Import / Export MOA Charging Clarification
Summary
BSC Mod 459 and REC CP R0144 were raised to allow different MOAs to be appointed for the import and export MPANs on a shared meter. One of the justifications for this was to stop export suppliers being charged inflated rates. Both changes have been placed on hold due to the MHHS Programme so this change has been raised to specifically resolve the charging issue.
Latest update and next planned activity
Date of latest update
Latest Update
06/11/26 - This Change Proposal has been implemented as part of the 6 November 2026 REC Release.
Impacts Overview
Impacted REC Parties and Market Participants
Advanced Meter Equipment Manager (T)
Electricity Meter Operator (M)
Smart Meter Equipment Manager (S)
Energy Supplier (ES)
Impacted REC Documents
Schedule 14 - Metering Operations
Priority and rationale
Standard
Change Reports, Impact Assessments, Consultations and Documents
Change Reports
Solution development
Problem Statement
Where the same electricity Metering Asset is being used for the measurement of Import and Export for more than one Metering Point, the Export MOA must be the same as the Import MOA. This may result in uncompetitive charging by the MOA, as the Export Supplier has no choice in their appointment.
Solution documents
Documents Library
02 Nov 2026
Download Authority decision to approve R0207
05 Jun 2026
Download R0207 Revised Solution - Legal Text
Change Plan
Final recommendation to Metering Expert Panel
Completed
Start:
Due:
Completion:
12 Mar 2025Sent to Authority for determination
Completed
Start:
Due:
Completion:
13 Mar 2025Original submission
Change details
Lorna Mallon - Gemserv
29 Aug 2024
Change details
Import / Export MOA Charging Clarification
BSC Mod 459 and REC CP R0144 were raised to allow different MOAs to be appointed for the import and export MPANs on a shared meter. One of the justifications for this was to stop export suppliers being charged inflated rates.
Both changes have been placed on hold due to the MHHS Programme so this change has been raised to specifically resolve the charging issue.
Both changes have been placed on hold due to the MHHS Programme so this change has been raised to specifically resolve the charging issue.
Export suppliers may be being charged inflated MOA charges by the import MOA. The export supplier has no choice but to appoint the export MOA, as set out in Schedule 14.
Update Schedule 14 clause 2.4 with the following:
2.4A Where the same electricity Metering Asset is being utilised for the measurement of Import and/or Export for more than one Metering Point, the appointed Meter Operative Agent shall, so far as reasonably practicable, treat all Suppliers in the same manner as regards costs charged by it.
2.4A Where the same electricity Metering Asset is being utilised for the measurement of Import and/or Export for more than one Metering Point, the appointed Meter Operative Agent shall, so far as reasonably practicable, treat all Suppliers in the same manner as regards costs charged by it.
This solution has already been discussed with the proposer of P459 and R0144 who has confirmed that, if implemented, it would resolve the charging issue they flagged.
The solution has also been raised with Elexon and the REC legal support.
The drafting used is similar to an existing clauses 21.5.1 and 21.5.2 within CoMCoP.
The solution has also been raised with Elexon and the REC legal support.
The drafting used is similar to an existing clauses 21.5.1 and 21.5.2 within CoMCoP.
Impacts
Electricity, Domestic Prepayment, Domestic Credit, Microbusiness, Small and Medium Enterprise (SME)
Switching experience, Billing accuracy, Trust and confidence, Security of supply
-
Schedule 14 - Metering Operations
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No
No details provided
Priority & timing
No
-
No
No
No details provided
-