MHHS programme need assurance that all programme participants will support the implementation of the programme and deliver against the approved timetable. While there is a general ‘duty to cooperate’ with Significant Code Reviews that exists for licenced parties, there is no explicit legal requirement for RECCo (as a non-BSC Party) to support this and no contractual recourse if its duties are not met.
Proposed solution summary
- As the Senior Responsible Owner for the Market-wide Half-Hourly Settlement programme, I need assurance that all programme participants will deliver the required changes in accordance with programme plan, so Market-wide Half-Hourly settlement can be introduced and implemented successfully.
Solution documents
Documents Library
05 Jun 2026
Download Change Proposal Plan v1.0 (Approved)
Change Plan
Initial Assessment Report published
Completed
Start:
01 Sep 2021Due:
03 Sep 2021Completion:
03 Sep 2021Change Panel review
Completed
Start:
03 Sep 2021Due:
07 Sep 2021Completion:
07 Sep 2021Preliminary Change Report published
Completed
Start:
07 Sep 2021Due:
09 Sep 2021Completion:
09 Sep 2021Consultation start
Completed
Start:
09 Sep 2021Due:
14 Sep 2021Completion:
14 Sep 2021Consultation end
Completed
Start:
14 Sep 2021Due:
20 Sep 2021Completion:
20 Sep 2021Final Change Report published
Completed
Start:
20 Sep 2021Due:
24 Sep 2021Completion:
24 Sep 2021Change Panel decision
Completed
Start:
24 Sep 2021Due:
05 Oct 2021Completion:
05 Oct 2021Original submission
Change details
Abid Sheikh - Ofgem
1 Sep 2021
Change details
Market-wide Half-Hourly Settlement Implementation
The existing electricity settlement processes are set out in the Balancing and Settlement Code (BSC) with supporting processes and information set out in other Codes, such as the REC, the Smart Energy Code (SEC), the Distribution Connection and Use of System Agreement (DCUSA) and the Connection and Use of System Code (CUSC).
Ofgem recognises that the implementation of Market-wide Half-Hourly Settlement (MHHS) will impact several different Party types and Industry Codes. To ensure successful delivery of the project, additional sections are being added to the BSC to set out what is expected of participants in the MHHS programme.
Under the proposed governance structure for the MHHS programme, Ofgem will retain accountability for its successful delivery as the Programme Sponsor. Elexon will act as the programme Senior Responsible Owner (SRO), giving it the responsibility for establishing, operating and managing appropriate programme governance to ensure timely and effective implementation.
During the January 2021 consultation on MHHS implementation principles, it was noted that Ofgem would place obligations on relevant Parties, including Suppliers, Network Parties, and the Data Communications Company (DCC), to comply with the programme. The intention of this proposal is to add a paragraph to the REC which places an obligation on RECCo to identify, plan and deliver all necessary changes on a timescale that is consistent with the baselined MHHS implementation plan in line with section C12 of the BSC.
Ofgem recognises that the implementation of Market-wide Half-Hourly Settlement (MHHS) will impact several different Party types and Industry Codes. To ensure successful delivery of the project, additional sections are being added to the BSC to set out what is expected of participants in the MHHS programme.
Under the proposed governance structure for the MHHS programme, Ofgem will retain accountability for its successful delivery as the Programme Sponsor. Elexon will act as the programme Senior Responsible Owner (SRO), giving it the responsibility for establishing, operating and managing appropriate programme governance to ensure timely and effective implementation.
During the January 2021 consultation on MHHS implementation principles, it was noted that Ofgem would place obligations on relevant Parties, including Suppliers, Network Parties, and the Data Communications Company (DCC), to comply with the programme. The intention of this proposal is to add a paragraph to the REC which places an obligation on RECCo to identify, plan and deliver all necessary changes on a timescale that is consistent with the baselined MHHS implementation plan in line with section C12 of the BSC.
The successful introduction of MHHS will be dependent upon all affected Code bodies, including RECCo, working collaboratively with Elexon and each other to deliver the changes to Codes, systems and processes necessary for MHHS implementation. Although there are various obligations that create a ‘duty to cooperate’ with the implementation of the outcomes of a Significant Code Review (SCR), the Code changes that are being progressed will mandate more detailed obligations. Ofgem is therefore progressing this modification to incorporate the relevant obligation on RECCo into the REC.
Without the addition to the REC of specific wording which obligates RECCo to comply with the changes to the BSC, there is no legal requirement for RECCo (as a non-BSC Party) to support the implementation of MHHS, and no contractual recourse if its duties are not met.
Without the addition to the REC of specific wording which obligates RECCo to comply with the changes to the BSC, there is no legal requirement for RECCo (as a non-BSC Party) to support the implementation of MHHS, and no contractual recourse if its duties are not met.
This modification proposes to insert a new clause into the REC to place an obligation on RECCo to comply with the obligations insofar as these apply to it under BSC section C12 ‘Market-wide Half-Hourly Settlement Implementation’.
The changes in BSC section C12 place specific obligations on MHHS programme parties to ensure effective and timely implementation of MHHS. These changes also establish the governance framework within which the development and delivery by industry of future changes for MHHS implementation can be made to ensure programme delivery takes place effectively and in a coordinated way. The detailed obligations are intended to complement relevant licensees’ licence obligations of a ‘duty to cooperate’ with implementing the outcomes of an SCR.
This modification proposes to add a new clause to the main body of the REC (Clause 5.24) as follows:
"Market-wide Half-Hourly Settlement Implementation
5.24 RECCo shall (and the REC Board shall ensure that RECCo shall) comply with the obligations expressed to apply to RECCo (either specifically or generically as a category of participant) under section C12 (Market-wide Half-Hourly Settlement Implementation) of the Balancing and Settlement Code."
This change to the REC will ensure that RECCo (alongside other relevant Code bodies) will work collaboratively with Elexon (who manages and administers the BSC) and each other to deliver the changes to Codes, systems, and processes necessary for MHHS implementation. This obligation will ensure that RECCo (and other relevant Code Administrators) are obliged to identify, plan, and deliver all necessary changes on a timescale that is consistent with the baselined MHHS implementation plan.
The changes in BSC section C12 place specific obligations on MHHS programme parties to ensure effective and timely implementation of MHHS. These changes also establish the governance framework within which the development and delivery by industry of future changes for MHHS implementation can be made to ensure programme delivery takes place effectively and in a coordinated way. The detailed obligations are intended to complement relevant licensees’ licence obligations of a ‘duty to cooperate’ with implementing the outcomes of an SCR.
This modification proposes to add a new clause to the main body of the REC (Clause 5.24) as follows:
"Market-wide Half-Hourly Settlement Implementation
5.24 RECCo shall (and the REC Board shall ensure that RECCo shall) comply with the obligations expressed to apply to RECCo (either specifically or generically as a category of participant) under section C12 (Market-wide Half-Hourly Settlement Implementation) of the Balancing and Settlement Code."
This change to the REC will ensure that RECCo (alongside other relevant Code bodies) will work collaboratively with Elexon (who manages and administers the BSC) and each other to deliver the changes to Codes, systems, and processes necessary for MHHS implementation. This obligation will ensure that RECCo (and other relevant Code Administrators) are obliged to identify, plan, and deliver all necessary changes on a timescale that is consistent with the baselined MHHS implementation plan.
This is an Authority Change Proposal which has been raised as part of the Electricity Settlement Reform Significant Code Review (SCR), which explores the case for proceeding with and implementing Market-wide Half-Hourly Settlement (MHHS). This proposal has been raised by the Authority in accordance with paragraph 9.3(d) of Schedule 5 to the REC.
The purpose behind this modification has been previously consulted on widely with industry stakeholders through Ofgem’s January 2021 MHHS Consultation on Programme Implementation Principles and April 2021 MHHS Consultation on Implementation and Governance Arrangements. A decision to proceed with MHHS was published alongside the Full Business Case and Final Impact Assessment (April 2021) which sets out Ofgem’s expectation for the transition to full MHHS implementation to be completed by October 2025.
Ofgem has (in August 2021) made its decision on the final implementation arrangements to apply for MHHS, setting out, amongst other things, the final version of the code changes to be made to give effect to the final implementation arrangements.
Ofgem has concluded that Electricity Suppliers should be mandated to settle their customers on a half-hourly basis, as long as the customer does not opt out. In January 2021, Ofgem consulted on its preferred method of programme governance for the MHHS programme, involving industry-led delivery of MHHS implementation with Elexon as the Senior Responsible Owner (SRO) for the programme. While Ofgem acknowledges that licenced parties already have a ‘duty to cooperate’ with the outcomes of an SCR, it believes more detailed obligations are required on all programme participants. Therefore, all programme participants will be required to comply with the new detailed obligations to be set out in section C12 of the Balancing and Settlement Code (BSC). The proposed changes to the BSC will also include the governance arrangements and provision of independent assurance for the programme.
The intention of this modification is to formalise the Retail Energy Code Company’s (RECCo’s), and by extension the REC Board's, cooperation with the agreed method of MHHS implementation to be set out in the BSC.
This modification will not impact REC Parties and implementation will be sought in line with a scheduled REC release to minimise time and effort in updating the REC. If approved, this modification will be implemented in the November 2021 REC Release.
The purpose behind this modification has been previously consulted on widely with industry stakeholders through Ofgem’s January 2021 MHHS Consultation on Programme Implementation Principles and April 2021 MHHS Consultation on Implementation and Governance Arrangements. A decision to proceed with MHHS was published alongside the Full Business Case and Final Impact Assessment (April 2021) which sets out Ofgem’s expectation for the transition to full MHHS implementation to be completed by October 2025.
Ofgem has (in August 2021) made its decision on the final implementation arrangements to apply for MHHS, setting out, amongst other things, the final version of the code changes to be made to give effect to the final implementation arrangements.
Ofgem has concluded that Electricity Suppliers should be mandated to settle their customers on a half-hourly basis, as long as the customer does not opt out. In January 2021, Ofgem consulted on its preferred method of programme governance for the MHHS programme, involving industry-led delivery of MHHS implementation with Elexon as the Senior Responsible Owner (SRO) for the programme. While Ofgem acknowledges that licenced parties already have a ‘duty to cooperate’ with the outcomes of an SCR, it believes more detailed obligations are required on all programme participants. Therefore, all programme participants will be required to comply with the new detailed obligations to be set out in section C12 of the Balancing and Settlement Code (BSC). The proposed changes to the BSC will also include the governance arrangements and provision of independent assurance for the programme.
The intention of this modification is to formalise the Retail Energy Code Company’s (RECCo’s), and by extension the REC Board's, cooperation with the agreed method of MHHS implementation to be set out in the BSC.
This modification will not impact REC Parties and implementation will be sought in line with a scheduled REC release to minimise time and effort in updating the REC. If approved, this modification will be implemented in the November 2021 REC Release.
Impacts
Electricity, Domestic Prepayment, Domestic Credit, Microbusiness, Small and Medium Enterprise (SME), Other (please specify in the Additional information box below)
Other (please provide details in Additional information box below)
Ofgem has estimated that settling consumers on a half-hourly basis would bring net consumer benefits of between £1.6bn and £4.5bn over the period 2021-2045. Ofgem also expects a number of other benefits to consumers, some quantified and others unquantifiable, in terms of incentivising the development of new tariffs and products, lowering the barriers for market entry and progressing decarbonisation of the sector. An analysis of these benefits is set out in the MHHS Final Impact Assessment published alongside our MHHS Decision and Full Business Case in April 2021. Without a coordinated effort across the industry to achieve MHHS, these benefits may not be realised.
This modification will have no direct impact on Consumers. However, it will contribute towards the long-term benefits of a successful delivery of the MHHS initiative.
This modification will have no direct impact on Consumers. However, it will contribute towards the long-term benefits of a successful delivery of the MHHS initiative.
REC Main Body
Add a new Clause 5.24 to the main body of the REC as follows:
"Market-wide Half-Hourly Settlement Implementation
5.24 RECCo shall (and the REC Board shall ensure that RECCo shall) comply with the obligations expressed to apply to RECCo (either specifically or generically as a category of participant) under section C12 (Market-wide Half-Hourly Settlement Implementation) of the Balancing and Settlement Code."
"Market-wide Half-Hourly Settlement Implementation
5.24 RECCo shall (and the REC Board shall ensure that RECCo shall) comply with the obligations expressed to apply to RECCo (either specifically or generically as a category of participant) under section C12 (Market-wide Half-Hourly Settlement Implementation) of the Balancing and Settlement Code."
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
Balancing and Settlement Code (BSC)
This modification will have no impact on other Codes. However, it does link obligations under the REC to clauses in the BSC setting out MHHS obligations.
Yes
No details provided
Priority & timing
Yes
-
Ofgem is seeking for the relevant changes to the REC to be implemented as soon as possible following an Authority decision to approve, specifically within the November 2021 REC Release. Including this change as part of the November 2021 REC Release will improve efficiency by incorporating it into an existing planned REC uplift. If an Authority decision is not received in time for this release, the change, if approved, should be made as soon as possible following an Authority decision.
Associated change and modification proposals to the other affected Codes (BSC, DCUSA, CUSC and SEC) are currently in process. Ofgem expects Codes Bodies to work to the Authority-directed timetable in progressing this and other Codes changes.
No details provided
-