Change to Location (A0059) data item within the ONAGE APPT file to MAMs, from ‘Optional’ to ‘Mandatory’
Date of latest update
Type
Change
ID
R0337
Priority
Urgent
No
Latest Update
17/11/2026 - Change Report (Proposal Plan) approved by the REC Change Panel.
Summary
Currently, the location (A0059) data item within the ONAGE APPT file from Suppliers to MAMs is Optional, this allows a Supplier to leave this field blank. Currently SGNCS system functionality is designed to reject the file if this field is blank. This is due to SGNCS requiring to hold the location of the meter installation in order to allow us to deliver on our safety obligations as a MAM in maintaining of an asset.
Impacted REC Documents
Status
Status
Implementation Status
Date Raised
Fuel
Solution Development
Proposed Solution Document
Document title
I0337 legal text changes
Upload document
I0337 proposed solution.pdf
Archive
Off
Problem Statement
ONAGE files are Market Messages sent from Gas Suppliers to Gas Metering Asset Managers (MAMs) to appoint or de-appoint the MAM following a change of Energy Supplier or a change of MAM. The 'Location Code' (A0059) Data Item within ONAGE tells MAMs where a meter is located within the property (“01 = cellar”, “02 = under stairs”, etc). A0059 is currently an 'Optional' data item, which means that ONAGE entries are valid even where A0059 is blank. Although most Energy Suppliers send ONAGE files that always have A0059 populated, including when it is "00 = unknown", it is possible for ONAGE files to be sent with a blank ‘Location Code’. This Issue was raised by a MAM who has identified that this leads to rejections of the ONAGE appointment (APPT) files where the A0059 is left blank as this is a mandatory field in their internal systems. The location of the meter installation is also required for MAMs to deliver their safety and asset maintenance obligations.
Stages Selection
Stages Selection
Workgroup
Workgroup(s)
I0337 submission form
Company Name
-
Review status
Review required
Provision of data to the GES Provider
Date of latest update
Type
Issue
ID
I0302
Change Category
Change Path
Priority
Urgent
No
Latest Update
26/08/2026 On 26 August 2026, in line with the Code Manager's recommendation, TEP approved the extension to plan for I0302.
Summary
RECCo has commenced work on developing a dual-fuel Enquiry Service which will involve the migration of data from its legacy services.
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
Ahead of the introduction of a dual-fuel Enquiry Service and in the case that the GES Provider is not the same entity as the CDSP and GRDA, this Issue seeks to enable the migration of gas data from legacy services into a new physical interface.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Workgroup
Workgroup(s)
I0302 submission form
I0302 Change Report (Proposal Plan) v1.0
I0302 Change Report (Update to Plan) v1.0 Approved 15.04.26
I0302 Change Report (Extension to Plan) v1.0 Approved 26.08.2026
Company Name
REC Code Manager
Review status
Review required
Data Latency Targets for the GES Service Definition
Date of latest update
Type
Change
ID
R0299
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
R0277 – Data Latency SLA alignment for Gas Enquiry Service amended two performance levels within the Gas Enquiry Service (GES) Service Definition. However, these changes only addressed ambiguity on when the performance level applied from and to and increased the number of hours in which data will be available to Authorised Persons within the Supply Point Switching API. This change will seek to support the changes made under R0277 whilst also providing a suitable percentage SLA target for the Gas Enquiry Service Provider to meet these measures.
Change Plan
Proposal Plan approved
Completed
Start:
Due:
17 Feb 2026Completion:
17 Feb 2026Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
26 June 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0299 Legal Text for Consultation
Upload document
R0299 Legal Text for Consultation.zip
Archive
Off
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0299 submission form
R0299 Change Report v1.0 (Consultation) APPROVED
R0299 Change Report (Final Recommendation) v1.0 APPROVED
Company Name
REC Code Manager
Review status
Review required
Data Latency SLA Alignment for Gas Enquiry Service
Date of latest update
Type
Change
ID
R0277
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
The current performance level for the processing of Data from CDSP is no longer fit for purpose and does not reflect the operational capability of the service. The performance level was originally conceived as part of the CSS programme in 2022 and operational reality has shown it is not required by industry. A revision of the performance level will align service performance metrics with system performance and deliver economic benefit.
Change Plan
Proposal Plan approved at Change Panel
Completed
Start:
Due:
Completion:
07 Oct 2025Final Recommendation approved at TEP
Completed
Start:
Due:
Completion:
26 Nov 2025Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
27 February 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0179 | Proposal for Limiting Queries in EES API Calls (Single Query per API Call) | |
| R0190 | Related Meter Point RMP status rules |
|
| R0198 | Metering Asset Manager (MAM) Communication Method Register | |
| R0242 | Missing Scenario Variant from R0043 |
|
| R0244 | C21 to be introduced into STIRG Document |
|
| R0235A | Missing Scenario Variants in D0179 Alternate Solution | |
| R0256 | MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101 |
|
| R0270 | Clarification of SIP Qualification Requirements |
|
| R0271 | Clarification of ASP, AMI, and EMO Accession Requirements |
|
| R0272 | Enabling transparency of the CRS Provider’s REC service level performance |
|
| R0277 | Data Latency SLA Alignment for Gas Enquiry Service |
|
| R0280 | CSS Certificate Authority audit clarification |
|
| R0283 | Annual Address Management Plan Updates |
|
| R0287 | Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations |
|
| R0293 | Housekeeping February 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0277 Legal Text For Consultation
Upload document
R0277 Legal Text For Consultation.zip
Archive
Off
Problem Statement
The current performance levels for the processing of data from CDSP is no longer fit for purpose and does not align with system or service performance. The CSDP is also not meeting these performance levels on a monthly basis. While there are no known issues on data latency raised by users, this change to clarify performance levels is needed for the GES reinstated contract and to ensure ongoing service delivery.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0277 submission form
I0277 Change Report (Proposal Plan) approved 07/10/2025
R0277 Change Report (For Consultation) v1.0
R0277 Change Report (Final Recommendation) Approved 26.11.25 v1.0
Company Name
RECCo
Review status
Review required
Gas Pressure and Capacity Information Transparency
Date of latest update
Type
Issue
ID
I0274
Change Category
Change Path
Priority
Urgent
No
Latest Update
21/07/2026 - Change Report (Proposal Re-Plan) approved at Change Panel
Summary
As per Section 13.4.18 of CoMCoP, retrieving gas pressure and capacity information from Transporters via the GT1 process can be time consuming for Energy Suppliers/MAMs and/or Consumers. The process of retrieving this information is inconsistent and service timescales are varied between transporters. Gas pressure and capacity information should be readily available through the Gas Enquiry Service to enable timely processing of site work and requests to enable MAM’s and Suppliers to appropriately service their customers.
Change Plan
Change Report (Proposal Plan) approved at Change Panel
Completed
Start:
Due:
Completion:
18 Nov 2025Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
For some Energy Suppliers, MAMs and consumers, retrieving pressure and capacity information via the GT1 process can be time consuming. This is due to elements like response timescales and methods (batch responses vs individual responses) being varied among GTs. This ultimately has a negative impact on customers waiting on site work, such as a new connection, for example.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0274 submission form
I0274 Change Report (Proposal Plan) V1.0 approved 18.11.25
IG174 Change Proposal Re-Plan v2.0 approved 21.07.2026
Company Name
OVO Energy
Review status
Review required
Additional Registration Data (Gas) under Smart Energy Code
Date of latest update
Type
Issue
ID
I0262
Change Category
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
30/09/2026 - Change Report Re-Plan V5.0 approved by Change Panel.
Summary
Gas Transporters (GTs) only have a single obligation in the Smart Energy Code (SEC). This obligation relates to the provision of Registration Data to the DCC. This issue is exploring whether these obligations may be transferred to the REC.
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
Gas Transporters have very few obligations under the Smart Energy Code; those that they do have relate to provision of data owned by the REC. If these obligations were to be moved from the SEC to the REC, then the regulatory burden on GTs may be reduced as they would be able to completely secede from the SEC.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Change Proposal Submission form
I0262 Change Report (Plan) (Approved) V5.0 19.06.26
I0262 Change Report Re-Plan V4.0 19.06
I0262 Change Report Re-Plan V5.0 Approved 30.09.2026
Company Name
Northern Gas Networks Ltd
Review status
Review required
Addition of the SOQ information for TPIs
Date of latest update
Type
Issue
ID
I0260
Priority
Urgent
No
Latest Update
28/07/2026 - update to plan published for decision at the Change Panel on 4 August 2026.
Summary
As TPIs we are employed by our customers to check that the charges are being applied correctly. One of the big issues year after year is when the SOQ changes for a supply prior to the next supply contract renewal. As you are hopefully aware, the standing charges for Gas supplies are primarily built up around the Transportation charges. And one of the main component parts in the calculation of the standing charge is the SOQ. When we are asked to :- a) Validate the standing charge on any new offer, we are reliant on the supplier simply getting the SOQ correct. We need to see the SOQ so that we can work out what the standing charge should be. - then we challenge the supplier before they get the charges wrong. b) Our customers also want us to forecast the rates/costs for the coming year. This is impossible without access to the SOQ.
Status
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Issue Proposal form
I0260 Change Proposal Plan - On Hold.pdf
Company Name
Sustainable Energy First
Review status
Review required
Increasing frequency of Annual portfolio reconciliation exercise to support Data Cleanse
Consultation
Date of latest update
Type
Change
ID
R0252
Change Category
Change Path
Priority
Urgent
No
Latest Update
11/11/2026 - Consultation published with a closure date of 25/11/2026, following the approval of the Change Report (Consultation) by the REC Metering Expert Panel.
Summary
This Issue seeks to explore making changes to both the frequency and turnaround time of the annual portfolio reconciliation exercise conducted by the CDSP.
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0252 Legal Drafting V2.0
Upload document
R0252 Proposed Solution.zip
Archive
Off
Document title
R0252 Proposed Solution V3.0
Upload document
R0252 Proposed Solution V3.0.zip
Archive
Off
Problem Statement
The annual portfolio reconciliation exercise conducted by the CDSP on MAM-held Data Items is neither frequent enough nor is it expeditious enough, according to the Proposer. MAMs are being asked to reconcile Data Items several months after they were initially provided, which may impact the efficacy of the exercise if these Data Items have changes since they were initially submitted.
Stages Selection
SME
SME Role
Lead Assurance Analyst
Workgroup
Workgroup(s)
R0252 - Issue Proposal V1.0
R0252 - Change Report (Plan) (Approved) V3.0 04.02.26
R0252 - Change Report (IA) V1.0 12.02.26
R0252 Consolidated Party IA Responses V1.0
R0252 Change Proposal Re-Plan (Approved) V1.0 21.10.25
R0252 Change Proposal Re-Plan (Approved) V2.0 27.01
R0252 Change Proposal Re-Plan (Approved) V3.0
R0252 Change Proposal Re-Plan (Approved) V4.0
R0252 Change Proposal Re-Plan V5.0 (Approved) 02.09.26
Company Name
RIG Chair
Review status
Review required
Supply Point Enquiry API Technical Specification Updates
Date of latest update
Type
Change
ID
R0229
Change Category
Change Path
Priority
Urgent
No
Latest Update
10/02/2025 - Change withdrawn and will be progressed as a Housekeeping change under R0239 Housekeeping Feb 2025. The adoption window has now closed.
Summary
The content detailed in Section 4.2 Responses is incorrect. We would like to amend the responses included in this section so that users are able to access the correct technical specifications for the service that they are consuming.
Change Plan
Change discussed at Change Panel
Completed
Start:
Due:
Completion:
21 Jan 2025Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
The example responses detailed in section 4.2 are broken down as ‘mprn’ with three demoed data items; ‘mprn’, ‘installation name’, and ‘network name.’ this is however not reflective of the correct responses that would actually be returned on an API call. The actual structure is ‘supplier’ with the demoted data items actually being ‘amr_indicator’, ‘amr-sp’, and ‘csep_id.’ Fundamentally, this would mean that users are consuming incorrect information when looking to this document for guidance. This could potentially be causing negative impacts when the document is relied upon, especially for newer users seeking guidance.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
API GES Supply Point Enquiry Technical Specification v2.0.pdf
Change Proposal Form
Company Name
Xoserve
Review status
Review required
Stranded RMPs in Defunct Suppliers
Date of latest update
Type
Issue
ID
I0219
Change Path
Priority
Urgent
No
Latest Update
27/02/2025 - Change is now not being merged into any other changes and will proceed as a standalone change. A potential solution has been identified, but will be discussed for potential cross code impacts
Summary
Currently within Schedule 23 a Registration can only be undertaken on RMPs with an Operational or Dormant RMP Status, and not Terminated. Terminated is a status that the RMP is set to when the Meter Point Status is no longer operational or the site is isolated. It is right that these sites are not able to be Registered as there is a risk that Suppliers could inadvertently Register such Meter Points. We do have instances where such sites are stranded in defunct Supplier portfolios - and the Supplier no longer has the capability to take the relevant action to Deactivate the Registrations. This may because the operational staff have left and the business is in administration.
Change Plan
Discussed at Technical Change Workshop
Completed
Start:
Due:
Completion:
25 Feb 2025Impacted Consumers
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
Issue Proposal Form
Company Name
Xoserve
Review status
Review required