Commissioning of Works by the Crowded Meter Room Coordinator (CMRC) to Resolve Issues In Crowded Meter Rooms
Summary
This Change Proposal is to introduce new processes which will allow a Crowded Meter Room Co-ordinator (CMRC) to contract with a REC accredited Metering Equipment Manager (MEM) to act on behalf of the CMRC, so that they may resolve issues in a Crowded Meter Room (CMR) on behalf of all Registered Suppliers within that meter room. The MEMs undertaking this work on behalf of the CMRC will be referred to as the Crowded Meter Room MEM (CMRM).
Latest update and next planned activity
Date of latest update
Latest Update
28/06/2024 - Change implemented as part of the June 2024 REC Release
Impacts Overview
Impacted Consumers
Others
Domestic
Non-Domestic
Impacted REC Parties and Market Participants
Advanced Meter Equipment Manager (T)
Electricity Meter Operator (M)
Smart Meter Equipment Manager (S)
Half Hourly Data Collector (C)
Non Half Hourly Data Collector (D)
Electricity Distribution Network Operator (R)
Electricity Meter Asset Provider (8)
Gas Meter Asset Provider (MAP)
Energy Supplier (ES)
Impacted REC Documents
MOCoPA (since removed)
Schedule 1 - Interpretations and Definitions
Schedule 14 - Metering Operations
Schedule 12 - Data Access
Data Access Matrix (Electricity)
Data Item Catalogue
Market Message Catalogue
Impacted REC Services
Electricity Enquiry Service (EES)
Other Industry Codes impacted
Smart Energy Code (SEC)
Balancing and Settlement Code (BSC)
Distribution Connection and Use of System Agreement (DCUSA)
Priority and rationale
Standard
Solution development
Problem Statement
For many Multiple Dwelling Units (MDU), Alt HAN Co equipment is required. This needs to be installed near to the electricity Smart Meter, connected to the tails of that Smart Meter, and requires at least one further device in the Consumer premises. However, the installation of HAN equipment can be inhibited by Crowded Meter Room (CMR) for the installation of alternative HAN and smart equipment. The objective of the CMR work is to leave a meter room ready for Energy Suppliers to proceed with their installations to meet their smart metering rollout obligations. Without the ability to install the alternative HAN wired bridge device in a CMR, Energy Suppliers will ultimately be unable to establish a HAN with the associated premises in the MDU
Proposed solution summary
- As a Consumer I want to be able to have a working Smart Meter that can communicate with my Energy Supplier so that I can receive the benefits of smart metering
- As a property owner I want to be able to have Smart Meters installed in my properties where there are currently issues with meter room space or other technical constraints preventing installation so that my tenants can access the benefits of having a Smart Meter. As a property owner I want a co-ordinated and managed process for resolving crowded meter room issues so that I am not contacted by or dealing with multiple Suppliers or metering agents for a single property.
- As an Energy Supplier, I need to be able to send and receive data, from the CMRC related to interference, faults, or damage to my equipment so that I can fulfil my obligations. As an Energy Supplier I need a coordinated approach to resolving the crowded meter room to enable me to meet my regulatory obligations related to Smart Meter installations and Communications. As an Energy Supplier, I want to know of CMR works being carried out so that I am informed of relevant updates regarding RMPs that I supply. In addition, I wish to be informed if the CMRM identifies any metering issues during their initial assessment or rectification works
- As a Distribution Network Operator, I need to be able to send and receive data, from the CMRC related to danger, interference, or damage to my equipment so that I can fulfil my obligations.
- As a MEM I need a co-ordinated approach to resolving the CMR issues, to enable me to install working Smart Meters on site.
Solution documents
Documents Library
05 Jun 2026
Download Crowded Meter Room Webinar 10.08.2023
05 Jun 2026
Download Alt HAN Co - Target Operating Model
Change Plan
Sandbox Decision
Completed
Start:
22 Apr 2022Due:
29 Nov 2022Completion:
29 Nov 2022Sandbox Trial Commences
In Progress
Start:
29 Nov 2022Due:
01 Feb 2023Completion:
Impact Assessment Window
Completed
Start:
06 Jun 2023Due:
09 Jun 2023Completion:
09 Jun 2023Present Extended Plan to Responsible Committee
Completed
Start:
01 Feb 2023Due:
06 Jun 2023Completion:
06 Jun 2023Preliminary Change Report Published
Completed
Start:
09 Jun 2023Due:
04 Aug 2023Completion:
02 Aug 2023Consultation Issued
Completed
Start:
04 Aug 2023Due:
18 Aug 2023Completion:
18 Aug 2023Final Change Report Published
Completed
Start:
18 Aug 2023Due:
08 Dec 2023Completion:
10 Nov 2023Responsible Committee Decision
Completed
Start:
08 Dec 2023Due:
19 Dec 2023Completion:
19 Dec 2023Original submission
Change details
David Jones - -
22 Apr 2022
Change details
Commissioning of Works using shared Meter Operator services by the Crowded Meter Room Co-ordinator (CMRC)
Many GB households are currently unable to enjoy the many benefits of smart metering because they live in places where the components of their “Home Area Network” (HAN) – energy meters, in-home devices and communications hub – are too far apart to connect with each other. For many Multi Dwelling Units (MDUs) e.g. flats, Alternative HAN equipment is required, this will involve the additional use of a wired Point to Point (P2P) device that is installed near to the Electricity Smart Meter and connected to the tails of that Smart Meter and at least one further device in the customers premises. Work by Alt HAN Co since 2020, in collaboration with industry has identified the additional challenge posed by 'Crowded Meter Rooms' for the installation of Alt HAN and smart equipment.
A Crowded Meter Room, is a scenario whereby a Meter Room or Meter Cupboard, containing a collocation of Meter Points in space constrained by inhibiting factors, resulting in challenges to installing or replacing Metering infrastructure, specifically Alt HAN Equipment. In addition, SMETS2 installations could be prohibited without corrective works.
It is estimated that Crowded Meter Rooms may impact the full HAN enabled provision of Smart for an estimated c30K multi-occupancy dwellings.
As a result of industry discussions, Alt HAN Co identified the concept of a Crowded Meter Room Co-ordinator (CMRC) who can assess potential CMR buildings and identify the costs and options for resolving CMR issues and, where it is cost effective to do so, be able to commission necessary metering works, using a shared Meter Operator, working on behalf of all Registered Suppliers, DNOs, BNOs and other appointed MEMs to resolve meter room issues to those metering points in the CMR, to enable the installation of Smart and Alt HAN equipment.
A Crowded Meter Room, is a scenario whereby a Meter Room or Meter Cupboard, containing a collocation of Meter Points in space constrained by inhibiting factors, resulting in challenges to installing or replacing Metering infrastructure, specifically Alt HAN Equipment. In addition, SMETS2 installations could be prohibited without corrective works.
It is estimated that Crowded Meter Rooms may impact the full HAN enabled provision of Smart for an estimated c30K multi-occupancy dwellings.
As a result of industry discussions, Alt HAN Co identified the concept of a Crowded Meter Room Co-ordinator (CMRC) who can assess potential CMR buildings and identify the costs and options for resolving CMR issues and, where it is cost effective to do so, be able to commission necessary metering works, using a shared Meter Operator, working on behalf of all Registered Suppliers, DNOs, BNOs and other appointed MEMs to resolve meter room issues to those metering points in the CMR, to enable the installation of Smart and Alt HAN equipment.
A Crowded Meter Room (CMR), is a scenario whereby a Meter Room or Meter Cupboard, containing a collocation of Meter Points in space constrained resulting in challenges to installing or replacing Metering infrastructure, specifically Alt HAN Equipment. Additionally, SMETS2 installations could be prohibited without corrective works.
Without the ability to install the Alt HAN wired Bridge Device (and in some cases, even the SMETS2 Smart Meter itself) where the Meter Point is an Alt HAN Candidate, Energy Suppliers are ultimately unable to establish a HAN with the associated premises in the MDU, or any associated remote Gas Meter Points (GSME / MPRNs).
Without the ability to install the Alt HAN wired Bridge Device (and in some cases, even the SMETS2 Smart Meter itself) where the Meter Point is an Alt HAN Candidate, Energy Suppliers are ultimately unable to establish a HAN with the associated premises in the MDU, or any associated remote Gas Meter Points (GSME / MPRNs).
A process/mechanism for resolving CMRs, to enable Suppliers to fully deploy solutions to establish a HAN for all Alt HAN Candidates (and potentially any corresponding SMETS2 candidates). Alt HAN is progressing work to establish a CMR Coordinator and a DCUSA change has been raised to establish permissions for a Shared Meter Operator to undertake CMR works, where such work is approved. A consequential change is required under the REC to allow for a Shared Meter Operator to utilise existing industry data flows when undertaking works to resolve CMR issues, when not the registered Meter Operator to the meter point.
Alt HAN has progressed work since 2020 on the CMR issue and reported progress and proposals to BEIS' SMOG, the Alt HAN Forum and through engagement with industry and consultation. A DCUSA Change Proposal DCP400 has been raised to allow the Alt HAN Company to accede to the DCUSA, so that it may act as the Crowded Meter Room Co-ordinator, and commission works to resolve the CMRs, with permission from DNOs, Suppliers, MEMs and Building Network Owners (BNO).
Impacts
Electricity, Gas, Domestic Prepayment, Domestic Credit
Billing accuracy, On site experience, Other (please provide details in Additional information box below)
The CMR proposals will help alleviate issues currently faced by industry and customers who have been unable to secure their smart meter installs due to the current lack of a co-ordinated approach (as the responsibility for resolving CMR issues cuts across numerous jurisdictions and requires coordinated activity). These delays result in jobs and smart installs being aborted which inhibits progress towards the smart rollout and wider net zero ambitions and the ability of customers to realise smart benefits .
REC Main Body, Schedule 1 - Interpretations and Definitions, Schedule 3 - Accession Agreement, Schedule 9 - Qualification and Maintenance, Schedule 14 - Metering Operations
-
No details provided
-
No details provided
-
Market Message Catalogue
-
No details provided
-
No details provided
-
Energy Suppliers, Distribution Network Operators, Data Collectors, Data Aggregators, Meter Asset Providers, AMR Service Providers
-
Distribution Connection and Use of System Agreement (DCUSA)
-
No
No details provided
Priority & timing
No
-
The DCUSA timeline proposed to allow for their change proposal is looking for a decision to be voted on in August 2022, and an Authority decision by 20 September 2022. However, there has not been a discussion on how a REC Change Plan would impact this timeline.
Approval of DCP 400 and subsequent Accession by the Alt HAN Co to the DCUSA
No details provided
-