Registration of Smart Export Guarantee (SEG) Sites
Summary
The Smart Export Guarantee (SEG) is an obligation set by the Department for Business, Energy and Industrial Strategy (BEIS) for licensed electricity Suppliers to offer a tariff to small-scale low-carbon Generators and make payments directly for exported electricity. The SEG came into force on 1 January 2020 and introduced the need to register and settle Export Meter Point Administration Numbers (MPANs), in accordance with the Balancing and Settlement Code (BSC) arrangements, for generators with capacity up to 5 Megawatts (MW). There are a number of scenarios arising which question whether these existing processes established for the import market are fit for purpose for the export market and for the use of shared smart Meters. The REC should allow for registration of export at smaller scale generation (i.e. below 30kW) to ensure that the SEG scheme is workable and therefore the issue with MEM appointment for SEG sites needs to be investigated.
Latest update and next planned activity
Date of latest update
Latest Update
23/10/23 - discussion with BSC. Issue 91 has been closed, so we are proposing to withdraw
Impacts Overview
Priority and rationale
Standard
Solution development
Documents Library
There is currently no Change Plan.
Original submission
Change details
Colette Baldwin - REC Code Manager
24 Aug 2022
Change details
Registration of Smart Export Guarantee (SEG) Sites
The Smart Export Guarantee (SEG) is an obligation set by the Department for Business, Energy and Industrial Strategy (BEIS) for licensed electricity Suppliers to offer a tariff to small-scale low-carbon Generators and make payments directly for exported electricity. The SEG came into force on 1 January 2020 and introduced the need to register and settle Export Meter Point Administration Numbers (MPANs), in accordance with the Balancing and Settlement Code (BSC) arrangements, for generators with capacity up to 5 Megawatts (MW). There are a number of scenarios arising which question whether these existing processes established for the import market are fit for purpose for the export market and for the use of shared smart Meters. The REC should allow for registration of export at smaller scale generation (i.e. below 30kW) to ensure that the SEG scheme is workable and therefore the issue with MEM appointment for SEG sites needs to be investigated. This market is only going to increase following the introduction of the SEG, the continued roll out of Smart Meters capable of recording export, and as we move towards mandatory half-hourly settlement of all consumer energy.
The existence of the export MPAN and the associated Meter will be notified by the Supplier to the MOA, which is not usual practice. It is not evident that processes such as the New Connections and Switching processes, are fit for purpose to support SEG MPANs. This creates a risk that export energy for these MPANs will be registered incorrectly, or not at all, which may impact the Supplier’s ability to correctly settle the Export MPANs. A further relates to the Suppliers having to appoint the same MEM for both import and export MPANs where there is shared Metering Equipment. This was introduced to avoid the complication and potential duplication that could arise from having separate MEMs serving one shared import/export Meter. However, these requirements were introduced when there was little or no domestic export market, and before the installation of smart Meters. Where the Supplier is not the import Supplier and as a result is unlikely to have an ongoing commercial contract with the existing import MEM, appointment of the export MEM is proving time consuming and in some cases is not happening for a number of months. The REC does not require the existing import MEM to either engage with the Supplier or to accept the request for appointment. MEMs are therefore rejecting appointments for export Meters. Without an appointed MEM, data relating to export energy cannot be processed into the Settlements process. Elexon estimated in their Issue 91 Report, that at MPAN level, risk is nominal, with circa 1 million FiT customers plus new EVs the risk is significantly increased
Amendments to the REC need to be made for Export Metering Systems to be registered. Notification of the Export MPAN to the Export Supplier’s MEM needs to be progressed. A change to Market Message - MM00065 (Data Transfer Catalogue Data Flow D0155 ‘Notification of Meter Operator or Data Collector Appointment and Terms’) is required to notify the Non Half-Hourly Meter Equipment Manager (NHH MEM) that they are being appointed to an Export MPAN;
BSC Issue 91 Working Group examined these issues in December 2020, and their workgroup papers and Issue Report published by Elexon would be helpful to understand the issues and suggested solutions. The Issue Workgroup looked at the BSC Procedures related to this activity - BSCP504 and BSCP514. Arrangements in BSCP514 have now transitioned to the Retail Energy Code (REC). This market is only going to increase following the introduction of the SEG, the continued roll out of smart Meters capable of recording export, and as we move toward potential mandatory settlement of half hourly data for all consumers.
Impacts
Electricity, Domestic Prepayment, Domestic Credit, Microbusiness, Small and Medium Enterprise (SME)
Switching experience, Billing accuracy
-
Schedule 25 - Central Switching Service, Schedule 13 - Transfer of Consumer Data, Schedule 14 - Metering Operations, Schedule 23 - Registration Services
-
No details provided
-
No details provided
-
Data Item Catalogue, Market Message Catalogue
-
No details provided
-
Central Switching Service (CSS), Switching Operator
-
Energy Suppliers, Distribution Network Operators, DCC, Data Collectors, Data Aggregators
-
Balancing and Settlement Code (BSC)
There will need to be processes in place to enable Export Registration, and this will need to be in place ready for the Market-Wide Half-Hourly Settlement arrangements.
No
No details provided
Priority & timing
Yes
-
None
A potential change may be required to related BSC processes impacted by this change
No details provided
-