REC Change to Align with DCP467 Asset Condition Reporting
Summary
DCUSA change DCP467 has been raised to propose that Category A and B defects reported currently using the Asset Condition Report (D0135) or phone call to the DNO, should instead be reported via an online reporting tool where the DNO has one available. This is expected to have impacts to the REC.
Latest update and next planned activity
Date of latest update
Latest Update
11/11/2026 - the Metering Expert Panel voted to approve placing this Change Proposal on hold until the solution of DCP467 has been finalised.
Impacts Overview
Impacted REC Parties and Market Participants
Energy Supplier (ES)
Other Industry Codes impacted
Distribution Connection and Use of System Agreement (DCUSA)
Priority and rationale
Standard
Change Reports, Impact Assessments, Consultations and Documents
Change Reports
Solution development
Problem Statement
Where DNOs have enhanced reporting tools for Category A or Category B situations, it is not mandatory for Parties to submit reports using this method. This may lead to a detrimental Consumer experience, as it is limited what information can be provided over the telephone or via Market Message (e.g. it is not possible to provide photographs of the situation).
Solution documents
Workgroup
Has a Workgroup supported the development of the Change Proposal?
No
Documents Library
There is currently no Change Plan.
Original submission
Change details
Caroline Freimuller - REC Code Manager
20 Jan 2026
Change details
REC Change to Align with DCP467 Asset Condition Reporting
DCUSA change DCP467 has been raised to propose that for Category A and B defects reported currently using the Asset Condition Report (D0135) or phone call to the DNO, should instead be reported via an online reporting tool where the DNO has one available. This is expected to have impacts to the REC.
This is expected to have impacts to the REC, to the Service Termination Issue Reporting (STIR) Guidance document and potentially to the D0135 or D0126 data flows which are both owned by the REC.
If only the STIR Guidance document is impacted, this still needs to be processed a full Change Proposal rather than a Category 3 CP due to there being a change in obligations.
If only the STIR Guidance document is impacted, this still needs to be processed a full Change Proposal rather than a Category 3 CP due to there being a change in obligations.
To be determined, this is currently being discussed under DCUSA work groups.
-
Impacts
Electricity
On site experience, Security of supply
-
No details provided
-
No details provided
-
No details provided
-
Market Message Catalogue
-
No details provided
-
No details provided
-
Distribution Network Operators, Electricity Metering Operative, Energy Suppliers, Meter Operator Agent
-
Distribution Connection and Use of System Agreement (DCUSA)
-
No
No details provided
Priority & timing
No
-
To align with DCUSA CP
To align with DCUSA CP
No details provided
On site experience, Security of supply