MSC Scheme Non-Domestic Exclusions – Process Clarification
Date of latest update
Type
Issue
ID
I0349
Urgent
No
Latest Update
15/10/2026 REC Issue accepted in by the Code Manager.
Summary
The MSC Scheme applies only to domestic Switches; however, identifying eligible Switches currently relies on the Domestic Premises Indicator (DPI), which may not be applied consistently or reliably. This can result in unnecessary processing where an Energy Supplier, or an entire MPID/SSC within its portfolio, supplies only non-domestic Consumers.
Status
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
Stages Selection
I0349 Submission Form
Company Name
RECCo
Review status
Review required
REC change to align with BSC IF-045 notification for Import/Export MPAN meter type misalignment
Date of latest update
Type
Change
ID
R0347
Change Category
Other Industry Codes impacted
Change Path
Impact Assessment
Urgent
No
Latest Update
05/11/2026 The Party impact assessment was published on 05 November 2026 and will remain open to responses until 27 November 2026. The Issue progressed to a Change Proposal on 05 November 2026.
Summary
Elexon are raising a CP that would introduce additional SMRS validation controls and a new IF-045 notification scenario to identify and manage metering misalignment across associated Import and Export MPANs. As this places obligations on MOAs, an impact to REC Schedule 14 has been identified.
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0347 Legal Text Draft for Party impact assessment
Upload document
R0347 - Legal Text for Party IA.zip
Archive
Off
Problem Statement
The BSC CP CP1652 – Introduction of IF-045 notification from Registration Service for meter type misalignment was raised at the Supplier Volume Allocation Group on 06 October 2026. Following MHHS migration activity, Distribution Network Operators (DNOs) have identified and removed a population of Import and Export MPAN associations that contained inconsistent metering characteristics, including instances where one MPAN was configured with Smart Metering and the other with Advanced Metering. BSC CP1652 is seeking to create a new IF-045 notification scenario for the Supplier and the MOA to identify and manage misalignment issues. As BSC CP1652 relies on a new obligation on MOAs to agree on an approach to resolve the issue with the Electricity Supplier, a REC Issue is required to update Schedule 14 – Metering Operations.
Stages Selection
I0347 Change Report (Proposal Plan) Approved
Company Name
Code Manager
Review status
Review required
REC Changes for the Gas Enquiry Service Evolution
Date of latest update
Type
Issue
ID
I0346
Priority
Urgent
No
Latest Update
03/09/2026 - Issue accepted in by Code Manager
Summary
"As part of the evolution of the Gas Enquiry Service (GES), the service is intended to transition to a new Service Provider with an updated service provided for both the API and Portal. To recognise the new service, a number of changes may be required to REC documentation. These changes will need to be discussed with industry and approved via the REC change process prior to implementation of the new service."
Status
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
Stages Selection
I0346 submission form
Company Name
RECCo
Review status
Review required
Explore use of CHECK as a Meter Type option on J0483 DI-059
Date of latest update
Type
Issue
ID
I0344
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
Change Report (Proposal Plan) has been published for REC Change Panel approval on 17 November 2026.
Summary
It has been suggested that CHECK meters should not be sent within industry messages so the presence of this value within the valid set may not be required. This Issue has been raised to explore whether this assumption is correct, look at the existing/historic use cases industry have used the CHECK option for, if they are no longer valid and if so why not.
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
Solution Development
Problem Statement
The DI-059 / J0483 Meter Type Data Item is shared between the Balancing and Settlement Code’s Data Integration Platform (DIP) and the REC’s Data Catalogue. The CHECK Meter Type does not have a valid MHHS Market Segment combination and is not a valid enumeration under the DIP version of DI-059 / J0483. Having an enumeration that is valid in one version of the Data Item and not valid in another causes confusion as to what enumerations are valid for this Data Item. As part of this Issue, we will also explore whether use of the LAG_, LEAD_, and MAIN_ meter types are still necessary to be kept within D-Flows, even though they are valid meter types for MHHS arrangements.
Stages Selection
Stages Selection
Workgroup
Workgroup(s)
I0344 submission form
Change Report - Proposal Plan
Company Name
-
Review status
Review required
Enabling Dual MSA & MSS (SVA MOA) appointments for WC connection types
Date of latest update
Type
Change
ID
R0342
Change Path
Priority
Urgent
No
Latest Update
26/10/2026 - The Consultation has closed. The Code Manager is assessing the responses.
Summary
Under the legacy/pre-MHHS arrangements the market is segmented by Measurement Class (MC) for settlement purposes which is not sensitive to the Meter type that is installed or is to be installed, meaning that the replacement of Traditional meters to either smart or Advanced metering equipment can be arranged without the need for the Change of Measurement Class (CoMC) process to be conducted concurrent with the meter exchange (MEX). Under MHHS, when a WC connection goes through a MEX from Traditional to Advanced, or from Advanced to Smart in the MHHS arrangements a new complexity is placed on suppliers because the CoSeg process must be tightly co-ordinated to a specified planned MEX date and processed through the MPRS within 3 Working Days of that date.
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0342 Legal Drafting
Upload document
R0342 Legal Drafting V1.0 (1).docx
Archive
Off
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0342 submission form
R0342 Change Report (Proposal Plan and Consultation) v1.1 Approved
R0342 Consolidated Non-Confidential Consultation Responses
Company Name
Npower Commercial Gas Limited
Review status
Review required
Improved Validation for DI51599 - Electricity Smart Meter Equipment (ESME ID)
Date of latest update
Type
Issue
ID
I0341
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
18/11/2026 - The Change Report (Proposal Plan) was approved by the REC Change Panel
Summary
A DNO has raised an issue with the ESME ID data stored in MPRS. Some of the ESMEs are passing MPRS basic validation but are being rejected by the proposed Metering Service preventing a change of service.
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
Solution Development
Problem Statement
A DNO has raised an issue with the ESME ID data stored in MPRS. Some of the ESMEs are passing MPRS basic validation but are being rejected by the proposed Metering Service preventing a change of service (Rejection of IF-033 with IF-035 Response R). Basic REC R032 Validation on IF-005/D0312: XX-XX-XX-XX-XX-XX-XX-XX (0-9, A-Z)
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Workgroup
Workgroup(s)
I0341 submission form
Change Report - Proposal Plan
Company Name
-
Review status
Review required
Amendments to the PARC relating to Address Management
Date of latest update
Type
Change
ID
R0340
Change Category
Change Path
Priority
Urgent
No
Latest Update
The Final Recommendation has been published for determination by the REC Performance Assurance Board on 24 November 2026.
Summary
While undertaking the CRS Improvements Project, RECCo, the Code Manager and DCC completed a review of current reporting that is generated as part of REC Obligations. As part of this review, Address Management-related reports were identified that are not fit for purpose. These reports are produced only for DCC internal consumption. The identified reports are captured in the Performance Assurance Report Catalogue (PARC). As such, DCC proposed raising a REC change to have these removed from the PARC (they will still be available on an ad-hoc on request basis).
Impacted REC Services
Status
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0340 - Legal Drafting
Upload document
I0340 draft legal text v0.3.xlsx
Archive
Off
Document title
I0340 Legal Text Changes
Upload document
R0340 draft legal text v0.4.xlsx
Archive
Off
Problem Statement
As part of the Centralised Registration Service (CRS) Improvements Plan some Address Management-related reports included in the Performance Assurance Reporting Catalogue (PARC) were identified as not fit for purpose. These reports are produced only for DCC's internal consumption and are operationally burdensome to produce and store, but the PARC obligates their generation even where the data included in reports is available elsewhere.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Workgroup
Workgroup(s)
I0340 submission form
Company Name
-
Review status
Review required
REC Change to align with CP1633 Capture Modem Module Details Under BSCP601
Date of latest update
Type
Issue
ID
I0338
Change Category
Priority
Urgent
No
Latest Update
06/08/2026 - Issue accepted in by the Code Manager
Summary
BSC CP1633 “Capture Modem Module Details Under BSCP601” makes amendments to BSCP601 Metering Protocol Approval and Compliance Testing. One of the amendments places obligations on MOAs where they are introducing and amending Communications Equipment. Equivalent and potentially expanded obligations need to be placed within REC Schedule 14 Metering Operations to support this.
Status
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
Stages Selection
I0338 submission form
Company Name
REC Code Manager / CCSG representative
Review status
Review required
Change to Location (A0059) data item within the ONAGE APPT file to MAMs, from ‘Optional’ to ‘Mandatory’
Date of latest update
Type
Change
ID
R0337
Priority
Urgent
No
Latest Update
17/11/2026 - Change Report (Proposal Plan) approved by the REC Change Panel.
Summary
Currently, the location (A0059) data item within the ONAGE APPT file from Suppliers to MAMs is Optional, this allows a Supplier to leave this field blank. Currently SGNCS system functionality is designed to reject the file if this field is blank. This is due to SGNCS requiring to hold the location of the meter installation in order to allow us to deliver on our safety obligations as a MAM in maintaining of an asset.
Impacted REC Documents
Status
Status
Implementation Status
Date Raised
Fuel
Solution Development
Proposed Solution Document
Document title
I0337 legal text changes
Upload document
I0337 proposed solution.pdf
Archive
Off
Problem Statement
ONAGE files are Market Messages sent from Gas Suppliers to Gas Metering Asset Managers (MAMs) to appoint or de-appoint the MAM following a change of Energy Supplier or a change of MAM. The 'Location Code' (A0059) Data Item within ONAGE tells MAMs where a meter is located within the property (“01 = cellar”, “02 = under stairs”, etc). A0059 is currently an 'Optional' data item, which means that ONAGE entries are valid even where A0059 is blank. Although most Energy Suppliers send ONAGE files that always have A0059 populated, including when it is "00 = unknown", it is possible for ONAGE files to be sent with a blank ‘Location Code’. This Issue was raised by a MAM who has identified that this leads to rejections of the ONAGE appointment (APPT) files where the A0059 is left blank as this is a mandatory field in their internal systems. The location of the meter installation is also required for MAMs to deliver their safety and asset maintenance obligations.
Stages Selection
Stages Selection
Workgroup
Workgroup(s)
I0337 submission form
Company Name
-
Review status
Review required
Introduction of Defined Electricity Metering Work Categories for Metering Accreditation
Date of latest update
Type
Issue
ID
I0335
Change Category
Change Path
Priority
Urgent
No
Latest Update
03/11/2026 The Information Request has closed and the Consolidated Responses have been published.
Summary
Currently, there are no clearly defined or standardised categories of work for electricity third-party activities within CoMCoP. This lack of categorisation reduces transparency of company capabilities and scope of work, limits the ability to align accreditation with actual operational activity and restricts the ability to apply targeted, risk-based audit assurance.
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Stages Selection
Stages Selection
I0335 submission form.pdf
I0335 - Change Report (Proposal Plan) v1.0
I0335 - Change Report (Proposal Plan) v1.0 Approved 15.09.26
I0335 Consolidated IR Responses NON-CONFIDENTIAL v0.1.pdf
Company Name
Wilcock Consultants Ltd
Review status
Review required