Switching
Switching Programme Documentation

Through Ofgem's Switching Programme activity, a number of key design documents have been produced which define various aspects of new switching arrangements. The processes within these Switching Programme documents consequently transitioned into Retail Energy Code arrangements, to become effective on 18 July 2022 in REC V3.0.

The following table sets out which REC documentation has been updated to include the contents of the Switching Programme design documents.

Prior to 18 July 2022, REC V3.0 baselined documents can be found on the REC Portal at the following links:

Switching Programme DocumentSectionREC DocumentREC Document Category
Code of ConnectionRetry StrategySchedule 24 - Switching Data ManagementCategory 1
CSS Security and API Supporting InformationCategory 3
Security Certificate requirementsSchedule 25 - Central Switching ServiceCategory 1
Background InfoCSS Security and API Supporting InformationCategory 3
CSS Physical Interface Definition (CSS PhID)Message and data item definitionsData SpecificationCategory 2
Background InfoCSS Security and API Supporting InformationCategory 3
Business Rules DocumentFull SpreadsheetCSS Message Business Data Validation RulesCategory 2
Management of Registration DataIncludes messages references and high-level regulatory requirements which link to business rulesSchedule 23 - Registration ServicesCategory 1
Management of Registrable Measurement Point (RMP) Data Includes messages references and high-level regulatory requirements which link to business rulesSchedule 27 - RMP LifecycleCategory 1
Management of CSS MessagesIncludes details regarding Switching Operation Data and requirements relating to synchronous messages responsesSchedule 24 -  Switching Data ManagementCategory 1
Error Resolution DocumentError resolution pathsCSS Error Processing GuidanceCategory 3
Service Management Service DesignsIncluding incident Management, Access Management and Operational ChangeSchedule 26 - Switching Service ManagementCategory 1
Switching Operational Change ProceduresCategory 3
Switching Incident Management PolicyCategory 3
Switching Service Management ProceduresCategory 3

 

Any feedback? Email us at