Schedule 6 - Performance Assurance 2.6 – Implemented on
Market Participant Applicability
Market participant All Sections
Domestic Suppliers Mandatory
Non-Domestic Suppliers Mandatory
Gas Transporters Mandatory
Distribution Network Operators Mandatory
DCC Mandatory
Metering Equipment Managers Mandatory
Non-Party REC Service Users Mandatory
Loading...

Change to Location (A0059) data item within the ONAGE APPT file to MAMs, from ‘Optional’ to ‘Mandatory’

Date of latest update
Type
Change
ID
R0337
Priority
Urgent
No
Latest Update
17/11/2026 - Change Report (Proposal Plan) approved by the REC Change Panel.
Summary
Currently, the location (A0059) data item within the ONAGE APPT file from Suppliers to MAMs is Optional, this allows a Supplier to leave this field blank. Currently SGNCS system functionality is designed to reject the file if this field is blank. This is due to SGNCS requiring to hold the location of the meter installation in order to allow us to deliver on our safety obligations as a MAM in maintaining of an asset.
Proposer
Marc Gasson
Issue Report - Issue Closure Report
Status
Implementation Status
Date Raised
Fuel
Lead Analyst
Ian Chalfon
Solution Development
Proposed Solution Document
Document title
I0337 legal text changes
Upload document
I0337 proposed solution.pdf
Archive
Off
Problem Statement
ONAGE files are Market Messages sent from Gas Suppliers to Gas Metering Asset Managers (MAMs) to appoint or de-appoint the MAM following a change of Energy Supplier or a change of MAM. The 'Location Code' (A0059) Data Item within ONAGE tells MAMs where a meter is located within the property (“01 = cellar”, “02 = under stairs”, etc). A0059 is currently an 'Optional' data item, which means that ONAGE entries are valid even where A0059 is blank. Although most Energy Suppliers send ONAGE files that always have A0059 populated, including when it is "00 = unknown", it is possible for ONAGE files to be sent with a blank ‘Location Code’. This Issue was raised by a MAM who has identified that this leads to rejections of the ONAGE appointment (APPT) files where the A0059 is left blank as this is a mandatory field in their internal systems. The location of the meter installation is also required for MAMs to deliver their safety and asset maintenance obligations.
Workgroup
Workgroup(s)
I0337 submission form
Company Name
-
Review status
Review required

Smart Meter Communication Licence Code Changes

Date of latest update
Type
Change
ID
R0333
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented on 01 October 2026.
Summary
Ofgem has awarded the Smart Meter Communications Licence 2 (SMCL2) to DCC2 Limited, a subsidiary of Smart Energy Code Company Limited (SECCo). To enable a smooth transition and ensure continuity of service, changes to both the Smart Energy Code (SEC) and the Retail Energy Code (REC) will be required.
Proposer
Holly Law
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Lydia Bentley
Solution Development
Proposed Solution Document
Document title
R0333 - Legal Text V1.1 28.08.26
Upload document
R0333 - Legal Text V1.1 28.08.26.pdf
Archive
Off
Document title
R0333 - Legal Text V1.0 28.07.26
Upload document
I0333 - Legal Text V1.0 28.07.26 (1).pdf
Archive
Off
SME
SME Role
Lead Assurance Analyst
I0333 Submission Form (PDF)
R0333 Change Report (Consultation) (Approved) 04.08.26
R0333 Consolidated Consultation Responses V1.0 08.09.26
R0333 Change Report (Final Recommendation) (Post-Vote) 15.09.26
Company Name
Code Manager RPS
Review status
Review required
Schedule 6 - Performance Assurance 2.5 – Implemented on
Market Participant Applicability
Market participant All Sections
Gas Transporters Mandatory
Distribution Network Operators Mandatory
DCC Mandatory
Metering Equipment Managers Mandatory
Non-Party REC Service Users Mandatory
Non-Domestic Suppliers Mandatory
Domestic Suppliers Mandatory
Loading...

Annual Address Management Plan Updates

Date of latest update
Type
Change
ID
R0283
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
Address management is the responsibility of DCC, with support from REC Parties. There has been progress resolving address data issues, but there is no mechanism to clearly establish code level targets for address improvement, or overall market performance.
Proposer
anton.moden
Change Plan

Proposal Plan approved at Change Panel

Completed

Start:

Due:

Completion:

21 Oct 2025

Final Recommendation approved at Change Panel

Completed

Start:

Due:

Completion:

16 Dec 2025
Impacted Consumers
Impacted REC Services
Status
Implementation Date
Status Superseded
EMAR Version 4.2.0_Superseded
Included changes Affected REC Items
R0179 Proposal for Limiting Queries in EES API Calls (Single Query per API Call)
R0190 Related Meter Point RMP status rules
  • Schedule 28 - Related Metering Points
R0198 Metering Asset Manager (MAM) Communication Method Register
R0242 Missing Scenario Variant from R0043
  • Market Message Catalogue
R0244 C21 to be introduced into STIRG Document
  • Data Item Catalogue
R0235A Missing Scenario Variants in D0179 Alternate Solution
R0256 MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101
  • Market Message Catalogue
R0270 Clarification of SIP Qualification Requirements
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 15 - Metering Accreditation
R0271 Clarification of ASP, AMI, and EMO Accession Requirements
  • Schedule 15 - Metering Accreditation
  • Schedule 1 - Interpretations and Definitions
R0272 Enabling transparency of the CRS Provider’s REC service level performance
  • Schedule 1 - Interpretations and Definitions
  • Schedule 6 - Performance Assurance
  • Schedule 26 - Switching Service Management
  • Schedule 24 - Switching Data Management
R0277 Data Latency SLA Alignment for Gas Enquiry Service
  • Schedule 1 - Interpretations and Definitions
R0280 CSS Certificate Authority audit clarification
  • Schedule 1 - Interpretations and Definitions
R0283 Annual Address Management Plan Updates
  • Schedule 1 - Interpretations and Definitions
  • Schedule 6 - Performance Assurance
  • Schedule 29 - Address Management
R0287 Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0293 Housekeeping February 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0283 Legal Text For Consultation
Upload document
R0283 Legal Text For Consultation.zip
Archive
Off
Problem Statement
The REC Address Management Service is the responsibility of DCC, with support from REC Parties. There has been progress resolving address data issues, but there is no mechanism to clearly establish code level targets for address improvement, or overall market performance.
SME
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
R0283 submission form
R0283 Change Report (Proposal Plan) v1.0 approved 21/10/2025
R0283 Change Report (For Consultation) v1.0
R0283 Consolidated Consultation Responses v1.0
R0283 - Change Report (Final Recommendation) Approved 16.12.25 v1.0
Company Name
REC Code Manager
Review status
Review required

Establishing the Safe Isolation Provider (SIP) as a Standalone REC Party

Date of latest update
Type
Issue
ID
I0278
Change Category
Change Path
Priority
Urgent
No
Latest Update
21/07/2026 - An Update to Plan has been approved by the Change Panel on 21 July 2026.
Summary
This proposal recommends the formal recognition of the Safe Isolation Provider (SIP) as a standalone Party under the Retail Energy Code (REC). This aligns with the direction set out in Ofgem’s recently published Strategic Direction Statement (SDS), which explicitly calls for the establishment of SIPs as a standalone Party role. The aim is to address the growing scale of unregulated SIP activity, mitigate associated consumer safety risks, and ensure the metering industry is equipped to support the UK’s Net Zero ambitions. By enabling easier access to certified SIPs, this change will enhance consumer protection, accelerate low-carbon technology deployment, and improve operational efficiency across the energy sector.
Proposer
Rebecca Griffiths
Change Report - Initial Assessment and Change Plan Report

Comments deadline
Impacted Consumers
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Problem Statement
The current SIP framework poses several risks: - Consumers, MEMs and unaccredited practitioners’ safety. Unaccredited and unregulated isolation work increases the risk of unsafe installations and potential harm to Consumers. NAPIT highlighted to RECCo and DESNZ that 17 and 13 unregulated practitioners respectively died in 2023 and in 2024 due to unsafe isolation. With the right Party undertaking this work, there would also be less safety issues for the Consumer at their premises; - Inequity. Independent Installers face longer wait times compared to supplier-led installations, creating a two-tier system; - Low competitive market. Currently prospective Parties can be put off from applying to be a SIP as it appears they would need full MEM Accreditation which is often too far outside their current business operating model. Providing SIPs with their own pathway and requirements could result in more Parties becoming SIPs and therefore giving Consumers more choice in their provider; and - Decarbonisation delays. The inability to scale SIP capacity undermines the timely deployment of LZCTs, threatening Net Zero targets.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
I0278 submission form
I0278 Change Report (Proposal Plan) V1.0 (Pre-Approval) 09.10.2025
I0278_Change Report (Extension to Plan) v1.0 (Pre-Approval) 12.01.2026
I0278_Change Report (Extension to Plan) v2.0 (Pre-Approval) 13.07.2026
I0278_Change Report (Extension to Plan) v2.1 (Approved) 21.07.26
I0278_Consolidated Information Request DNO Responses
I0278_Consolidated Information Request MEM-SIP Responses PUBLIC
I0278_Consolidated Information Request RPA Responses
Company Name
RECCo
Review status
Review required

Enabling transparency of the CRS Provider’s REC service level performance

Date of latest update
Type
Change
ID
R0272
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
RECCo regularly reports on the performance of REC Service Providers in relation to their activities under the REC. However, there is currently no formal agreement to permit the publication of CRS performance measures between the CRS Provider and RECCo. Due to the multi-Party agreement, the REC does not specifically address the publication of this performance data. Instead, RECCo are operating under an informal understanding with the CRS Provider, which means there is a possibility that publication may be delayed or not agreed to in a given month. RECCo is dependent on the CRS Provider’s approval for each publication, which can cause delays. This approval could also be withheld at any point.
Proposer
Jenny Bridges
Change Report - Initial Assessment and Change Plan Report
Change report - Final Change Report

Comments deadline
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Status
Implementation Date
Status Superseded
EMAR Version 4.2.0_Superseded
Included changes Affected REC Items
R0179 Proposal for Limiting Queries in EES API Calls (Single Query per API Call)
R0190 Related Meter Point RMP status rules
  • Schedule 28 - Related Metering Points
R0198 Metering Asset Manager (MAM) Communication Method Register
R0242 Missing Scenario Variant from R0043
  • Market Message Catalogue
R0244 C21 to be introduced into STIRG Document
  • Data Item Catalogue
R0235A Missing Scenario Variants in D0179 Alternate Solution
R0256 MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101
  • Market Message Catalogue
R0270 Clarification of SIP Qualification Requirements
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 15 - Metering Accreditation
R0271 Clarification of ASP, AMI, and EMO Accession Requirements
  • Schedule 15 - Metering Accreditation
  • Schedule 1 - Interpretations and Definitions
R0272 Enabling transparency of the CRS Provider’s REC service level performance
  • Schedule 1 - Interpretations and Definitions
  • Schedule 6 - Performance Assurance
  • Schedule 26 - Switching Service Management
  • Schedule 24 - Switching Data Management
R0277 Data Latency SLA Alignment for Gas Enquiry Service
  • Schedule 1 - Interpretations and Definitions
R0280 CSS Certificate Authority audit clarification
  • Schedule 1 - Interpretations and Definitions
R0283 Annual Address Management Plan Updates
  • Schedule 1 - Interpretations and Definitions
  • Schedule 6 - Performance Assurance
  • Schedule 29 - Address Management
R0287 Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0293 Housekeeping February 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. An update to the REC Schedule 6 – Performance Assurance.
Proposed Solution Document
Document title
R0272 Approved legal text (26.01.2026)
Upload document
I0272 draft legal text_v1.1.docx
Archive
Off
Problem Statement
Unlike REC Service Providers, there is currently no formal agreement in place between the CRS Provider and RECCo to publish details about the CRS Provider’s performance. RECCo is therefore dependent on the CRS Provider’s approval for each publication. Not only could there be delays in RECCo’s reporting, but the approval could also be withheld at any point, preventing RECCo’s reporting.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0272 Change Proposal Form
R0272 Consolidated Consultation responses V1.0
Company Name
Code Manager / RECCo
Review status
Review required
Schedule 6 - Performance Assurance 2.4 – Implemented on
Market Participant Applicability
Market participant All Sections
Domestic Suppliers Mandatory
Non-Domestic Suppliers Mandatory
Gas Transporters Mandatory
Distribution Network Operators Mandatory
DCC Mandatory
Metering Equipment Managers Mandatory
Non-Party REC Service Users Mandatory
Loading...
Schedule 6 - Performance Assurance 2.3 – Implemented on
Market Participant Applicability
Market participant All Sections
Domestic Suppliers Mandatory
Non-Domestic Suppliers Mandatory
Gas Transporters Mandatory
Distribution Network Operators Mandatory
DCC Mandatory
Metering Equipment Managers Mandatory
Non-Party REC Service Users Mandatory
Loading...
Schedule 6 - Performance Assurance 2.2 – Implemented on
Market Participant Applicability
Market participant All Sections
Domestic Suppliers Mandatory
Non-Domestic Suppliers Mandatory
Gas Transporters Mandatory
Distribution Network Operators Mandatory
DCC Mandatory
Metering Equipment Managers Mandatory
Non-Party REC Service Users Mandatory
Loading...