Review of Metering Accreditation

Date of latest update
Type
Issue
ID
I0334
Priority
Urgent
No
Latest Update
04/09/2026 - This Issue has now been withdrawn given an anticipated wider review of Schedule 15 which will identify and implement clarifications throughout this Schedule, including clarification that were proposed under this Issue. If you wish to adopt this Issue, please contact the Code Manager by COB 18 September 2026.
Summary
This Change Proposal seeks to ensure that the REC is reflective of current practice regarding initial approval of Metering Equipment Manager, Electricity Metering Operative, Approved Meter Installer, and approved AMR Service Provider, that have been determined by the Metering Scheme Auditor, Wilcock Consultants Ltd, in April 2023.
Proposer
francine.peyroux-sissoko
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
Stages Selection
I0334 submission form
Company Name
Retail Energy Code
Review status
Review required

MHHS D0300 Issue

Date of latest update
Type
Issue
ID
I0295
Urgent
No
Latest Update
09/04/2026 - The Proposer has withdrawn the Issue following conversations with the Code Manager. The Proposer concluded that it would be more appropriate for MHHS migration to complete before undertaking a comprehensive review of the overall process.
Summary
D0300s for MHHS do not include register reads. Block 60C says: “For MHHS Metering Points, this Data Item should be populated with details of the cumulative register for Smart Metering Assets”. If a smart meter is non-comms, and we receive a cumulative only in the D0300, but are billing to register reads, we don't know whether the disputed read is valid based on our read history. Furthermore, a cumulative will not always equal the sum of the register reads for smart meters.
Proposer
David Morley
Status
Implementation Status
Date Raised
Lead Analyst
florentina.monea
Solution Development
Stages Selection
Stages Selection
I0295 Submission Form
Company Name
OVO
Review status
Review required

Schedule 14 review – DNOs do not remove Metering Assets

Date of latest update
Type
Issue
ID
I0288
Urgent
No
Latest Update
18/12/2025 - the Code Manager has withdrawn this Issue following discussions at the Metering Expert Panel on 10 December 2025, where Panel members advised there were a small number of niche scenarios where a DNO may remove a Metering Asset (e.g. emergencies). On this basis, the Code Manager believes it appropriate this remains within Schedule 14. If you wish to adopt this REC Issue, please contact the Code Manager by COB 07 January 2026.
Summary
As part of the REC Code drafting for MHHS, an issue has been identified with the current drafting of Metering Operations Schedule. This sets out the processes for the removal of a meter (and metering assets) by the DNOs. DNOs would only remove CTs and VTs and not the actual meters. The text should be reviewed and revised to reflect what happens and what activity DNOs complete.
Proposer
Caroline Freimuller
Change Plan

Change Proposal approved

Completed

Start:

28 Oct 2025

Due:

24 Jan 2026

Completion:

24 Jan 2026

Test

In Progress

Start:

24 Jan 2026

Due:

24 Mar 2026

Completion:

Status
Implementation Status
Date Raised
Solution Development
Stages Selection
Stages Selection
I0288 submission form
Company Name
REC Code Manager
Review status
Review required

Effective Dates in EES

Date of latest update
Type
Issue
ID
I0247
Urgent
No
Latest Update
12/08/2026 - the Proposer has chosen to withdraw this Issue as MHHS means many of the effective dates are being updated as per the original business case so the change is no longer required.
Summary
On a switch many of the effective dates within EES default to the switch date. This includes energisation status. It means EES users that don't have access to the meter technical details do not know the actual date the status changed.
Proposer
Lorna Mallon
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
Stages Selection
Proposal Form
Company Name
Gemserv
Review status
Review required

Shared Sites in Electricity Enquiry Service (EES)

Date of latest update
Type
Issue
ID
I0231
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/03/2026 The Proposer has withdrawn this Issue following discussions with industry, where impacted Parties advised waiting for the completion of MHHS migration before progressing this Issue and solution development. The window to adopt this Issue has now closed.
Summary
There is a concern regarding shared sites (as defined by BSCP550) that have multiple suppliers linked to them. The investigation revealed a lack of visibility of these sites, and it appears that the industry is similarly uninformed. Elexon, the REC, and the wider industry do not have a consistent way of identifying these shared sites. Therefore, there is a good chance that agents are holding shared sites within their portfolio without knowing it. We would like to explore whether the EES Online Portal has any flags or mechanisms that could help identify these shared sites.
Proposer
Ardin Klimenti
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. A flag on EES that can help everyone clearly identify the shared site, the primary MPAN and all of the pseudo MPANs attached to it.
Problem Statement
There is a concern regarding shared sites (as defined by BSCP550) that have multiple suppliers linked to them. The investigation revealed a lack of visibility of these sites, and it appears that the industry is similarly uninformed. Elexon, the REC, and the wider industry do not have a consistent way of identifying these shared sites. Therefore, there is a good chance that agents are holding shared sites within their portfolio without knowing it. We would like to explore whether the EES Online Portal has any flags or mechanisms that could help identify these shared sites. If not, could these be added?
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Issue Proposal Form
Company Name
Elexon
Review status
Review required

D0303 flow following MHHS design changes

Date of latest update
Type
Issue
ID
I0230
Change Path
Priority
Urgent
No
Latest Update
29/04/2026 - This Issue has been withdrawn by the Proposer, as there was not a strong preference amongst MAPs of which temporary solution option (if any) should be progressed. Many MAPs already have workarounds in place, and a permanent solution is expected to be progressed in the future through a joint REC / BSC change. The adoption window has closed.
Summary
As part of Market Wide Half Hourly Settlement (MHHS) design, the requirement to provide Data Item Effective from Settlement Date {REGI} (J0049 / DI50025) in the Notification of Meter Operator, Supplier and Metering Assets installed / removed by the MOP to the MAP Market Message (D0303 / MM00240) has been changed from mandatory to optional. This means Meter Asset Providers (MAP) may not receive it.
Proposer
Beth Tatton
Change Plan

Change Report (Proposal Plan) approved at Change Panel

Completed

Start:

Due:

Completion:

04 Nov 2025
Impacted REC Services
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Problem Statement
The Effective from Settlement Date {REGI} Data Item being optional rather than mandatory inside the Notification of Meter Operator, Supplier and Metering Assets installed / removed by the MOP to the MAP Market Message means that MAPs may not receive this information required for billing purposes.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
Issue Proposal Form
I0230 Change Report (Proposal Plan) V1.0 approved 04.11.25
I0230 and I0261 Solution Development Report V1.0
I0230 I0261 Q&A session V1.0
I0230 and I0261 Consolidated IR Responses PUBLIC V1.0
Company Name
Calisen Asset Management Limited
Review status
Review required

ECOES API for Export MPAN Creation at Scale

Date of latest update
Type
Issue
ID
I0228
Change Category
Change Path
Priority
Urgent
No
Latest Update
05/11/2026 - the Proposer has elected to withdraw this Issue as the business case has been covered by R0321, which has been approved by Change Panel for implementation. If you wish to adopt this Issue, please contact the Code Manager by COB 20 November 2026.
Summary
Electricity Suppliers believe there is a significant bottleneck to Export Metering Point creation, which is resulting in them feeling unable to offer Export smart products to a wider audience of Consumer and scale low-carbon technology. The most effective solution is an API within the Electricity Enquiry Service (EES) that allows the Electricity Supplier to request the creation of an Export Metering Point. This could work for both Electricity Suppliers and Distribution Network Operators (DNOs) ensuring that scalable solutions are applied at both sides of the process.
Proposer
Ben Atkinson
Change Plan

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

06 Mar 2025

Presented at REC Change Panel

Completed

Start:

Due:

Completion:

21 Apr 2026
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Problem Statement
A restriction of 50 Export Metering Points per DNO per day, with no two DNOs operating the bulk request process in the same way, is overly burdensome to Electricity Suppliers and creating a barrier for Consumers getting an Export Metering Point assigned to their Premise. This is ultimately harming the effort the reach Net Zero.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Issue Proposal Form
Change Issues Group paper - presented March 2025
I0228 Change Report (Proposal Plan) V1.0 approved 21.04.26
I0228 Consolidated Information Request Responses V1.0 PUBLIC
I0228 Update to Plan V1.0 on hold, approved 04.06.26
Company Name
Octopus Energy
Review status
Review required

Increase Smart capability of SMETS2 Twin Element ESME to support solar and storage use cases

Date of latest update
Type
Issue
ID
I0221
Urgent
No
Latest Update
On 05 June 2026, the Proposer of SEC Modification MP184 wrote to SEC Change to advise they would like to withdraw MP184. MP184 has now been withdrawn and it's adoption window has closed, so I0221 (as linked to this Modification) is also being withdrawn.
Summary
SEC schedule 9 Smart Metering Equipment Technical Specifications (SMETS) defines how a Twin Element Electricity Smart Metering Equipment (ESME) captures and records electricity consumption on a per element basis. The Proposer would like to enable Twin Element meters to record exported energy on the secondary element to allow innovative use cases.
Proposer
Marc Rhodes
Status
Implementation Status
Date Raised
Lead Analyst
florentina.monea
Solution Development
Stages Selection
Stages Selection
MP184 Modification Report v0.4.pdf
Change Proposal Form
Annex B - MP184 DCC Preliminary Assessment.pdf
Annex A - MP184 Business Requirements v0.6.pdf
Company Name
Gemserv
Review status
Review required

Multiple Switch Requests Increasing Objection Rate

Date of latest update
Type
Issue
ID
I0214
Change Category
Change Path
Priority
Urgent
No
Latest Update
20/05/2025 - the Code Manager has withdrawn this Issue, as there are no adequate solution options and minimal Consumer detriment. The adoption window has closed.
Summary
REC Parties have told the Code Manager that they are seeing multiple registrations attempts (10 plus attempts on consecutive days in some instances) on individual MPxNs. They are concerned about Consumer detriment as those trying to switch are not getting time to review objection related communications from their current Supplier to allow them to act and resolve the issue. This was initially presented as a non-domestic issue, but initial Code Manager investigations have also highlighted potential concern around proposed domestic transfers as well. There is also a risk of Party Performance impacts with initial analysis flagging potential impacts on Performance Assurance Risk Drivers, 8.9, 8.10 & 8.11.
Proposer
carl.dennis
Change Plan

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

06 Mar 2025
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
Non-Domestic Consumers are having their Switch experience affected by multiple Objection attempts following a single initial attempt to register for their supply by a prospective gaining Supplier. This results in Consumer detriment, as multiple Objections result in repeated rounds of communications to the Supplier. This results from automated Registration systems employed by Non-Domestic Suppliers.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Change Issue Proposal Form
I0214 Change Report (Plan) (Approved) V1.0 17.12.24
I0214 Rebaselined Plan v1.0 Approved 28.03.25
Company Name
Code Manager
Review status
Review required

Sequence order of CSS00200 message

Date of latest update
Type
Issue
ID
I0204
Urgent
No
Latest Update
08/11/2024 - The Proposer has withdrawn this issue as it is being progressed under MHHS CR056. The adoption window has now closed. * This is Issue relates to the Market-wide Half Hourly Settlement design.
Summary
Empty
Proposer
Madison Layton
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
Stages Selection
Company Name
St.Clements
Review status
Review required