Market Role Code
ES
Harmonised context
ES
Explore use of CHECK as a Meter Type option on J0483 DI-059
Date of latest update
Type
Issue
ID
I0344
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
Change Report (Proposal Plan) has been published for REC Change Panel approval on 17 November 2026.
Summary
It has been suggested that CHECK meters should not be sent within industry messages so the presence of this value within the valid set may not be required. This Issue has been raised to explore whether this assumption is correct, look at the existing/historic use cases industry have used the CHECK option for, if they are no longer valid and if so why not.
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
Solution Development
Problem Statement
The DI-059 / J0483 Meter Type Data Item is shared between the Balancing and Settlement Code’s Data Integration Platform (DIP) and the REC’s Data Catalogue. The CHECK Meter Type does not have a valid MHHS Market Segment combination and is not a valid enumeration under the DIP version of DI-059 / J0483. Having an enumeration that is valid in one version of the Data Item and not valid in another causes confusion as to what enumerations are valid for this Data Item. As part of this Issue, we will also explore whether use of the LAG_, LEAD_, and MAIN_ meter types are still necessary to be kept within D-Flows, even though they are valid meter types for MHHS arrangements.
Stages Selection
Stages Selection
Workgroup
Workgroup(s)
I0344 submission form
Change Report - Proposal Plan
Company Name
-
Review status
Review required
MSC - Amending Statement Production Timescales
Date of latest update
Type
Change
ID
R0343
Change Category
Change Path
Urgent
Yes
Latest Update
06/11/26 - This Change Proposal has been implemented as part of the 6 November 2026 REC Release.
Summary
RECCo is implementing the MSC solution in two phases to enable a swift restart of the MSC scheme, should a decision be made to recommence it. Phase one will enable data collection and the tracking of Supplier liabilities, allowing the scheme to commence before the full solution is available. Phase two will introduce the calculation and financial components.
Change Plan
Proposal Plan approved at Change Panel
Completed
Start:
Due:
Completion:
15 Sep 2026Final Recommendation approved at Change Panel
Completed
Start:
Due:
Completion:
20 Oct 2026Status
Implementation Date
06 November 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0180 | Clarity on use of on hold for switching issues, including the obligations of CSS Users |
|
| R0207 | Import / Export MOA Charging Clarification |
|
| R0253 | Theft - DNO/Networks not providing photos |
|
| R0261 | Addition of Export flag in D0303 flows | |
| R0266 | REC Data Specification Clarifications |
|
| R0317 | Number of Displayed Register Digits Data Item linkage | |
| R0328 | Removal of D0383 & D0384 requirements from Sharing MTDs process |
|
| R0336 | Legal text to support REC Change R0180 |
|
| R0343 | MSC - Amending Statement Production Timescales | |
| R0345 | Housekeeping November 2026 |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 11 Nov 2026 | ||
| 1.0 | 11 Nov 2026 |
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0343 Draft Schedule 22 Market Stabilisation Charge v1.0
Upload document
I0343 Draft Schedule 22 Market Stabilisation Charge v1.0.docx
Archive
Off
Problem Statement
The REC currently requires statements relating to MSC to be provided to Energy Suppliers within 15 working days of the relevant MSC cycle. However, during the phased implementation of the MSC scheme, this timeframe may not provide sufficient time to reconcile the data collection while the calculation functionality is still under development.
Stages Selection
I0343 submission form
R0343 Change Report (Consultation) v1.0 Approved 15.09.26
R0343 Consolidated Consultation Responses v1.0
R0343 Change Report (Final Recommendation) V1.0 Approved 20.10.26
Company Name
RECCo
Review status
Review required
Enabling Dual MSA & MSS (SVA MOA) appointments for WC connection types
Date of latest update
Type
Change
ID
R0342
Change Path
Priority
Urgent
No
Latest Update
26/10/2026 - The Consultation has closed. The Code Manager is assessing the responses.
Summary
Under the legacy/pre-MHHS arrangements the market is segmented by Measurement Class (MC) for settlement purposes which is not sensitive to the Meter type that is installed or is to be installed, meaning that the replacement of Traditional meters to either smart or Advanced metering equipment can be arranged without the need for the Change of Measurement Class (CoMC) process to be conducted concurrent with the meter exchange (MEX). Under MHHS, when a WC connection goes through a MEX from Traditional to Advanced, or from Advanced to Smart in the MHHS arrangements a new complexity is placed on suppliers because the CoSeg process must be tightly co-ordinated to a specified planned MEX date and processed through the MPRS within 3 Working Days of that date.
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0342 Legal Drafting
Upload document
R0342 Legal Drafting V1.0 (1).docx
Archive
Off
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0342 submission form
R0342 Change Report (Proposal Plan and Consultation) v1.1 Approved
R0342 Consolidated Non-Confidential Consultation Responses
Company Name
Npower Commercial Gas Limited
Review status
Review required
REC Change to align with BSC CP Clarify Supplier obligations for IF-002 messages where a Switch is cancelled
Date of latest update
Type
Change
ID
R0339
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
On 11 November 2026, the REC Metering Expert Panel voted, in line with the Code Manager’s recommendation, to approve this Change Proposal. The appeal window is now open until 25 November 2026. Subject to no appeal raised, R0339 will be implemented on 26 February 2027.
Summary
A BSC CP has been raised to clarify Supplier obligations for IF-002 messages where a Switch is cancelled. This obligation is also in REC Schedule 14 Metering Operations, so a REC change is required or the obligation remains in place.
Change Plan
Proposal Plan approved by Change Panel
Completed
Start:
15 Sep 2026Due:
15 Sep 2026Completion:
15 Sep 2026Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
26 February 2027
| Included changes | Affected REC Items | |
|---|---|---|
| R0292 | Obligate Energy Suppliers to provide photo evidence of Theft in Conveyance to Network Parties | |
| R0322 | Erroneous Switch Review: I0237 Clarifications | |
| R0324 | Use of REL Data to Support Key Regulations |
|
| R0339 | REC Change to align with BSC CP Clarify Supplier obligations for IF-002 messages where a Switch is cancelled |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0339_Draft Schedule 14 v1.0
Upload document
R0339_Draft Schedule 14 v1.0.docx
Archive
Off
Problem Statement
BSC CP1646 has been raised to address ambiguity around Supplier obligations following receipt of IF-002 messages for cancelled registration Switch Requests. The same obligation exists within the REC, so a REC change is needed to align with the clarifications introduced by BSC CP1646, ensuring consistent interpretation and behaviour across industry.
Stages Selection
Workgroup
Workgroup(s)
R0339 submission form
R0339 Change Report (Proposal Plan and Consultation) v1.0 Pre-Approval
R0339 Change Report (Proposal Plan and Consultation) v1.0 Approved 15.09.2026
R0339 Consolidated Consultation Responses v1.0
R0339 Change Report (Final Recommendation) v1.0 Pre Approval
R0339 Change Report (Final Recommendation) v1.0 Approved 11.11.26
Company Name
REC Code Manager / CCSG Representative
Review status
Review required
Legal text to support REC Change R0180
Date of latest update
Type
Change
ID
R0336
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/11/26 - This Change Proposal has been implemented as part of the 6 November 2026 REC Release.
Summary
REC Change R0180 “Clarity on use of on hold for switching issues, including the obligations of CSS Users” implements a technical solution for the closure of certain ticket raised to the Switching Operator when no response has been received. This Change Proposal contains the legal text to support R0180.
Change Plan
Change Report (Proposal Plan) approved by Change Panel ex-committee
Completed
Start:
Due:
Completion:
19 Aug 2026Solution presented at Technical Expert Panel
Completed
Start:
Due:
Completion:
26 Aug 2026Presented at Change Issues Group
Completed
Start:
Due:
Completion:
03 Sep 2026Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
06 November 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0180 | Clarity on use of on hold for switching issues, including the obligations of CSS Users |
|
| R0207 | Import / Export MOA Charging Clarification |
|
| R0253 | Theft - DNO/Networks not providing photos |
|
| R0261 | Addition of Export flag in D0303 flows | |
| R0266 | REC Data Specification Clarifications |
|
| R0317 | Number of Displayed Register Digits Data Item linkage | |
| R0328 | Removal of D0383 & D0384 requirements from Sharing MTDs process |
|
| R0336 | Legal text to support REC Change R0180 |
|
| R0343 | MSC - Amending Statement Production Timescales | |
| R0345 | Housekeeping November 2026 |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 11 Nov 2026 | ||
| 1.0 | 11 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0336 Schedule 26 Switching Service Management - for consultation
Upload document
R0180 Schedule 26 Switching Service Management - for consultation.docx
Archive
Off
Document title
R0336 Switching Operator (SO) Service Definition - for consultation
Upload document
R0180 Switching Operator (SO) Service Definition - for consultation.docx
Archive
Off
Problem Statement
R0180 Clarity on use of on hold for switching issues, including the obligations of CSS Usersintroduces a technical solution for the closure of certain tickets raised to the Switching Operator when no response has been received. Without supporting legal text, these obligations and expectations are not documented within the REC.
Stages Selection
SME
SME Role
Lead Technical Analyst
R0336 submission form
R0336 Change Report (Proposal Plan and Consultation) V1.0
R0336 Consolidated Consultation Responses v1.0
R0336 Change Report (Final Recommendation) v1.0 Approved 30.09.2026
Company Name
REC Code Manager
Review status
Review required
Regulatory Alliance Creation Rejections
Date of latest update
Type
Change
ID
R0331
Change Category
Change Path
Priority
Urgent
No
Latest Update
20/10/2026 The Change Report (Update to Plan) was approved by the REC Change Panel on 20 October 2026, and the Issue progressed to a Change Proposal on 22 October 2026.
Summary
An incident where Network Parties did not submit Regulatory Alliances on time to the Central Switching Service (CSS) Provider, or did submit the Regulatory Alliances but did not action rejections from the CSS Provider in a timely manner, led to over 200 Consumers being delayed in Switching to their chosen Energy Supplier. This Change Proposal has been raised to review this process.
Change Plan
Change Report (Proposal Plan) approved at Change Panel
Completed
Start:
Due:
Completion:
18 Aug 2026Presented at Change Issues Group
Completed
Start:
Due:
Completion:
03 Sep 2026Update to plan approved by Change Panel
Completed
Start:
Due:
Completion:
20 Oct 2026Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0331 Schedule 24 Switching Data Management
Upload document
I0331 Schedule 24 Switching Data Management v0.6.docx
Archive
Off
Problem Statement
The lack of Service Level Agreements (SLAs) on Network Parties to submit Regulatory Alliances to the CSS Provider or to work any rejections received from the CSS Provider can lead to delays in Consumers being able to Switch to their chosen Energy Supplier.
Stages Selection
SME
SME Role
Lead Assurance Analyst
I0331 submission form
I0331 Change Report (Update to Plan) - Approved 20/10/26
I0331 Change Report (Proposal Plan) V1.0 approved 18.08.26
I0331 Consolidated Impact Assessment Responses v2.0
I0331 Update to Plan Approved 20.10.2026
Company Name
SQE Energy
Review status
Review required
Removal of D0383 & D0384 requirements from Sharing MTDs process
Date of latest update
Type
Change
ID
R0328
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/11/26 - This Change Proposal has been implemented as part of the 6 November 2026 REC Release.
Summary
Schedule 14 - Metering Operations currently holds obligations for a Meter Operator Agent (MOA) to send a D0383 ‘Notification of Commissioning Information’ to Electricity Suppliers, Distribution Network Operators (DNOs), Data Services and Data Collectors in certain process steps. The D0383 was not shared with these Parties in legacy arrangements, and there is no requirement for it to be sent to facilitate the MHHS arrangements. There are similar requirements to send the D0384 ‘Notification of Commissioning Status’ to these Parties, when it is only required by the Electricity Supplier. These requirements were introduced by the MHHS Design in error and need to be removed.
Change Plan
Change Report (Proposal Plan) approved at Change Panel
Completed
Start:
Due:
Completion:
21 Jul 2026Presented at Change Issues Group
Completed
Start:
Due:
Completion:
06 Aug 2026Change Report (For Consultation) presented to Metering Expert Panel
Completed
Start:
Due:
Completion:
12 Aug 2026Final Recommendation approved at MEP
Completed
Start:
Due:
Completion:
14 Oct 2026Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
06 November 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0180 | Clarity on use of on hold for switching issues, including the obligations of CSS Users |
|
| R0207 | Import / Export MOA Charging Clarification |
|
| R0253 | Theft - DNO/Networks not providing photos |
|
| R0261 | Addition of Export flag in D0303 flows | |
| R0266 | REC Data Specification Clarifications |
|
| R0317 | Number of Displayed Register Digits Data Item linkage | |
| R0328 | Removal of D0383 & D0384 requirements from Sharing MTDs process |
|
| R0336 | Legal text to support REC Change R0180 |
|
| R0343 | MSC - Amending Statement Production Timescales | |
| R0345 | Housekeeping November 2026 |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 11 Nov 2026 | ||
| 1.0 | 11 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0328 legal text V0.1
Upload document
R0328 legal text V0.1.zip
Archive
Off
Problem Statement
Schedule 14 - Metering Operations puts obligations on MOAs which are both not required and impossible to fulfil (as the Scenario Variants to send the D0383 from the MOA to the Electricity Supplier, DNO, Data Service and Data Collector do not exist). There are similar problems for the D0384, which is only required to be sent from the MOA to the Electricity Supplier.
Stages Selection
R0328 submission form
R0328 Change Report (Proposal Plan) v1.0 - approved 21.07.26
R0328 Change Report (For Consultation) V1.0 approved 12.08.26
R0328 Consolidated Consultation Responses v1.0
R0328 Change Report (Final Recommendation) V1.0 Approved 14.10.26
Company Name
REC Code Manager
Review status
Review required
Provision of Standard industrial Classification (SIC) Code to REC Parties
Date of latest update
Type
Issue
ID
I0327
Priority
Urgent
No
Latest Update
18/11/2026 - On 17 November 2026, the REC Change Panel approved the Change Report (Proposal Plan) for I0327 in line with the Code Manager's recommendation. The Information Request will close on 04 December 2026.
Summary
As part of the planning required to deliver Net Zero, Gas Distribution Networks (GDNs) are obligated to plan Industrial and Commercial (I&C) gas demand at a more granular, site-specific level. To meet this obligation, access to Standard Industrial Classification (SIC) Code data, matched to both Gas and Electricity Meter Point Reference Numbers, would provide a significantly improved understanding of I&C customers.
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Solution Development
Problem Statement
As part of the planning required to deliver Net Zero, Gas Distribution Networks (GDNs) are obligated to plan Industrial and Commercial (I&C) gas demand at a more granular, site-specific level. Ofgem, DESNZ and NESO increasingly require GDNs to present detailed information on the types of I&C activities operating within each Network footprint to support robust long-term whole-system planning. To meet this obligation, access to Standard Industrial Classification (SIC) Code data, matched to both Gas and Electricity Meter Point Reference Numbers, would provide a significantly improved understanding of I&C customers. This data would enable GDNs to:
- characterise current I&C gas demand more accurately,
- identify patterns and drivers of consumption across different industrial and commercial sectors, and
- engage more effectively with site operators to understand their ongoing and future energy needs.
By improving visibility of the industrial and commercial landscape across the network, GDNs would be able to plan current demand more effectively, better identify areas requiring continued investment, and support whole system partners such as DNOs where cross vector interactions may be relevant, ensuring planning decisions remain aligned with customers’ needs while supporting the broader Net Zero transition. This data would also improve targeted engagement with strategically significant I&C sites, allowing networks to better understand operation drivers, decarbonisation constraints and long-term energy requirements rather than that of current and historic consumption trends.
- characterise current I&C gas demand more accurately,
- identify patterns and drivers of consumption across different industrial and commercial sectors, and
- engage more effectively with site operators to understand their ongoing and future energy needs.
By improving visibility of the industrial and commercial landscape across the network, GDNs would be able to plan current demand more effectively, better identify areas requiring continued investment, and support whole system partners such as DNOs where cross vector interactions may be relevant, ensuring planning decisions remain aligned with customers’ needs while supporting the broader Net Zero transition. This data would also improve targeted engagement with strategically significant I&C sites, allowing networks to better understand operation drivers, decarbonisation constraints and long-term energy requirements rather than that of current and historic consumption trends.
Stages Selection
Stages Selection
Workgroup
Workgroup(s)
I0327 submission form
Change Report - Proposal Plan
I0327 Change Report (Proposal Plan) Approved 17.11.26
Company Name
-
Review status
Review required
Erroneous Switch Review: Assurance Reporting Update
Date of latest update
Type
Issue
ID
I0326
Change Path
Priority
Urgent
No
Latest Update
On 30 October 2026, the REC Change Panel voted to approve this Extension to Plan for I0326 via ex-committee decision.
Summary
There is gap in the Erroneous Switch (ES) Performance Assurance reporting as the DTN does not provide MPXN level data up front. It requires individual ES permission before MPXNs are provided. However, CSS reporting does provide monthly MPXN level report. As such end-to-end monitoring of the ES process cannot be carried out at a MPXN level.
Status
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Problem Statement
There is a lack of consistency in the level of data granularity provided for ES Performance Assurance reporting across industry systems. Specifically, the DTN provides only aggregated data unless explicit permission is obtained from individual Energy Suppliers for each MPxN, whereas the CSS routinely produces monthly reports at MPxN level. This misalignment restricts the ability to access comparable, detailed datasets across platforms and prevents effective end-to-end monitoring and assurance of the ES process at MPxN level.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0326 submission form
I0326 Change Report (Proposal Plan) (Approved) v1.1 07.07.26
I0326 Change Report (Update to Plan) Pre-Approval
I0326 Change Report (Update to Plan) v1.0 Approved 30.10.26
Company Name
RECCo
Review status
Review required
Tariff Interoperability Phase 1a – Supplier Performance Assurance Requirements
Date of latest update
Type
Change
ID
R0323
Change Category
Change Path
Priority
Urgent
No
Latest Update
On 27 October 2026, the REC Performance Assurance Board, in line with the Code Manager recommendation Approved R0323
Summary
Obligations are being introduced into the REC to require Suppliers to make Tariff Pricing Data available to Tariff Interoperability Users (TI Users) using a new Tariff Interoperability Application Programming Interface (TI API). This proposal will provide Code Manager with data to assure supplier performance against obligations in a new REC Schedule: Tariff Interoperability Arrangements.
Impacted REC Parties and Market Participants
Status
Implementation Date
18 February 2027
| Included changes | Affected REC Items | |
|---|---|---|
| R0323 | Tariff Interoperability Phase 1a – Supplier Performance Assurance Requirements |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
This proposal will provide the Code Manager with data to assure Supplier performance against obligations in a new REC Schedule: Tariff Interoperability Arrangements. If Suppliers do not meet their Tariff Interoperability obligations, this could lead to Consumers’ Energy supply not being optimised, meaning that Consumers may incur higher charges. If price signals are not responded to through optimisation, this may also have other impacts such as reduced Net Zero benefits and reduced response to capacity constraints.
Stages Selection
Workgroup
Workgroup(s)
I0323 submission form
I0323 - REC Prioritisation Matrix
I0323 Change Report (Proposal Plan) Approved
R0323 Legal Drafting
I0323 Party IA Request
I0323 Consolidated Party IA Responses NON-CONFIDENTIAL
R0323 Change Report (For Consultation)
R0323 Consolidated Non-Confidential Consultation Responses
R0323 Change Proposal Re-Plan v1.0 Approved 29.09.26
R0323 Legal drafting - Final
R0323 Change Report (Final Recommendation) V1.1 Approved
Company Name
RECCo
Review status
Review required