Housekeeping November 2026
Date of latest update
Type
Change
ID
R0345
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/11/26 - This Change Proposal has been implemented as part of the 6 November 2026 REC Release.
Summary
The Code Manager has identified a number of non-material clarifications, typographical errors and changes needed to REC products.
Status
Implementation Date
06 November 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0180 | Clarity on use of on hold for switching issues, including the obligations of CSS Users |
|
| R0207 | Import / Export MOA Charging Clarification |
|
| R0253 | Theft - DNO/Networks not providing photos |
|
| R0261 | Addition of Export flag in D0303 flows | |
| R0266 | REC Data Specification Clarifications |
|
| R0317 | Number of Displayed Register Digits Data Item linkage | |
| R0328 | Removal of D0383 & D0384 requirements from Sharing MTDs process |
|
| R0336 | Legal text to support REC Change R0180 |
|
| R0343 | MSC - Amending Statement Production Timescales | |
| R0345 | Housekeeping November 2026 |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 11 Nov 2026 | ||
| 1.0 | 11 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- This Housekeeping Change Proposal seeks to make typographical and formatting corrections that have been identified and improve consistency across the REC.
Stages Selection
Nov 2026 Housekeeping Summary
November 2026 Housekeeping legal text
Company Name
REC Code Manager
Review status
Review required
Legal text to support REC Change R0180
Date of latest update
Type
Change
ID
R0336
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/11/26 - This Change Proposal has been implemented as part of the 6 November 2026 REC Release.
Summary
REC Change R0180 “Clarity on use of on hold for switching issues, including the obligations of CSS Users” implements a technical solution for the closure of certain ticket raised to the Switching Operator when no response has been received. This Change Proposal contains the legal text to support R0180.
Change Plan
Change Report (Proposal Plan) approved by Change Panel ex-committee
Completed
Start:
Due:
Completion:
19 Aug 2026Solution presented at Technical Expert Panel
Completed
Start:
Due:
Completion:
26 Aug 2026Presented at Change Issues Group
Completed
Start:
Due:
Completion:
03 Sep 2026Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
06 November 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0180 | Clarity on use of on hold for switching issues, including the obligations of CSS Users |
|
| R0207 | Import / Export MOA Charging Clarification |
|
| R0253 | Theft - DNO/Networks not providing photos |
|
| R0261 | Addition of Export flag in D0303 flows | |
| R0266 | REC Data Specification Clarifications |
|
| R0317 | Number of Displayed Register Digits Data Item linkage | |
| R0328 | Removal of D0383 & D0384 requirements from Sharing MTDs process |
|
| R0336 | Legal text to support REC Change R0180 |
|
| R0343 | MSC - Amending Statement Production Timescales | |
| R0345 | Housekeeping November 2026 |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 11 Nov 2026 | ||
| 1.0 | 11 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0336 Schedule 26 Switching Service Management - for consultation
Upload document
R0180 Schedule 26 Switching Service Management - for consultation.docx
Archive
Off
Document title
R0336 Switching Operator (SO) Service Definition - for consultation
Upload document
R0180 Switching Operator (SO) Service Definition - for consultation.docx
Archive
Off
Problem Statement
R0180 Clarity on use of on hold for switching issues, including the obligations of CSS Usersintroduces a technical solution for the closure of certain tickets raised to the Switching Operator when no response has been received. Without supporting legal text, these obligations and expectations are not documented within the REC.
Stages Selection
SME
SME Role
Lead Technical Analyst
R0336 submission form
R0336 Change Report (Proposal Plan and Consultation) V1.0
R0336 Consolidated Consultation Responses v1.0
R0336 Change Report (Final Recommendation) v1.0 Approved 30.09.2026
Company Name
REC Code Manager
Review status
Review required
Regulatory Alliance Creation Rejections
Date of latest update
Type
Change
ID
R0331
Change Category
Change Path
Priority
Urgent
No
Latest Update
20/10/2026 The Change Report (Update to Plan) was approved by the REC Change Panel on 20 October 2026, and the Issue progressed to a Change Proposal on 22 October 2026.
Summary
An incident where Network Parties did not submit Regulatory Alliances on time to the Central Switching Service (CSS) Provider, or did submit the Regulatory Alliances but did not action rejections from the CSS Provider in a timely manner, led to over 200 Consumers being delayed in Switching to their chosen Energy Supplier. This Change Proposal has been raised to review this process.
Change Plan
Change Report (Proposal Plan) approved at Change Panel
Completed
Start:
Due:
Completion:
18 Aug 2026Presented at Change Issues Group
Completed
Start:
Due:
Completion:
03 Sep 2026Update to plan approved by Change Panel
Completed
Start:
Due:
Completion:
20 Oct 2026Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0331 Schedule 24 Switching Data Management
Upload document
I0331 Schedule 24 Switching Data Management v0.6.docx
Archive
Off
Problem Statement
The lack of Service Level Agreements (SLAs) on Network Parties to submit Regulatory Alliances to the CSS Provider or to work any rejections received from the CSS Provider can lead to delays in Consumers being able to Switch to their chosen Energy Supplier.
Stages Selection
SME
SME Role
Lead Assurance Analyst
I0331 submission form
I0331 Change Report (Update to Plan) - Approved 20/10/26
I0331 Change Report (Proposal Plan) V1.0 approved 18.08.26
I0331 Consolidated Impact Assessment Responses v2.0
I0331 Update to Plan Approved 20.10.2026
Company Name
SQE Energy
Review status
Review required
Tariff Interoperability Phase 1a – Supplier Performance Assurance Requirements
Date of latest update
Type
Change
ID
R0323
Change Category
Change Path
Priority
Urgent
No
Latest Update
On 27 October 2026, the REC Performance Assurance Board, in line with the Code Manager recommendation Approved R0323
Summary
Obligations are being introduced into the REC to require Suppliers to make Tariff Pricing Data available to Tariff Interoperability Users (TI Users) using a new Tariff Interoperability Application Programming Interface (TI API). This proposal will provide Code Manager with data to assure supplier performance against obligations in a new REC Schedule: Tariff Interoperability Arrangements.
Impacted REC Parties and Market Participants
Status
Implementation Date
18 February 2027
| Included changes | Affected REC Items | |
|---|---|---|
| R0323 | Tariff Interoperability Phase 1a – Supplier Performance Assurance Requirements |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
This proposal will provide the Code Manager with data to assure Supplier performance against obligations in a new REC Schedule: Tariff Interoperability Arrangements. If Suppliers do not meet their Tariff Interoperability obligations, this could lead to Consumers’ Energy supply not being optimised, meaning that Consumers may incur higher charges. If price signals are not responded to through optimisation, this may also have other impacts such as reduced Net Zero benefits and reduced response to capacity constraints.
Stages Selection
Workgroup
Workgroup(s)
I0323 submission form
I0323 - REC Prioritisation Matrix
I0323 Change Report (Proposal Plan) Approved
R0323 Legal Drafting
I0323 Party IA Request
I0323 Consolidated Party IA Responses NON-CONFIDENTIAL
R0323 Change Report (For Consultation)
R0323 Consolidated Non-Confidential Consultation Responses
R0323 Change Proposal Re-Plan v1.0 Approved 29.09.26
R0323 Legal drafting - Final
R0323 Change Report (Final Recommendation) V1.1 Approved
Company Name
RECCo
Review status
Review required
Erroneous Switch Review: I0237 Clarifications
Date of latest update
Type
Change
ID
R0322
Change Category
Change Path
Priority
Urgent
No
Latest Update
On 03 November 2026, the Change Panel, in line with Code Manager recommendation, voted to approve this Change Proposal. The appeal window is now open until 23:59 on 18 November.
Summary
The I0237 working group has carried out an end-to-end review of the Erroneous Switch process. The working group highlighted housekeeping changes and clarifications within Schedule 30 and the Market Messages.
Status
Implementation Date
26 February 2027
| Included changes | Affected REC Items | |
|---|---|---|
| R0292 | Obligate Energy Suppliers to provide photo evidence of Theft in Conveyance to Network Parties | |
| R0322 | Erroneous Switch Review: I0237 Clarifications | |
| R0324 | Use of REL Data to Support Key Regulations |
|
| R0339 | REC Change to align with BSC CP Clarify Supplier obligations for IF-002 messages where a Switch is cancelled |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Erroneous Switch Review - I0237 Clarifications (12.05.2026) V1.0
Upload document
Erroneous Switch Review - I0237 Clarifications (12.05.2026) V1.0.zip
Archive
Off
Document title
R0322 Legal Drafting V1.2
Upload document
R0322 - Legal Drafting.zip
Archive
Off
Problem Statement
The current Erroneous Switch drafting contains inconsistencies that can cause confusion and misunderstanding between Energy Suppliers regarding the applicable governance and process requirements, creating ambiguity around the correct contractual and operational framework. In addition, the I0237 Working Group has identified further required amendments to Schedule 30, highlighting that the existing drafting does not fully or accurately reflect intended process arrangements or correct terminology.
Stages Selection
SME
SME Role
Lead Technical Analyst
R0322 submission form
R0322 - Change Report (Proposal Plan) V1.0 (Approved) 19.05.2026
R0322 Consolidated IA Responses
R0322 Change Report (For Consultation)
R0322 Consolidated Consultation Responses
R0322 Change Report (Final Recommendation) Approved
Company Name
REC Code Manager
Review status
Review required
Housekeeping June 2026
Date of latest update
Type
Change
ID
R0320
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
The Code Manager has identified a number of non-material clarifications, typographical errors and changes needed to REC products.
Impacted REC Documents
Status
Implementation Date
26 June 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
June 2026 Housekeeping Summary V1.0
Upload document
June 2026 Housekeeping Summary.xlsx
Archive
Off
Document title
June 2026 Housekeeping legal text (zip file)
Upload document
June 2026 Housekeeping legal text v2.0.zip
Archive
Off
Document title
June 2026 Housekeeping Summary V2.0
Upload document
June 2026 Housekeeping Summary (1).xlsx
Archive
Off
Document title
June 2026 Housekeeping legal text v3.0
Upload document
June 2026 Housekeeping legal text v3.0.zip
Archive
Off
Problem Statement
This Housekeeping Change Proposal seeks to make typographical and formatting corrections that have been identified and improve consistency across the REC.
Stages Selection
R0320 Housekeeping Change Report v1.1
Company Name
REC Code Manager
Review status
Review required
Introduction of Consumer Consent Service
Date of latest update
Type
Change
ID
R0318
Date of next activity
Change Category
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
18/11/2026 - The Issue was progressed to Change Proposal on 17 November 2026. Following industry consultation on the REC drafting a number of refinements to the CCS design and drafting are being made. On progression to Change Proposal and Modification, the title has been updated to Introduction of Consumer Consent Service (not Solution) to reflect the new service that will be introduced.
Summary
This initiative will support the transformation of how energy is managed and consumed by giving consumers control over their energy (gas, electricity, heat, or other) data, enabling innovation through third-party services, and advancing sustainability goals. This REC Issue is being raised to promote visibility and awareness of opportunities for engagement, in advance of the CCS Change Proposal being progressed.
Change Plan
Proposal Plan (Approved)
Completed
Start:
02 Apr 2026Due:
02 Apr 2026Completion:
02 Apr 2026Update to Plan (Approved)
Completed
Start:
30 Sep 2026Due:
30 Sep 2026Completion:
30 Sep 2026Definition
Completed
Start:
02 Apr 2026Due:
17 Nov 2026Completion:
17 Nov 2026Business Case Assessment
In Progress
Start:
18 Nov 2026Due:
18 Dec 2026Completion:
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
RECCo | Consumer Consent Programme page
Archive
Off
Document title
Consumer Consent Hub - REC Portal
Archive
Off
Document title
Consumer Consent Solution Design Consultation (March 2026)
Archive
Off
Document title
RECCo's response to the CCS Design Consultation - 28 May 2026
Archive
Off
Problem Statement
A new set of arrangements for a Consumer Consent Solution (CCS) is currently being developed under the RECCo CCS project. The new arrangements will need to be implemented within the REC so that they can be governed under the REC on an enduring basis.
Stages Selection
Stages Selection
Workgroup
Workgroup(s)
I0318 submission form
RECCHIG_26_0305 - I0318 Consumer Consent Solution
I0318 Change Proposal Re-Plan v2.0 APPROVED 30.09.2026.
I0318 Change Report (Proposal Plan) v1.0 APPROVED 02.04.2026
Company Name
Retail Energy Code Company Ltd
Review status
Review required
Clarification of Data Items within the Payment Method Levelisation Supplier Data Reporting Specification
Date of latest update
Type
Change
ID
R0316
Change Category
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
The definition of certain data items within the PML schedule is currently ambiguous and open to misinterpretation by Suppliers, which may result in inconsistent data submissions and a consequential variation in the allocation of scheme debits and credits.
Change Plan
Proposal Plan approved at Change Panel
Completed
Start:
Due:
Completion:
03 Mar 2026Final Recommendation approved at Change Panel
Completed
Start:
Due:
Completion:
06 Apr 2026Impacted REC Parties and Market Participants
Status
Implementation Date
26 June 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0316 Legal Text For Consultation
Upload document
REC Schedule 1 - For Consultation v1.1.zip
Archive
Off
Document title
CODE_YYYYMM[_x]
Upload document
Submission template.csv
Archive
Off
Problem Statement
There is a lack of clarity in REC Schedule 31 – Payment Method Levelisation Reconciliation around the definition of Primary Meter Points, which has led to inconsistent data submission and consequential variation in the allocation of PML scheme debits and credits.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0316 submission form
R0316 Guidance for Suppliers
R0316 Change Report (Proposal Plan and Consultation)
R0316 Consolidated Consultation Responses V1.0 (26.03.2026)
R0316 Change Report (Final Recommendation) v1.0 Approved 07.04.2026
R0316 Authority Decision
Company Name
RECCo
Review status
Review required
Crossed Meters Process: Clarifications and Support
Date of latest update
Type
Issue
ID
I0314
Change Category
Change Path
Priority
Urgent
No
Latest Update
On 30 October 2026, the REC Change Panel approved an Extension to Plan for I0314 via ex-committee.
Summary
This issue seeks to solve is the gap between the documented REC Crossed Meters process and how it is being applied operationally. The aim is to ensure all parties fully understand the process, apply it consistently, and have the support necessary to achieve timely, correct resolution of Crossed Meter cases.
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0314 submission form
I0314 Change Report (Proposal Plan) Approved 21.04.26
I0314 Extension to Plan V1.0 (Approved) 30.10.26
Company Name
REC Code Manager
Review status
Review required
Erroneous Switch Review: Amendments to Clause 4.5
Date of latest update
Type
Change
ID
R0313
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/10/2026 REC Change Panel voted to approve the Extension to Plan for R0313 via an ex-committee decision.
Summary
Schedule 30, Section B, Clause 4.5 currently permits Energy Suppliers to raise an Erroneous Switch (ES) within 24 months of the suspected ES taking place. However, analysis from the I0237 Erroneous Switch Review shows that 98% of ESs are raised within the first 12 months.
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- Amend Schedule 30 – Resolution of Consumer Facing Switching and Billing Issues, Section B, Clause 4.5 to reduce the timeframe to 12 months and ensure Consumer contact is made in a reasonable timescales.
Problem Statement
The existing 24‑month allowance no longer reflects operational practice and maintains an unnecessarily long resolution period that adds complexity and increases the potential for data quality issues, Consumer confusion, and prolonged operational uncertainty. When the original 24‑month time limit was introduced (prior to REC Go‑Live), it was expected that this would later be reduced to 12 months soon after implementation. However, this subsequent reduction did not take place.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Workgroup
Workgroup(s)
R0313 submission form
R0313 - Change Report (Proposal Plan) V1.0 (Approved) 19.05.2026
R0313 - Change Report (Extension to Plan) V1.0 Approved 27.08.2026
R0313 - Change Report (Update to Plan) V1.0 (Approved)
Company Name
REC Code Manager
Review status
Review required