Amendment to the ‘Supplier Registration Report (MAP)’ report methodology
Summary
Meter Asset Providers (MAPs) can query the Gas Enquiry Service (GES) as part of their billing process to establish the Registered Gas Suppliers of their portfolio of Metering Assets. The reports via which MAPs can query the GES are not currently working exactly as intended due to incorrect wording in the GES Definition; this change seeks to rectify that.
Latest update and next planned activity
Date of latest update
Latest Update
28/06/2024 - Change implemented as part of the June 2024 REC Release
Impacts Overview
Priority and rationale
Standard
Solution development
Problem Statement
The GES Service Definition defines two reports that MAPs can use to query the CDSP to find out which Registered Gas Suppliers supply Metering Assets in their portfolio, so that they can bill them. Due to a drafting error in the GES Service Definition, this report is not working as intended, and MAPs are not able to ascertain the Registered Gas Supplier for their entire portfolio. This change seeks to rectify the drafting error and restore the intended functionality of the two reports.
Proposed solution summary
- As a Registered Gas Supplier, I want to receive accurate invoices from MAPs for use of their Metering Assets, so that I am not over or under charged. 2 - As a MAP, I want to be able to access accurate information about my portfolio so that I can be correctly remunerated by Suppliers. 3 - As the GES Provider, I want the reports that I am obligated to provide to be correctly defined, so that I am able to provide accurate data to MAPs regarding their portfolios.
Solution documents
05 Jun 2026
05 Jun 2026
Documents Library
Change Plan
Preliminary Change Report Issued
Completed
Start:
08 Feb 2024Due:
15 Mar 2024Completion:
15 Mar 2024Consultation Issued
Completed
Start:
15 Mar 2024Due:
15 Mar 2024Completion:
15 Mar 2024Final Change Report Issued
Completed
Start:
15 Mar 2024Due:
12 Apr 2024Completion:
12 Apr 2024Responsible Committee Decision
Completed
Start:
12 Apr 2024Due:
24 Apr 2024Completion:
24 Apr 2024Appeal Window Closure
Not Started
Start:
24 Apr 2024Due:
08 May 2024Completion:
Original submission
Change details
David Addison - Xoserve
8 Feb 2024
Change details
Amendment to the ‘Supplier Registration Report (MAP)’ report methodology
As part of the services within the Gas Enquiry Service the MAP receives two reports that are described in this manner in the GES Service Definition (v1.2).
*Please see Figure 1: GES Service Definition v1.2 Extract attached
Both reports are described as having to have the MAP recorded in the Central Gas Register (highlighted).
Following a query into the report methodology initiated by the CDSP as part of their reporting checks it was identified that reports were being issued to MAPs that contained Supply Meter Points that did not have the requesting MAP recorded in the UK Link system as the MAP for that Supply Meter Point.
The Supplier Registration Report was designed to enable MAPs to provide their portfolio of Supply Meter Points along with Meter Serial Number and Model Details. Provided the details provided by the MAP matched the UK Link Supply Point Register the CDSP would provide details to that MAP of the Registered Supplier at the Supply Meter Point. As this report was originally developed in 2013 there was no intention to check whether the MP was recorded at the Supply Meter Point in UK Link systems – as the MAP was not recorded in UK Link at this time.
Following investigation into the history of this report, through the Modifications that initiated the report and subsequently amended the governance into the Data Permissions Matrix (UNC Modifications 0422; 0637S; 0684S; 0697VS) and then subsequent migration to the REC,we can find no evidence that there was any intention that the report methodology was intended to be changed at the point that the GES Services migrated to REC.
Consequently we conclude that the highlighted text in the GES Service Definition is incorrect drafting.
*Please see Figure 2 in the attachment
As part of this change, it is proposed that the documentation related to this report be assessed and amended as necessary to remove errors.
*Please see Figure 1: GES Service Definition v1.2 Extract attached
Both reports are described as having to have the MAP recorded in the Central Gas Register (highlighted).
Following a query into the report methodology initiated by the CDSP as part of their reporting checks it was identified that reports were being issued to MAPs that contained Supply Meter Points that did not have the requesting MAP recorded in the UK Link system as the MAP for that Supply Meter Point.
The Supplier Registration Report was designed to enable MAPs to provide their portfolio of Supply Meter Points along with Meter Serial Number and Model Details. Provided the details provided by the MAP matched the UK Link Supply Point Register the CDSP would provide details to that MAP of the Registered Supplier at the Supply Meter Point. As this report was originally developed in 2013 there was no intention to check whether the MP was recorded at the Supply Meter Point in UK Link systems – as the MAP was not recorded in UK Link at this time.
Following investigation into the history of this report, through the Modifications that initiated the report and subsequently amended the governance into the Data Permissions Matrix (UNC Modifications 0422; 0637S; 0684S; 0697VS) and then subsequent migration to the REC,we can find no evidence that there was any intention that the report methodology was intended to be changed at the point that the GES Services migrated to REC.
Consequently we conclude that the highlighted text in the GES Service Definition is incorrect drafting.
*Please see Figure 2 in the attachment
As part of this change, it is proposed that the documentation related to this report be assessed and amended as necessary to remove errors.
As a consequence of the risk of non-conformance with the specification of the report that could have been releasing data that it should not have been, the ‘Supplier Registration Report (MAP)’ report was amended as a precaution to only provide this where the MAP was recorded against the Supply Meter Point in the Supply Point Register in accordance with the statement highlighted above.
We consider that the change made to report functionality in light of the potential non-compliance was the right course of action in the short term.
Given our conclusion that the ‘non-compliance’ was caused by erroneous drafting of the GES Service Definition we have obtained confirmation from RECCo that we can revert to the original report methodology and remove the check that the MAP is appointed in the UK Link Supply Point Register.
This change will remove the erroneous drafting.
We consider that the change made to report functionality in light of the potential non-compliance was the right course of action in the short term.
Given our conclusion that the ‘non-compliance’ was caused by erroneous drafting of the GES Service Definition we have obtained confirmation from RECCo that we can revert to the original report methodology and remove the check that the MAP is appointed in the UK Link Supply Point Register.
This change will remove the erroneous drafting.
CDSP have agreed to raise a REC Change that will look to resolve the inconsistencies in the following documents:
- GES Service Definition – Amend ‘Supplier Registration Report (MAP)’ Report text to state: ‘A report provided on request to the relevant MAP detailing the Supply Meter Point and Metering Asset details for all Supply Meter Points where the MAP meets the “Meter Point Request Information” criteria”.
- Data Access Matrix - Assess the references to the Community view in light of the [“Meter Point Request Information”] criteria, and potentially apply ‘CC06’ solely to this column. Note: this assessment will also need to consider other MAP Services (i.e. the Meter Asset Enquiry API) and the extent to which this information is provided based on record of the MAP Id in UK Link systems. This change will also consider the population of this column.
- GES Report Technical Specification – ‘Supplier Registration Report (MAP)’ to ensure that the specification reflects the methodology for report production.
- GES Service Definition – Amend ‘Supplier Registration Report (MAP)’ Report text to state: ‘A report provided on request to the relevant MAP detailing the Supply Meter Point and Metering Asset details for all Supply Meter Points where the MAP meets the “Meter Point Request Information” criteria”.
- Data Access Matrix - Assess the references to the Community view in light of the [“Meter Point Request Information”] criteria, and potentially apply ‘CC06’ solely to this column. Note: this assessment will also need to consider other MAP Services (i.e. the Meter Asset Enquiry API) and the extent to which this information is provided based on record of the MAP Id in UK Link systems. This change will also consider the population of this column.
- GES Report Technical Specification – ‘Supplier Registration Report (MAP)’ to ensure that the specification reflects the methodology for report production.
This ‘Supplier Registration Report (MAP)’ has been provisioned to Meter Asset Providers since the implementation of UNC Modification 0422 on 1st April 2013. The Modification predates the recording of the Meter Asset Provider in the UK Link system, therefore the entitlement to data related to a given Supply Meter Point details was determined by the provision of “Meter Point Request Information” (UNC TPD V 5.16.2) asset by the Meter Asset Provider. Where this information matched the Supply Point Register then the information would be provided. This information was: Meter Point Reference Number; Meter Serial Number and Model Name.
UNC TPD V5.16 was amended in Modification 0637S – which amended the Meter Point Request Information to mean that the Model detail was only validated on meters with a capacity greater than 11m3.
UNC Modification 0684S added the Meter Asset Provider to the Data Permissions Matrix (and the DPM Conditionality Document) from 28th June 2019. The above text endured in UNC TPD V5.16 – i.e. the determination of the provision of information to the MAP was based on the Meter Point Request Information.
UNC Modification 0697VS rationalised the UNC in light of the DPM. Where a party’s access to data was governed by the DPM, then the detail of the release of data was removed from the UNC itself.
The DPM Conditionality Document was amended to state:
* Please See figure 3 in the attachment
The legal text related to MAPs was as follows prior to 0697VS being implemented. 697VS removed the following text (note: emphasis added to show ‘Meter Point Request Information’ and the outcome where this matched, also note this text is from David Addison annotated text to the legal text provider and is NOT the formal text extract from 2020):
*Please see Figure 4: UNC TPD V 5.16 Extract in the attached document.
Note: within the introduction to Mod 0697VS presented in June 2019 to the UNC distribution Workgroup, it was explicitly stated that the UNC TPD V 5.16 principle should endure:
https://www.gasgovernance.co.uk/sites/default/files/ggf/2019-06/PreMod%20-%20V5%20DPM%20Enhancement%20v1a%2020190620.pdf
*Please see Figure 5: UNC Mod 0697VS Pre-Mod Slides in the attachment
The following text was inserted into the DPM Conditionality document related to the provision of data to the Meter Asset Provider (highlights added). A full version is shown in the appendix of this section (note: the qualification to source being a version used for drafting):
The data items migrated across to the Data Access Matrix at REC v3 implementation when the Gas Enquiry Service was managed under the REC.
The DAM shows the following conditions:
*Please refer to Reference 6 in the attachment
UNC TPD V5.16 was amended in Modification 0637S – which amended the Meter Point Request Information to mean that the Model detail was only validated on meters with a capacity greater than 11m3.
UNC Modification 0684S added the Meter Asset Provider to the Data Permissions Matrix (and the DPM Conditionality Document) from 28th June 2019. The above text endured in UNC TPD V5.16 – i.e. the determination of the provision of information to the MAP was based on the Meter Point Request Information.
UNC Modification 0697VS rationalised the UNC in light of the DPM. Where a party’s access to data was governed by the DPM, then the detail of the release of data was removed from the UNC itself.
The DPM Conditionality Document was amended to state:
* Please See figure 3 in the attachment
The legal text related to MAPs was as follows prior to 0697VS being implemented. 697VS removed the following text (note: emphasis added to show ‘Meter Point Request Information’ and the outcome where this matched, also note this text is from David Addison annotated text to the legal text provider and is NOT the formal text extract from 2020):
*Please see Figure 4: UNC TPD V 5.16 Extract in the attached document.
Note: within the introduction to Mod 0697VS presented in June 2019 to the UNC distribution Workgroup, it was explicitly stated that the UNC TPD V 5.16 principle should endure:
https://www.gasgovernance.co.uk/sites/default/files/ggf/2019-06/PreMod%20-%20V5%20DPM%20Enhancement%20v1a%2020190620.pdf
*Please see Figure 5: UNC Mod 0697VS Pre-Mod Slides in the attachment
The following text was inserted into the DPM Conditionality document related to the provision of data to the Meter Asset Provider (highlights added). A full version is shown in the appendix of this section (note: the qualification to source being a version used for drafting):
The data items migrated across to the Data Access Matrix at REC v3 implementation when the Gas Enquiry Service was managed under the REC.
The DAM shows the following conditions:
*Please refer to Reference 6 in the attachment
Impacts
Gas, Domestic Prepayment, Domestic Credit, Microbusiness, Small and Medium Enterprise (SME), Industrial and Commercial (I&C)
Billing accuracy
UNC Mod 0422 originally was implemented to enable MAP billing accuracy to Suppliers.
No details provided
-
No details provided
-
No details provided
-
Data Access Matrix
-
No details provided
-
Gas Enquiry Service
This will affect the Gas Enquiry Service Definition. It is expected that following reversal of the reporting change that there will be no functional impacts.
Meter Asset Providers
CDSP
No details provided
This does not explicitly impact any other Codes following migration of the report into REC from UNC and IGT UNC.
No
No details provided
Priority & timing
No
-
No
None identified
No details provided
-