Schedule 1 - Interpretations and Definitions 6.8
– Implemented on
Loading...
Schedule 1 - Interpretations and Definitions 6.7
– Implemented on
Loading...
Schedule 1 - Interpretations and Definitions 6.6
– Implemented on
Market Participant Applicability
| Market participant | All Sections |
|---|---|
| Domestic Suppliers | Mandatory |
| Non-Domestic Suppliers | Mandatory |
| Gas Transporters | Mandatory |
| Distribution Network Operators | Mandatory |
| DCC | Mandatory |
| Metering Equipment Managers | Mandatory |
| Non-Party REC Service Users | Mandatory |
| Approved Meter Installers | Mandatory |
| Electricity Metering Operatives | Mandatory |
Loading...
Smart Meter Communication Licence Code Changes
Date of latest update
Type
Change
ID
R0333
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented on 01 October 2026.
Summary
Ofgem has awarded the Smart Meter Communications Licence 2 (SMCL2) to DCC2 Limited, a subsidiary of Smart Energy Code Company Limited (SECCo). To enable a smooth transition and ensure continuity of service, changes to both the Smart Energy Code (SEC) and the Retail Energy Code (REC) will be required.
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0333 - Legal Text V1.1 28.08.26
Upload document
R0333 - Legal Text V1.1 28.08.26.pdf
Archive
Off
Document title
R0333 - Legal Text V1.0 28.07.26
Upload document
I0333 - Legal Text V1.0 28.07.26 (1).pdf
Archive
Off
Stages Selection
SME
SME Role
Lead Assurance Analyst
I0333 Submission Form (PDF)
R0333 Change Report (Consultation) (Approved) 04.08.26
R0333 Consolidated Consultation Responses V1.0 08.09.26
R0333 Change Report (Final Recommendation) (Post-Vote) 15.09.26
Company Name
Code Manager RPS
Review status
Review required
Schedule 1 - Interpretations and Definitions 6.5
– Implemented on
Market Participant Applicability
| Market participant | All Sections |
|---|---|
| Domestic Suppliers | Mandatory |
| Non-Domestic Suppliers | Mandatory |
| Gas Transporters | Mandatory |
| Distribution Network Operators | Mandatory |
| DCC | Mandatory |
| Metering Equipment Managers | Mandatory |
| Non-Party REC Service Users | Mandatory |
| Approved Meter Installers | Mandatory |
| Electricity Metering Operatives | Mandatory |
Loading...
Schedule 1 - Interpretations and Definitions 6.4
– Implemented on
Market Participant Applicability
| Market participant | All Sections |
|---|---|
| Domestic Suppliers | Mandatory |
| Non-Domestic Suppliers | Mandatory |
| Gas Transporters | Mandatory |
| Distribution Network Operators | Mandatory |
| DCC | Mandatory |
| Metering Equipment Managers | Mandatory |
| Non-Party REC Service Users | Mandatory |
| Approved Meter Installers | Mandatory |
| Electricity Metering Operatives | Mandatory |
Loading...
Schedule 1 - Interpretations and Definitions 6.3
– Implemented on
Market Participant Applicability
| Market participant | All Sections |
|---|---|
| Domestic Suppliers | Mandatory |
| Non-Domestic Suppliers | Mandatory |
| Gas Transporters | Mandatory |
| Distribution Network Operators | Mandatory |
| DCC | Mandatory |
| Metering Equipment Managers | Mandatory |
| Non-Party REC Service Users | Mandatory |
| Approved Meter Installers | Mandatory |
| Electricity Metering Operatives | Mandatory |
Loading...
Introduction of Consumer Consent Service
Date of latest update
Type
Change
ID
R0318
Date of next activity
Change Category
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
18/11/2026 - The Issue was progressed to Change Proposal on 17 November 2026. Following industry consultation on the REC drafting a number of refinements to the CCS design and drafting are being made. On progression to Change Proposal and Modification, the title has been updated to Introduction of Consumer Consent Service (not Solution) to reflect the new service that will be introduced.
Summary
This initiative will support the transformation of how energy is managed and consumed by giving consumers control over their energy (gas, electricity, heat, or other) data, enabling innovation through third-party services, and advancing sustainability goals. This REC Issue is being raised to promote visibility and awareness of opportunities for engagement, in advance of the CCS Change Proposal being progressed.
Change Plan
Proposal Plan (Approved)
Completed
Start:
02 Apr 2026Due:
02 Apr 2026Completion:
02 Apr 2026Update to Plan (Approved)
Completed
Start:
30 Sep 2026Due:
30 Sep 2026Completion:
30 Sep 2026Definition
Completed
Start:
02 Apr 2026Due:
17 Nov 2026Completion:
17 Nov 2026Business Case Assessment
In Progress
Start:
18 Nov 2026Due:
18 Dec 2026Completion:
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
RECCo | Consumer Consent Programme page
Archive
Off
Document title
Consumer Consent Hub - REC Portal
Archive
Off
Document title
Consumer Consent Solution Design Consultation (March 2026)
Archive
Off
Document title
RECCo's response to the CCS Design Consultation - 28 May 2026
Archive
Off
Problem Statement
A new set of arrangements for a Consumer Consent Solution (CCS) is currently being developed under the RECCo CCS project. The new arrangements will need to be implemented within the REC so that they can be governed under the REC on an enduring basis.
Stages Selection
Stages Selection
Workgroup
Workgroup(s)
I0318 submission form
RECCHIG_26_0305 - I0318 Consumer Consent Solution
I0318 Change Proposal Re-Plan v2.0 APPROVED 30.09.2026.
I0318 Change Report (Proposal Plan) v1.0 APPROVED 02.04.2026
Company Name
Retail Energy Code Company Ltd
Review status
Review required
Crossed Meters Process: Clarifications and Support
Date of latest update
Type
Issue
ID
I0314
Change Category
Change Path
Priority
Urgent
No
Latest Update
On 30 October 2026, the REC Change Panel approved an Extension to Plan for I0314 via ex-committee.
Summary
This issue seeks to solve is the gap between the documented REC Crossed Meters process and how it is being applied operationally. The aim is to ensure all parties fully understand the process, apply it consistently, and have the support necessary to achieve timely, correct resolution of Crossed Meter cases.
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0314 submission form
I0314 Change Report (Proposal Plan) Approved 21.04.26
I0314 Extension to Plan V1.0 (Approved) 30.10.26
Company Name
REC Code Manager
Review status
Review required
Review of export meter work arrangements
Date of latest update
Type
Change
ID
R0312
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
12/11/2026 The Party impact assessment has now opened until 23:59 on 04/12/2026
Summary
The REC Metering Operations Schedule has limited distinction between the activities for import and export metering. These provisions were not specifically developed to support a market with high volumes of small-scale microgeneration with shared metering assets for import and export.
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
There is a lack of distinction within REC Schedule 14 – Metering Operations between activities for Import and Export Metering, and how to manage work arrangements where is a shared Metering Asset between Import and Export Suppliers.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Workgroup
Workgroup(s)
I0312 submission form
I0312 Change Report (Proposal Plan) v1.0 Approved 21.04.26
Change Report (Update to Plan) V1.0 Pre-Approval 10.11.26
R0312 Process Maps and Proposed Solution Requirements
Company Name
-
Review status
Review required