Domestic Premises Indicator Clarifications
Date of latest update
Type
Change
ID
R0246
Urgent
No
Latest Update
11/04/2025 - R0246 withdrawn at proposer's request due to overlap with MHHS M8/M10
Summary
There are two types of Domestic Premises Indicator within electricity flows, namely: • A derived DPI value which is set by the Energy Retail Data Services (ERDS) for each MPAN based on the Measurement Class and Profile Class it holds for that MPAN. • A value set by the Supplier based on the rules of the REC and Electricity Supply Licence, which is passed by the Supplier to the Central Switching Service (CSS). This change seeks to make it clearer to REC Data Specification users which DPI value is which.
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
DPI Clarification - Draft Legal Text.docx
Proposal Form
Company Name
REC Code Manager
Review status
Review required
Request to Continue Processing ECOES Password Resets on Behalf of MAU
Date of latest update
Type
Issue
ID
I0245
Urgent
No
Latest Update
02/06/2025 - this Issue has been rejected by the Code Manager
Summary
To highlight the recent challenges we have experienced with the ECOES password reset process and to request that Mitie be allowed to continue processing password resets on behalf of the MAU.
Status
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
Stages Selection
Proposal form
Company Name
Mitie Energy
Review status
Review required
Data alignment of meter information through MHHS Migration
Date of latest update
Type
Issue
ID
I0240
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/04/2026 - The Code Manager has now published the I0240 - Scenario Guidance Document V2.0 on the REC Portal. This is available on the I0240 Proposal Page and the Market-wide Half Hourly Settlement Hub.
Summary
This Issue looks to address that when Meter updates are made during a Market Wide Half-Hourly Settlement (MHHS) migration, whilst the Meter Technical Details (MTDs) will be shared between participants, there will be no update sent to the Registration Service as the Gaining Meter Operator Agent (MOA) will not know that they need to send a D0312 (for reverse migration) or IF005 (for forward migration) and the Losing MOA cannot send the message.
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0240 - Data Alignment of Meter Information Through MHHS Migration - Scenario Guidance Document V2.0 (30.04.2026)
Upload document
I0240 - Scenario Guidance Document V2.0.pdf
Archive
Off
Problem Statement
During MHHS migration, key Market Messages from the Losing MOA, such as D0312, IF005, D0205, and D0139, are rejected by the Registration Service, preventing updates to meter details and Energisation status. This creates a risk of data misalignment, as the Gaining MOA may not be aware that updates occurred and therefore cannot resend them.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0240 - Submission Form
I0240 - Change Report (Proposal Plan) V1.0 (08.07.2025) Approved
Company Name
ESG Global
Review status
Review required
Erroneous Switch Review: CSS Solution
Date of latest update
Type
Issue
ID
I0237
Change Category
Change Path
Priority
Urgent
No
Latest Update
18/11/2026 On 17 November 2026, the REC Change Panel approved an Update to Plan.
Summary
The current solution for Erroneous Switch (ES) resolution is failing some Consumers, there are gaps in the process and several areas that could be considered for improvement. It has been a number of years since the process has been reviewed end to end. Since then, Faster Switching has been introduced and MHHS is on the horizon.
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Linked to SDS Delivery
Yes
Solution Development
Proposed Solution Document
Document title
I0237 Erroneous Switch Draft Guidance Document V0.2
Upload document
Erroneous Switch_I0237_Draft_Guidance_V0.2_20250312.pdf
Archive
Off
Problem Statement
ES obligations are a key Consumer-impacting process which facilitate the quick resolution of Consumer detriment as efficiently as possible and requires an end-to-end review.
Stages Selection
Stages Selection
Workgroup
Workgroup(s)
Change proposal Form
I0237 - Change Report (Proposal plan) Approved 17.06.2025
I0237 Change Proposal Re Plan V2.0
I0237 Extension to Plan V1.0 Approved 25.06.2026
I0237 - Change Report (Extension to Plan) V4.0 (Approved)
Company Name
-
Review status
Review required
Shared Sites in Electricity Enquiry Service (EES)
Date of latest update
Type
Issue
ID
I0231
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/03/2026 The Proposer has withdrawn this Issue following discussions with industry, where impacted Parties advised waiting for the completion of MHHS migration before progressing this Issue and solution development. The window to adopt this Issue has now closed.
Summary
There is a concern regarding shared sites (as defined by BSCP550) that have multiple suppliers linked to them. The investigation revealed a lack of visibility of these sites, and it appears that the industry is similarly uninformed. Elexon, the REC, and the wider industry do not have a consistent way of identifying these shared sites. Therefore, there is a good chance that agents are holding shared sites within their portfolio without knowing it. We would like to explore whether the EES Online Portal has any flags or mechanisms that could help identify these shared sites.
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- A flag on EES that can help everyone clearly identify the shared site, the primary MPAN and all of the pseudo MPANs attached to it.
Problem Statement
There is a concern regarding shared sites (as defined by BSCP550) that have multiple suppliers linked to them. The investigation revealed a lack of visibility of these sites, and it appears that the industry is similarly uninformed. Elexon, the REC, and the wider industry do not have a consistent way of identifying these shared sites. Therefore, there is a good chance that agents are holding shared sites within their portfolio without knowing it. We would like to explore whether the EES Online Portal has any flags or mechanisms that could help identify these shared sites. If not, could these be added?
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Issue Proposal Form
Company Name
Elexon
Review status
Review required
D0303 flow following MHHS design changes
Date of latest update
Type
Issue
ID
I0230
Change Path
Priority
Urgent
No
Latest Update
29/04/2026 - This Issue has been withdrawn by the Proposer, as there was not a strong preference amongst MAPs of which temporary solution option (if any) should be progressed. Many MAPs already have workarounds in place, and a permanent solution is expected to be progressed in the future through a joint REC / BSC change. The adoption window has closed.
Summary
As part of Market Wide Half Hourly Settlement (MHHS) design, the requirement to provide Data Item Effective from Settlement Date {REGI} (J0049 / DI50025) in the Notification of Meter Operator, Supplier and Metering Assets installed / removed by the MOP to the MAP Market Message (D0303 / MM00240) has been changed from mandatory to optional. This means Meter Asset Providers (MAP) may not receive it.
Change Plan
Change Report (Proposal Plan) approved at Change Panel
Completed
Start:
Due:
Completion:
04 Nov 2025Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
The Effective from Settlement Date {REGI} Data Item being optional rather than mandatory inside the Notification of Meter Operator, Supplier and Metering Assets installed / removed by the MOP to the MAP Market Message means that MAPs may not receive this information required for billing purposes.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
Issue Proposal Form
I0230 Change Report (Proposal Plan) V1.0 approved 04.11.25
I0230 and I0261 Solution Development Report V1.0
I0230 I0261 Q&A session V1.0
I0230 and I0261 Consolidated IR Responses PUBLIC V1.0
Company Name
Calisen Asset Management Limited
Review status
Review required
Supply Point Enquiry API Technical Specification Updates
Date of latest update
Type
Change
ID
R0229
Change Category
Change Path
Priority
Urgent
No
Latest Update
10/02/2025 - Change withdrawn and will be progressed as a Housekeeping change under R0239 Housekeeping Feb 2025. The adoption window has now closed.
Summary
The content detailed in Section 4.2 Responses is incorrect. We would like to amend the responses included in this section so that users are able to access the correct technical specifications for the service that they are consuming.
Change Plan
Change discussed at Change Panel
Completed
Start:
Due:
Completion:
21 Jan 2025Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
The example responses detailed in section 4.2 are broken down as ‘mprn’ with three demoed data items; ‘mprn’, ‘installation name’, and ‘network name.’ this is however not reflective of the correct responses that would actually be returned on an API call. The actual structure is ‘supplier’ with the demoted data items actually being ‘amr_indicator’, ‘amr-sp’, and ‘csep_id.’ Fundamentally, this would mean that users are consuming incorrect information when looking to this document for guidance. This could potentially be causing negative impacts when the document is relied upon, especially for newer users seeking guidance.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
API GES Supply Point Enquiry Technical Specification v2.0.pdf
Change Proposal Form
Company Name
Xoserve
Review status
Review required
ECOES API for Export MPAN Creation at Scale
Date of latest update
Type
Issue
ID
I0228
Change Category
Change Path
Priority
Urgent
No
Latest Update
05/11/2026 - the Proposer has elected to withdraw this Issue as the business case has been covered by R0321, which has been approved by Change Panel for implementation. If you wish to adopt this Issue, please contact the Code Manager by COB 20 November 2026.
Summary
Electricity Suppliers believe there is a significant bottleneck to Export Metering Point creation, which is resulting in them feeling unable to offer Export smart products to a wider audience of Consumer and scale low-carbon technology. The most effective solution is an API within the Electricity Enquiry Service (EES) that allows the Electricity Supplier to request the creation of an Export Metering Point. This could work for both Electricity Suppliers and Distribution Network Operators (DNOs) ensuring that scalable solutions are applied at both sides of the process.
Change Plan
Presented at Change Issues Group
Completed
Start:
Due:
Completion:
06 Mar 2025Presented at REC Change Panel
Completed
Start:
Due:
Completion:
21 Apr 2026Impacted Consumers
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
A restriction of 50 Export Metering Points per DNO per day, with no two DNOs operating the bulk request process in the same way, is overly burdensome to Electricity Suppliers and creating a barrier for Consumers getting an Export Metering Point assigned to their Premise. This is ultimately harming the effort the reach Net Zero.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Issue Proposal Form
Change Issues Group paper - presented March 2025
I0228 Change Report (Proposal Plan) V1.0 approved 21.04.26
I0228 Consolidated Information Request Responses V1.0 PUBLIC
I0228 Update to Plan V1.0 on hold, approved 04.06.26
Company Name
Octopus Energy
Review status
Review required
In-year CRS budget amendment
Date of latest update
Type
Change
ID
R0226
Urgent
No
Latest Update
21/01/25 - Change Panel approved final recommendation for immediate implementation.
Summary
DCC has identified that the CRS budget for the current Financial Year (2024-2025) can be reduced, and as per the Code, a REC Change Proposal must be raised for the agreed budget to be amended.
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Stages Selection
Change Proposal Form
R0226 Change Report - Final Recommendation approved.
Company Name
DCC
Review status
Review required
Agile Reporting within CSS
Date of latest update
Type
Change
ID
R0224
Change Path
Priority
Urgent
No
Latest Update
23/09/2026 - An update to plan has been published for consideration at the Technical Expert Panel on 30 September 26.
Summary
As part of the impact assessment process for R0115, it was identified that it is very costly and time consuming to make reporting changes within the CSS architecture. As such, we would like to explore enabling agile reporting within the CSS ecosystem, by creating a functionality that consolidates all necessary data into a single, centralised database.
Change report - Final Change Report
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
Current CSS arrangements mean that REC Changes designed to facilitate access to CSS data are more onerous that they need to be. Current arrangements are costly and have relatively long lead-times. This Issue seeks to explore changing the way that the CSS data can be accessed.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Proposal Form - Agile reporting within CSS
I0224 Change Report (Plan) (Approved) V1.0 21.01.25
Change Proposal Re-Plan Approved
Solution/Business Case report
R0224 update to plan 18.03.26
R0224 update to plan 19 May 2026
R0224 Update to plan September 2026
Company Name
REC Technical Services
Review status
Review required