Aligning electricity and gas timescale requirements for sharing Meter Technical Detail information
Date of latest update
Type
Change
ID
R0109
Change Category
Change Path
Priority
Urgent
No
Latest Update
22/03/2024 - Withdrawn.
Summary
Empty
Impacted Consumers
Impacted REC Documents
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
R0109 - Change Proposal Form
Company Name
Utility Warehouse
Review status
Review required
CSS Message Time Stamping
Date of latest update
Type
Change
ID
R0107
Urgent
No
Latest Update
11/08/2023 - This Change Proposal has been withdrawn. During the progression of the Preliminary Impact Assessment work, it was found that an existing data item ‘EventDate’ could be leveraged to address the issue stated in the Change Proposal. R107 will be open for adoption until 25/08/2023.
Summary
Empty
Change Plan
Test
In Progress
Start:
14 Apr 2023Due:
19 Mar 2026Completion:
19 Mar 2026Status
Implementation Status
Date Raised
Solution Development
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
R0107 - Change Proposal Form
Company Name
DCC
Review status
Review required
Performance Assurance Report Catalogue V5.1
Date of latest update
Type
Change
ID
R0106
Urgent
No
Latest Update
15/11/2023 - R0106 has been withdrawn. Further changes to the Performance Assurance Report Catalogue (PARC) are required and will be delivered through a separate Change Proposal.
Summary
The Report Catalogue has been updated following our annual product review and in line with changes made to the Retail Risk Register, which are going through consultation in parallel.
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
RECPAB_23_Performance Assurance Report Catalogue V5.1 - REDLINE.xlsx
Company Name
REC Code Manager
Review status
Review required
Clarifying requirement for continuous billing following an Erroneous Switch
Date of latest update
Type
Change
ID
R0104
Urgent
No
Latest Update
04/10/2023 - Following the approval of R0138, this change has been withdrawn.
Summary
Schedule 30 (Resolution of Consumer Facing Switching and Billing Issues) includes requirements on Suppliers relating to the identification and resolution of Erroneous Switches. This includes a set of principles and outcomes that Supplier's must adhere to. One of the required outcomes of an Erroneous Switch is that the consumer is only billed once for the period of the Erroneous Switch, and that they are only billed by the Supplier they have a valid contract with. Paragraph 5.2 of the CFSB Schedule sets out that the Losing Supplier should accept responsibility for billing during the period of the Erroneous Switch. However, it is not explicitly clear that the Gaining Supplier should not bill the consumer for consumption during the period of the erroneous supply. This Change Proposal has been raised to review the wording of paragraph 5.2, or the resolution outcomes more generally, so there it is clear to Suppliers, and the REC PAB in their assurance activities, what the expectations are.
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
R0104 Change Proposal form (downloadable version) 02.04.2023
Company Name
RECCo
Review status
Review required
Update to Error Handling Documents
Date of latest update
Type
Change
ID
R0100
Change Category
Change Path
Priority
Urgent
No
Latest Update
Following further solution development under R0178 - Improvements to CSS Business Process Logic, the Code Manager has now determined that the REC products previously considered for amendments under R0100 will require further updates under R0178. As such, R0100 will now be considered under the scope of R0178 rather than progressed as a separate change.
Summary
There are duplications between the CSS Message Business Data Validation Rules document (a Category 2 document) and the CSS Error Processing guide (a Category 3 guidance document), which is resulting in confusion and complications within the error handling process. This Change Proposal has been raised to update the Business Data Validation Rules document, to capture the appropriate information that is removed from the CSS Error Processing guide and to ensure alignment with newly created knowledge articles
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
R0100 - Change Proposal Form 16.03.2023
Company Name
-
Review status
Review required
CSS End User Obligations
Date of latest update
Type
Change
ID
R0099
Change Category
Change Path
Priority
Urgent
No
Latest Update
07/02/25 - This Change Proposal has been withdrawn at the request of the proposer, as it is being developed as part of I0180
Summary
There are multiple observed instances of CSS incidents that have been raised that cannot be resolved without proactive engagement from the end user. There are currently no direct obligations on CSS Users to engage with the incident resolution process, or to provide up to date contact details, which can result in the CSS System Operator struggling to resolve incidents in a timely manner. This results in CSS incidents remaining unresolved and results in a degradation of the effectiveness of the switching process. This Change Proposal has been raised to address this issue.
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
08 November 2024
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0099 Draft Legal Text v1.0 (20.03.2024)
Upload document
Main Body_R0099 Draft v1.0.docx
Archive
Off
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0099 - Change Proposal Form 10.03.2023
Company Name
-
Review status
Review required
Removal of Pre-COVID AQ Value from Data Access Matrix
Date of latest update
Type
Change
ID
R0089
Priority
Urgent
No
Latest Update
05/01/2024 - This change proposal has been withdrawn. Since the implementation of R0118 – Review of Schedule 12 and processes to manage access to data, the Gas Data Access Matrix has been made a Category 3 document and the removal of the Pre-COVID AQ value has been progressed through C3-0058 – Administrative Changes to align to the Data Permissions Matrix. C3-0058 is due for implementation on 26 January 2024. It will be open for adoption until 23:59 19 January 2024.
Summary
Empty
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
Company Name
Xoserve
Review status
Review required
MAP GES data access
Date of latest update
Type
Change
ID
R0087
Change Category
Change Path
Priority
Urgent
No
Latest Update
20/01/25 - Change Proposal withdrawn at proposers request.
Summary
As a MAP I want to be able to track my daily position of my portfolio. As a MAP I want to be able to track changes in my portfolio over time. As a MAP I want to understand who are using my assets and identify where assets are not being used
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
Company Name
Correla
Review status
Review required
ERDS Upload File in the Data Specification and clarification of cancellation code
Date of latest update
Type
Change
ID
R0086
Priority
Urgent
No
Latest Update
06/11/2023 - Withdrawal adoption window closed.
Summary
The MPAS/ERDS Upload file has historically been a part of the Data Specification however during transition from the MRA, the process has been omitted. This change seeks to restore the file to the specification. Secondly, the file previously provided a cancellation reason code for Switches. Under the current REC arrangements (i.e. since CSS go live) Reason codes are not provided and have been defaulting to W which indicated a reason of “withdrawn” which may now be misleading. This Change Proposal has been raised to address these issues
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
R0086 - Change Proposal Form (downloadable version)
Company Name
-
Review status
Review required
Switching Programme Designation of the Steady State Commencement Date
Date of latest update
Type
Change
ID
R0085
Priority
Urgent
No
Latest Update
16/05/2023 - This change has been withdrawn by the Code Manager. The changes required to reflect the designation of the Steady State Commencement Date have been approved under Housekeeping Change Proposal. R0114 will be implemented as part of the June release on 30 June 2023.
Summary
Following Ofgem’s designation of the “Steady State Commencement Date” as 00:01 hours on 31 October 2022, this CP will remove redundant text and make the necessary changes to reflect the designation.
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
R0085 - Change Proposal Form (downloadable version)
Ofgem Designation of the Steady State Commencement Date.pdf
Company Name
-
Review status
Review required