Erroneous Switch Review: Assurance Reporting Update
Summary
There is gap in the Erroneous Switch (ES) Performance Assurance reporting as the DTN does not provide MPXN level data up front. It requires individual ES permission before MPXNs are provided. However, CSS reporting does provide monthly MPXN level report. As such end-to-end monitoring of the ES process cannot be carried out at a MPXN level.
Latest update and next planned activity
Date of latest update
Latest Update
On 30 October 2026, the REC Change Panel voted to approve this Extension to Plan for I0326 via ex-committee decision.
Impacts Overview
Priority and rationale
Standard
Solution development
Problem Statement
There is a lack of consistency in the level of data granularity provided for ES Performance Assurance reporting across industry systems. Specifically, the DTN provides only aggregated data unless explicit permission is obtained from individual Energy Suppliers for each MPxN, whereas the CSS routinely produces monthly reports at MPxN level. This misalignment restricts the ability to access comparable, detailed datasets across platforms and prevents effective end-to-end monitoring and assurance of the ES process at MPxN level.
Documents Library
There is currently no Change Plan.
Original submission
Change details
Joy Nnamani - RECCo
12 May 2026
Change details
Erroneous Switch Review: Assurance Reporting Update
There is inconsistency in the granularity of the data provided for Erroneous Switch (ES) Performance Assurance reporting between the Data Transfer Network (DTN) (aggregate) and the Central Switching System (CSS) (MPXN). The DTN does not provide MPXN-level data up front as it requires individual Energy Supplier permission for each MPXN before MPXN-level data is provided. CSS reporting does provide monthly MPXN-level reports. As such, end-to-end monitoring of the ES process cannot be carried out at a MPXN level.
• Risk of incorrect reporting / assurance as there is no end-to-end reporting.
• Known risk of incorrect use of the Erroneous Switch Flag as volumes do not match those of agreed RETs and D0301s
• Additional time and resources for Energy Suppliers, the Code Manager and ElectraLink before the MPXN level data is provided
• Known risk of incorrect use of the Erroneous Switch Flag as volumes do not match those of agreed RETs and D0301s
• Additional time and resources for Energy Suppliers, the Code Manager and ElectraLink before the MPXN level data is provided
Updated Performance Assurance Reporting Catalogue (PARC) to mandate MPXN level data for all ES reporting.
Potential to provide back dated MPXN level data.
Housekeeping changes to the PARC to remove redundant flows from the ES reporting requirements.
Potential to provide back dated MPXN level data.
Housekeeping changes to the PARC to remove redundant flows from the ES reporting requirements.
The I0237 Erroneous Switch Review highlighted this as a “quick win” from the working group. This can be progressed while I0237 continues and alongside R0313 and R0322.
Impacts
All
Ability to pay, Billing accuracy, Switching experience, Trust and confidence
-
No details provided
-
Performance Assurance Report Catalogue
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
Energy Suppliers
-
Other (Please add detail in Additional Information)
Data Transfer Services Agreement (DTSA) who approved the original REC Assurance Reporting requirements
No
No details provided
Priority & timing
No
-
Development: No later than the development of I0237 Solution
Implementation: As soon as possible due to the impact on Consumer detriment, but no later than any implementation of any potential solutions proposed under I0237.
Implementation: As soon as possible due to the impact on Consumer detriment, but no later than any implementation of any potential solutions proposed under I0237.
No
No details provided
Ability to pay, Billing accuracy, Switching experience, Trust and confidence