Amendments to the PARC relating to Address Management
Date of latest update
Type
Change
ID
R0340
Change Category
Change Path
Priority
Urgent
No
Latest Update
The Final Recommendation has been published for determination by the REC Performance Assurance Board on 24 November 2026.
Summary
While undertaking the CRS Improvements Project, RECCo, the Code Manager and DCC completed a review of current reporting that is generated as part of REC Obligations. As part of this review, Address Management-related reports were identified that are not fit for purpose. These reports are produced only for DCC internal consumption. The identified reports are captured in the Performance Assurance Report Catalogue (PARC). As such, DCC proposed raising a REC change to have these removed from the PARC (they will still be available on an ad-hoc on request basis).
Impacted REC Services
Status
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0340 - Legal Drafting
Upload document
I0340 draft legal text v0.3.xlsx
Archive
Off
Document title
I0340 Legal Text Changes
Upload document
R0340 draft legal text v0.4.xlsx
Archive
Off
Problem Statement
As part of the Centralised Registration Service (CRS) Improvements Plan some Address Management-related reports included in the Performance Assurance Reporting Catalogue (PARC) were identified as not fit for purpose. These reports are produced only for DCC's internal consumption and are operationally burdensome to produce and store, but the PARC obligates their generation even where the data included in reports is available elsewhere.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Workgroup
Workgroup(s)
I0340 submission form
Company Name
-
Review status
Review required
Erroneous Switch Review: Assurance Reporting Update
Date of latest update
Type
Issue
ID
I0326
Change Path
Priority
Urgent
No
Latest Update
On 30 October 2026, the REC Change Panel voted to approve this Extension to Plan for I0326 via ex-committee decision.
Summary
There is gap in the Erroneous Switch (ES) Performance Assurance reporting as the DTN does not provide MPXN level data up front. It requires individual ES permission before MPXNs are provided. However, CSS reporting does provide monthly MPXN level report. As such end-to-end monitoring of the ES process cannot be carried out at a MPXN level.
Status
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Problem Statement
There is a lack of consistency in the level of data granularity provided for ES Performance Assurance reporting across industry systems. Specifically, the DTN provides only aggregated data unless explicit permission is obtained from individual Energy Suppliers for each MPxN, whereas the CSS routinely produces monthly reports at MPxN level. This misalignment restricts the ability to access comparable, detailed datasets across platforms and prevents effective end-to-end monitoring and assurance of the ES process at MPxN level.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0326 submission form
I0326 Change Report (Proposal Plan) (Approved) v1.1 07.07.26
I0326 Change Report (Update to Plan) Pre-Approval
I0326 Change Report (Update to Plan) v1.0 Approved 30.10.26
Company Name
RECCo
Review status
Review required
Tariff Interoperability Phase 1a – Supplier Performance Assurance Requirements
Date of latest update
Type
Change
ID
R0323
Change Category
Change Path
Priority
Urgent
No
Latest Update
On 27 October 2026, the REC Performance Assurance Board, in line with the Code Manager recommendation Approved R0323
Summary
Obligations are being introduced into the REC to require Suppliers to make Tariff Pricing Data available to Tariff Interoperability Users (TI Users) using a new Tariff Interoperability Application Programming Interface (TI API). This proposal will provide Code Manager with data to assure supplier performance against obligations in a new REC Schedule: Tariff Interoperability Arrangements.
Impacted REC Parties and Market Participants
Status
Implementation Date
18 February 2027
| Included changes | Affected REC Items | |
|---|---|---|
| R0323 | Tariff Interoperability Phase 1a – Supplier Performance Assurance Requirements |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
This proposal will provide the Code Manager with data to assure Supplier performance against obligations in a new REC Schedule: Tariff Interoperability Arrangements. If Suppliers do not meet their Tariff Interoperability obligations, this could lead to Consumers’ Energy supply not being optimised, meaning that Consumers may incur higher charges. If price signals are not responded to through optimisation, this may also have other impacts such as reduced Net Zero benefits and reduced response to capacity constraints.
Stages Selection
Workgroup
Workgroup(s)
I0323 submission form
I0323 - REC Prioritisation Matrix
I0323 Change Report (Proposal Plan) Approved
R0323 Legal Drafting
I0323 Party IA Request
I0323 Consolidated Party IA Responses NON-CONFIDENTIAL
R0323 Change Report (For Consultation)
R0323 Consolidated Non-Confidential Consultation Responses
R0323 Change Proposal Re-Plan v1.0 Approved 29.09.26
R0323 Legal drafting - Final
R0323 Change Report (Final Recommendation) V1.1 Approved
Company Name
RECCo
Review status
Review required
Annual Review of the Performance Assurance Report Catalogue (2025-26)
Date of latest update
Type
Change
ID
R0298
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented on 27 March 2026.
Summary
The Code Manager is required to perform an annual review of a number of PAF items, including the PARC. The PARC has already been updated several times over the course of 2025 through a series of REC Changes (including R0173, R0202, R0254, R0259). We have conducted an end-to-end review and have identified the other changes are required.
Status
Implementation Date
27 March 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0201 | Creation of a Tool to Manually Correct ERDS / CSS Discrepancies |
|
| R0298 | Annual Review of the Performance Assurance Report Catalogue (2025-26) |
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Performance Assurance Report Catalogue 5.16 - Redlined
Upload document
Performance Assurance Report Catalogue 5.16 - Redlined.xlsx
Archive
Off
Problem Statement
To ensure REC Parties and Service Providers are aware of reports they must provide for Performance Assurance as well as reports obtained from central data sources (such as, but not limited to, the DIP Manager) used in assuring their performance within the market. It is essential these reports are maintained in line with changes to Code processes as well as changing risk landscape.
Stages Selection
SME
SME Role
Lead Assurance Analyst
R0298 Issue Form
R0298 - Change Report (For Consultation) V1.1 (20.01.2026)
R0298 - Consolidated Consultation Responses (Non-Confidential) 12.02.2026.
R0298 - Change Report (Final Recommendation) V1.0 (Approved) 24.02.2026
Company Name
REC Code Manager - Performance Assurance
Review status
Review required
CSS Certificate Authority audit clarification
Date of latest update
Type
Change
ID
R0280
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
CSS Certificate Authority Service Definition clause 9.1 states that the CSS CA Service will be audited each year by a third party against an approved compliance standard and or methodology. The clause however does not state who initiates the audit (i.e. RECCo, the Code Manager, Switching Operator etc.) and engages with the third party.
Change Plan
Proposal Plan approved at Change Panel
Completed
Start:
Due:
Completion:
21 Oct 2025Final Recommendation vote at PAB
Completed
Start:
Due:
Completion:
16 Dec 2025Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
27 February 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0179 | Proposal for Limiting Queries in EES API Calls (Single Query per API Call) | |
| R0190 | Related Meter Point RMP status rules |
|
| R0198 | Metering Asset Manager (MAM) Communication Method Register | |
| R0242 | Missing Scenario Variant from R0043 |
|
| R0244 | C21 to be introduced into STIRG Document |
|
| R0235A | Missing Scenario Variants in D0179 Alternate Solution | |
| R0256 | MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101 |
|
| R0270 | Clarification of SIP Qualification Requirements |
|
| R0271 | Clarification of ASP, AMI, and EMO Accession Requirements |
|
| R0272 | Enabling transparency of the CRS Provider’s REC service level performance |
|
| R0277 | Data Latency SLA Alignment for Gas Enquiry Service |
|
| R0280 | CSS Certificate Authority audit clarification |
|
| R0283 | Annual Address Management Plan Updates |
|
| R0287 | Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations |
|
| R0293 | Housekeeping February 2026 |
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0280 Legal Text approved 16.12.2025 v1.0
Upload document
R0280 - CSS Certificate Authority Service Definition approved 16.12.2025.docx
Archive
Off
Problem Statement
Section 9 of the CSS Certificate Authority Service Definition document mandates an annual third-party audit of the CSS Certificate Authority Service against an approved compliance standard or methodology. However, it does not specify the audit technique or methodology to be used, nor does it specify who is responsible for initiating the audit and engaging with the third-party.
Stages Selection
SME
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
R0280 submission form
R0280 Change Report (Proposal Plan) v1.0 approved 21/10/2025
R0280 Change Report (For Consultation) v1.0
R0280 Consolidated Consultation Responses v1.0
R0280 Change Report (Final Recommendation) Approved 16.12.25 v1.0
Company Name
Smart DCC
Review status
Review required
Enabling transparency of the CRS Provider’s REC service level performance
Date of latest update
Type
Change
ID
R0272
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
RECCo regularly reports on the performance of REC Service Providers in relation to their activities under the REC. However, there is currently no formal agreement to permit the publication of CRS performance measures between the CRS Provider and RECCo. Due to the multi-Party agreement, the REC does not specifically address the publication of this performance data. Instead, RECCo are operating under an informal understanding with the CRS Provider, which means there is a possibility that publication may be delayed or not agreed to in a given month. RECCo is dependent on the CRS Provider’s approval for each publication, which can cause delays. This approval could also be withheld at any point.
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Date
27 February 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0179 | Proposal for Limiting Queries in EES API Calls (Single Query per API Call) | |
| R0190 | Related Meter Point RMP status rules |
|
| R0198 | Metering Asset Manager (MAM) Communication Method Register | |
| R0242 | Missing Scenario Variant from R0043 |
|
| R0244 | C21 to be introduced into STIRG Document |
|
| R0235A | Missing Scenario Variants in D0179 Alternate Solution | |
| R0256 | MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101 |
|
| R0270 | Clarification of SIP Qualification Requirements |
|
| R0271 | Clarification of ASP, AMI, and EMO Accession Requirements |
|
| R0272 | Enabling transparency of the CRS Provider’s REC service level performance |
|
| R0277 | Data Latency SLA Alignment for Gas Enquiry Service |
|
| R0280 | CSS Certificate Authority audit clarification |
|
| R0283 | Annual Address Management Plan Updates |
|
| R0287 | Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations |
|
| R0293 | Housekeeping February 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- An update to the REC Schedule 6 – Performance Assurance.
Proposed Solution Document
Document title
R0272 Approved legal text (26.01.2026)
Upload document
I0272 draft legal text_v1.1.docx
Archive
Off
Problem Statement
Unlike REC Service Providers, there is currently no formal agreement in place between the CRS Provider and RECCo to publish details about the CRS Provider’s performance. RECCo is therefore dependent on the CRS Provider’s approval for each publication. Not only could there be delays in RECCo’s reporting, but the approval could also be withheld at any point, preventing RECCo’s reporting.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0272 Change Proposal Form
R0272 Consolidated Consultation responses V1.0
Company Name
Code Manager / RECCo
Review status
Review required
Non-Domestic Change of Occupier Reporting (R0155 Solution)
Date of latest update
Type
Change
ID
R0254
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
As part of the R0155 change process, the REC Performance Assurance Board requested ongoing monitoring reporting to identify outliers or anomalous behaviour which the Code Manager would then follow up in detail. However, this planned reporting by Energy Suppliers was descoped from R0155 due to the ongoing development of an Ofgem Reporting Request for Information (titled Non-Domestic Market Monitoring Request for Information). The Ofgem RFI includes data received from Energy Suppliers on the time taken for a Non-Domestic Consumer’s request, and to simplify the process for Energy Suppliers, REC Performance Assurance intend on using the same data. This reduces the need to make two related, but different reports in the same topic areas. The Code Manager intended to use the reporting from the Ofgem RFI for ongoing Performance Assurance monitoring of the Non-Domestic Change of Occupier process. However, this was not confirmed by Ofgem in time for the R0155 implementation, as such a separate REC Change Proposal is required to include this data as part of the ongoing Performance Assurance monitoring.
Status
Implementation Date
07 November 2025
| Included changes | Affected REC Items | |
|---|---|---|
| R0152 | Revision to the Consolidated Metering Code of Practice (CoMCoP) |
|
| R0157 | Removal of Facsimile as a Method of Code Communication |
|
| R0191 | Introduction of SLA for Supplier De-Registration on Disconnected Meters |
|
| R0205 | Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches | |
| R0212 | Protecting Crimestoppers and their Contacts | |
| R0215 | Schedule 30 Switch Meter Reading Problems - Rejections and Timings |
|
| R0060 | ERDS Service Definition timezone correction |
|
| R0232 | Non-Domestic Change of Occupier SDEP Screens (R0155 Solution) | |
| R0243 | Transfer of Standard Settlement Configuration and Time Pattern Regime Data Item Ownership |
|
| R0248 | REC Changes to tie in with DCP451 - Suspending Registrations |
|
| R0254 | Non-Domestic Change of Occupier Reporting (R0155 Solution) | |
| R0255 | Terms of Reference Updates | |
| R0257 | Change to REC for Data processing outside of EEA | |
| R0263 | Sharing Confirmed Energy Theft Data with the BSCCo |
|
| R0269 | Schedule 5 – Change Management: Clarity and Typographical Review |
|
| R0279 | Housekeeping November 2025 |
|
| R0227 | Domestic Elective HH Switching |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- Incorporating the Ofgem Reporting RFI Non-Domestic Change of Occupier data into the Performance Assurance Reporting Catalogue
- Development of a process to agree data sharing between Ofgem and the REC Code Manager to share allow Ofgem to share the Non-Domestic Change of Occupier data directly with the Code Manager to reduce the burden on Energy Suppliers and save them from having to duplicate submissions
Proposed Solution Document
Document title
Ofgem Non Domestic Market Monitoring RFI template (CoO/CoT Extract) 03.06.2025
Upload document
Ofgem Non Domestic Market Monitoring RFI template.xlsx
Archive
Off
Document title
Copy of PARC V5.15 (23.09.2025)
Upload document
Copy of PARC V5.15.xlsx
Archive
Off
Problem Statement
The planned reporting by Energy Suppliers was descoped from R0155 due to the ongoing development of an Ofgem Reporting Request for Information (titled Non-Domestic Market Monitoring Request for Information). Without the Ofgem RFI data being submitted, or an alternative means of receiving or reporting Non-Domestic Change of Occupier data, REC Performance Assurance are unable to complete the ongoing monitoring activity originally requested by the Performance Assurance Board during the R0155 change process.
Stages Selection
Issue Form (Non-Domestic Change of Occupier Reporting).docx
Extract from Ofgem RFI Guidance_March_2025.docx
2025.08 Non Domestic Market Monitoring RFI template 2025 for suppliers
I0254 - Change Report (Proposal Plan) V1.1 (Approved) 03.06.2025
I0254 - Change Report (Impact Assessment) V1.0 03.06.2025
I0254 - Consolidated Party Impact Assessment Responses V1.0 (01.07.2025)
R0254 - Consolidated Consultation Responses (Non-Confidential) V1.0 (18.09.2025)
Company Name
REC Code Manager
Review status
Review required
Performance Assurance Reporting Catalogue - Annual Review
Date of latest update
Type
Change
ID
R0238
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the REC Release on 27 June 2025.
Summary
As part of the Performance Assurance operating plan we are required to review the PARC on an annual basis to identify any changed required. This exercise has been completed and a small number of minor changes identified including updating reference material to reflect other changes to Performance Assurance artifacts (e.g. updates to the Retail Risk Register)
Change Plan
Proposal Plan Approved
Completed
Start:
Due:
Completion:
18 Feb 2025Status
Implementation Date
28 June 2025
| Included changes | Affected REC Items | |
|---|---|---|
| R0155 | Change of Occupier: Evidentiary Standards and Timescales |
|
| R0193 | Add Enumeration Values to the DI51035 - Communications Provider Data Item |
|
| R0202 | Performance Assurance Report Catalogue Updates (MHHS) | |
| R0225 | Clarification on TDIS portfolio transfers on sale |
|
| R0233 | Introduction of an Energy Theft Unit (ETU) under the REC | |
| R0234 | Introduction of an energy theft Referral Assessment Service under the REC | |
| R0236 | REC Party Auto de-accession proposal |
|
| R0238 | Performance Assurance Reporting Catalogue - Annual Review | |
| R0249 | Correction to Change Management Schedule regarding sub-committee voting |
|
| R0258 | Housekeeping June 2025 | |
| R0080 | Improvements to ‘Failed to Deliver’ CSS Messages |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Performance Assurance Review Catalogue R0238 - v0.1
Upload document
R0238 - Proposed Legal Text.xlsx
Archive
Off
Problem Statement
As part of the Performance Assurance Operating Plan, REC Performance Assurance are required to review the PARC on an annual basis to identify any changed required. The REC PAB has conducted their 2024 review of the PARC and proposed changes to update to Version 5.1. If the PARC is not kept up to date, this can lead to confusion for Parties. With some of the changes identified correcting typographic errors that can cause errors by Parties when they are uploading data.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
awaghorn@deloitte.co.uk
R0238 - Change Report (Impact Assessment) v1.0
R0238 - Change Report (Proposal Plan - Approved) v1.0 18.02.2025
Change Proposal form
R0238 - Consolidated Impact Assessment Responses V1.0
R0238 - Change Report (Consultation) V1.0
R0238 - Consolidated Consultation Responses (23.04.2025)
R0238 - Change Report (Final Recommendation) V2.0 (Post-Vote) 27.05.2025
Company Name
REC Code Manager
Review status
Review required
Evolution of the CRS Performance Charge
Date of latest update
Type
Change
ID
R0210
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented on 28 February 2025.
Summary
R0025 established a new performance charge for DCC, which linked its performance against its Service Definition with financial incentives. During the R0025 PAB members noted the need to further develop the methodology, including reviewing it periodically. The RPA has worked with the PAB to develop proposals to enhance the performance charge.
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
28 February 2025
| Included changes | Affected REC Items | |
|---|---|---|
| R0168 | Clarify & Strengthen CRS Providers Requirements |
|
| R0208 | Adding the DIP Rules to the Cross Code Steering Group Terms of Reference | |
| R0210 | Evolution of the CRS Performance Charge | |
| R0239 | Housekeeping February 2025 |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Proposed Solution - Draft Schedule 6 - Performance Assurance
Upload document
R0210 Solution - Draft Schedule 6 V2.4 - 24.09.24.docx
Archive
Off
Document title
R0210 - Legal text for consultation 17.10.24
Upload document
R0210 - Legal text for consultation (1).pdf
Archive
Off
Document title
R0210 - Legal Text - Post-Consultation 18.11.24
Upload document
R0210 Legal Text - 07.11 Amendments Post DCC.pdf
Archive
Off
Stages Selection
SME
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
RECPAB_24_0625_05 - Evolution of CRS Performance Charge.docx
CP form
R0210 Change Report V1.0 01.10.24
R0210 Consolidated Consultation Responses
R0210 Change Report (for Consultation)
R0210 Change Report (Pre-Vote) V1.0 18.11.24
R0210 Change Report (Post-Vote) V1.0 26.11.24
Company Name
REC Code Manager
Review status
Review required
Performance Assurance Report Catalogue Updates (MHHS)
Date of latest update
Type
Change
ID
R0202
Change Category
Change Path
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the REC Release on 27 June 2025.
Summary
This change seeks to update the Performance Assurance Reporting Catalogue (PARC) to capture data items required to continue to appropriately monitor Retail Risks under Market-wide Half Hourly Settlement (MHHS) industry arrangements. Some housekeeping changes, for the PARC, have also been included in this change.
Change Plan
Proposal Plan approved
Completed
Start:
08 Aug 2024Due:
03 Sep 2024Completion:
03 Sep 2024Party impact assessment completed
Completed
Start:
03 Sep 2024Due:
04 Oct 2024Completion:
04 Oct 2024Change Report approved for Consultation
Completed
Start:
04 Oct 2024Due:
25 Mar 2025Completion:
25 Mar 2025Consultation completed
Completed
Start:
25 Mar 2025Due:
15 Apr 2025Completion:
15 Apr 2025RECPAB Voting
In Progress
Start:
15 Apr 2025Due:
29 Apr 2025Completion:
Impacted REC Parties and Market Participants
Status
Implementation Date
28 June 2025
| Included changes | Affected REC Items | |
|---|---|---|
| R0155 | Change of Occupier: Evidentiary Standards and Timescales |
|
| R0193 | Add Enumeration Values to the DI51035 - Communications Provider Data Item |
|
| R0202 | Performance Assurance Report Catalogue Updates (MHHS) | |
| R0225 | Clarification on TDIS portfolio transfers on sale |
|
| R0233 | Introduction of an Energy Theft Unit (ETU) under the REC | |
| R0234 | Introduction of an energy theft Referral Assessment Service under the REC | |
| R0236 | REC Party Auto de-accession proposal |
|
| R0238 | Performance Assurance Reporting Catalogue - Annual Review | |
| R0249 | Correction to Change Management Schedule regarding sub-committee voting |
|
| R0258 | Housekeeping June 2025 | |
| R0080 | Improvements to ‘Failed to Deliver’ CSS Messages |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
03 RECPAB_24_0827_04E Draft changes to the PARC for MHHS (27.08.2024)
Upload document
03 RECPAB_24_0827_04E Draft changes to the PARC for MHHS.xlsx
Archive
Off
Document title
R0202 RECPAB_23_PARC V5.2 - REDLINE MHHS - MEM only (18.03.2025)
Upload document
R0202 RECPAB_23_PARC V5.2 - REDLINE MHHS - MEM only 18.03.2025.xlsx
Archive
Off
Document title
R0202 RECPAB_23_PARC V5.2 - REDLINE MHHS - MEM only APPROVED 29.04.2025
Upload document
R0202 RECPAB_23_PARC V5.2 - REDLINE MHHS - MEM only APPROVED 29.04.2025.xlsx
Archive
Off
Problem Statement
The PARC currently does not capture all the data items required to support the monitoring of Retail Risks following Market-wide Half Hourly Settlement go-live. An update to the PARC is required to include the data items that will ensure the Code Manager can provide the assurance the industry requires during transition and under the new MHHS arrangements.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
SME Role
Lead Assurance Analyst
SME User
awaghorn@deloitte.co.uk
RECPAB_23_Performance Assurance Report Catalogue V5.2 - REDLINE.xlsx
R0202 - PARC Updates (MHHS) (CP Form)
R0202 Change Proposal Re-Plan v1.0 31.10.24
R0202 Change Report (Proposal Plan) v2.0 (Approved) 03.09.2024
R0202 Change Proposal Re-Plan V2.0 (Approved) 20.03.2025
R0202 Change Report (Consultation) v1.0 (Approved) 25.03.2025
R0202 Consolidated Consultation Responses V1.1 (22.04.2025)
R0202 Change Report (Final Recommendation) (Post-Vote) v2.0
Company Name
Code Manager
Review status
Review required