Amendment to Multiplication Factor Enumerations to Support Hydrogen Trials
Summary
The H100 hydrogen gas trial involves the supply of hydrogen gas to households in place of natural gas. The quantity of gas supplies needs to be billed in a way that is comparable to standard gas supply. To facilitate the trial, a multiplication factor enumeration value must be established within the Data Specification that can replicate hydrogen’s calorific value, therefore allowing accurate billing.
Latest update and next planned activity
Date of latest update
Latest Update
28/06/2024 - Change implemented as part of the June 2024 REC Release
Impacts Overview
Impacted Consumers
Non-Domestic
Domestic
Impacted REC Parties and Market Participants
Electricity Distribution Network Operator (R)
Electricity Meter Asset Provider (8)
Gas Meter Asset Provider (MAP)
Shipper (SHP)
Energy Supplier (ES)
Impacted REC Documents
Data Item Catalogue
Impacted REC Services
Gas Enquiry Service (GES)
Central Switching Service (CSS)
Other Industry Codes impacted
Uniform Network Code (UNC)
Priority and rationale
Standard
Solution development
Problem Statement
In order for the H100 gas trial to be successful, a billable value for hydrogen gas needs to be accurately calculated from supplied physical volumes. To do this, relevant Data Items (relating to the calculation of billable gas volumes) within the Data Specification need to be updated to allow a new value for the multiplication factor. This change seeks to introduce a new enumeration value for the multiplication factor needed to facilitate the addition of this new value.
Proposed solution summary
- As a Consumer taking part in the H100 trial, I want to be charged based on the amount of gas I consume, such that I am not charged more than I would have been, had I consumed the equivalent energy from natural gas.
- As a Gas Supplier, I want to ensure H100 trial Consumers, are not charged more than they would have been, had they consumed the equivalent energy from natural gas. 2- As a Gas Transporter, I want to accurately know how much hydrogen gas is being offtaken, so that I can support Suppliers. 3- As the Central Data Service Provider (CDSP), I want Market Messages relating to meter asset information to be accurate, so that I am better able to support dependant REC Parties. 4- As a Meter Equipment Manager (MEM), I want my metering assets compatible with the H100 trial to be underpinned by accurate Market Messages, so that I able to manage these meters correctly.
Solution documents
Documents Library
Change Plan
SERVICE PROVIDER IMPACT ASSESSMENT ISSUED
Completed
Start:
11 Aug 2023Due:
27 Nov 2023Completion:
27 Nov 2023PARTY IMPACT ASSESSMENT ISSUED
Completed
Start:
27 Nov 2023Due:
01 Dec 2023Completion:
01 Dec 2023PRELIMINARY CHANGE REPORT PUBLISHED
Completed
Start:
01 Dec 2023Due:
19 Jan 2024Completion:
19 Jan 2024CONSULTATION ISSUED
Completed
Start:
19 Jan 2024Due:
19 Jan 2024Completion:
19 Jan 2024FINAL CHANGE REPORT PUBLISHED
Completed
Start:
19 Jan 2024Due:
20 Feb 2024Completion:
16 Feb 2024RESPONSIBLE COMMITTEE DECISION
Completed
Start:
20 Feb 2024Due:
28 Feb 2024Completion:
28 Feb 2024Original submission
Change details
David Addison - Xoserve
11 Aug 2023
Change details
Amendment to Multiplication Factor Enumerations to Support Hydrogen Trials
In order to support Hydrogen Trials the UNC have approved Modification 0799 which is “implementing a solution to adjust end consumers’ metered volumes. This will ensure energy allocation and transportation charges remain reflective of the actual energy consumed at the end consumers’ premises” (UNC Modification 079 – Why Change?). This process requires that the Multiplication Factor which is included within the RGMA flows is amended to allow the MEMs involved in the trials to provide different data values within the Metering data flows, and to allow Meter Models to be loaded in the Meter Model table reflecting such revised values. The enumeration set will conform to the existing length – i.e. between 999.999 and -999.999. It is not anticipated that the value shall be more than three decimal places, nor a negative value.
A single new value will be added to the enumerations to support the adjusting of metered volume. This value will be confirmed aprox.. by the end of 2023 following approval by Ofgem.
A single new value will be added to the enumerations to support the adjusting of metered volume. This value will be confirmed aprox.. by the end of 2023 following approval by Ofgem.
If the enumerations of the Multiplication Factor are not amended then any consumer in the Hydrogen Trials would be disadvantaged in that they would be charged more for the energy that they are consuming.
Amendment to the enumerations for the Multiplication Factor. The values used will not conform to the existing value set (which are powers of 10, including negative powers) and will be a value derived specific to the hydrogen trial.
New Meter Model(s) will be added to the Meter Product Data Table using the relevant change process once the enumeration is added to the Multiplication Factor.
New Meter Model(s) will be added to the Meter Product Data Table using the relevant change process once the enumeration is added to the Multiplication Factor.
-
Impacts
Gas, Domestic Prepayment, Domestic Credit, Microbusiness, Small and Medium Enterprise (SME), Industrial and Commercial (I&C)
Billing accuracy, Trust and confidence
This change is essential for ensuring that the Consumers in the trial area are billed correctly.
No details provided
None of the above are expected to be impacted.
No details provided
-
No details provided
-
Data Item Catalogue
The following data item will have an extended enumeration set.
see attachment (a)
see attachment (a)
No details provided
-
No details provided
None
Energy Suppliers, Distribution Network Operators, Gas Transporters, Shippers, Meter Asset Providers
This change will only impact participants within the trial area – i.e. the DNO, the specific MEM and MAP engaged and the relevant Shipper (s) and Supplier(s).
Uniform Network Code (UNC)
Mod 0799 refers.
No
No details provided
Priority & timing
No
-
The first trial area is expected to be live with consumers using hydrogen by September 2024. Implementation of this change would be beneficial by Q4 2023.
None identified
No details provided
-