Addition of Export flag in D0303 flows
Summary
The Market Message (D0303 / MM00240) responsible for informing Metering Asset Providers (MAPs) of Metering Equipment installation is generating a lot of queries and exceptions due to Export MPAN creation. This is requiring MAPs to manually investigate whether a D0303 showing a Metering Asset being installed against a second Metering Point is a correction or the creation of an Export MPAN that can be ignored. Due to the growing uptake of microgeneration this is a problem that is growing in volume.
Latest update and next planned activity
Date of latest update
Latest Update
06/11/26 - This Change Proposal has been implemented as part of the 6 November 2026 REC Release.
Impacts Overview
Impacted REC Parties and Market Participants
Advanced Meter Equipment Manager (T)
Electricity Meter Operator (M)
Smart Meter Equipment Manager (S)
Electricity Meter Asset Provider (8)
Gas Meter Asset Provider (MAP)
Impacted REC Services
Electricity Enquiry Service (EES)
Priority and rationale
Standard
Solution development
Problem Statement
MAPs must manually check D0303 Market Messages received with duplicated Metering Equipment (e.g. duplicated Meter Serial Number) to ensure they hold the correct Metering Equipment against the correct Metering Point. For Export Metering Points using the same Metering Equipment as the Import Metering Point, this manual check results in no action needing to be taken.
Solution documents
Documents Library
Change Plan
Change Report (Proposal Plan) approved at Change Panel
Completed
Start:
Due:
Completion:
04 Nov 2025Presented at Change Issues Group
Completed
Start:
Due:
Completion:
05 Feb 2026Change Report (For Consultation) approved at TEP
Completed
Start:
Due:
Completion:
25 Mar 2026Change Report (Final Recommendation) approved at TEP
Completed
Start:
Due:
Completion:
27 May 2026Original submission
Change details
Stuart Blair - Centrica Smart Meter Assets
5 Jun 2025
Change details
Addition of Export flag in D0303 flows
flows responsible for informing MAPs of installation are being polluted by Export MPAN creation.
The impact to MAPs is currently a requirement to manually investigate whether or not an installation flow showing an asset being stalled in a second location is a corrective flow on an asset or a flow that can be ignored. Due to the growing affordability of microgeneration this is a problem that is growing in volume.
a flag indicating whether or not an MPAN is an export MPAN to be included in the meter point details.
-
Impacts
Electricity
Other (please provide details in Additional information box below)
Whilst this change has minor impact to consumers, it will allow MAPs to more accurately bill the correct supplier, and reduce the likelihood of inaccurate bills created by export MPANs being treated as import.
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
-
No details provided
Priority & timing
No
-
-
-
No details provided
Other (please provide details in the Additional information box below)