Energy Code Reform - consequential changes to the REC
Date of latest update
Type
Change
ID
R0348
Change Category
Change Path
Priority
Urgent
No
Latest Update
The Final Recommendation has been published for determination by the REC Change Panel on 17 November 2026.
Summary
On 04 September 2026, Ofgem published a Statutory consultation to seek views on proposed amendments to the Retail Energy Code and affected licences required to implement the new governance framework. The proposals address the principal changes required to introduce the new code governance arrangements, including the revised Code Modification process, the Stakeholder Advisory Forum (SAF), changes to existing governance arrangements and transitional provisions. A review of the wider REC baseline has identified that implementation of those changes has consequential impacts on other REC Schedules and subsidiary REC products which are not, or are not fully, addressed by Ofgem’s proposed statutory modifications. Ofgem's statutory Code Reform process will itself introduce amendments to the REC, including amendments to a number of REC Schedules. Those amendments are outside the scope of R0348 and are not being proposed, assessed or approved through this Change Proposal. Where a REC Schedule is being amended both by Ofgem and by R0348, the two sets of amendments will need to be read together and, on implementation, consolidated to form the complete revised Schedule
Impacted REC Documents
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Problem Statement
Without corresponding consequential amendments, parts of the REC baseline could retain references, responsibilities, governance arrangements or processes that are inconsistent with reformed REC arrangements. This could create ambiguity over which governance arrangements apply, where responsibilities sit and which process should be followed. It would also mean that different REC products could describe the same arrangements inconsistently.
Stages Selection
Workgroup
Workgroup(s)
Energy Code Reform - consequential changes to the REC submission form
Legal Drafting - consultation
Legal Drafting - Final
R0348 Consolidated consultation responses
Change Report - Final Recommendation
Company Name
-
Review status
Review required
Smart Meter Communication Licence Code Changes
Date of latest update
Type
Change
ID
R0333
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented on 01 October 2026.
Summary
Ofgem has awarded the Smart Meter Communications Licence 2 (SMCL2) to DCC2 Limited, a subsidiary of Smart Energy Code Company Limited (SECCo). To enable a smooth transition and ensure continuity of service, changes to both the Smart Energy Code (SEC) and the Retail Energy Code (REC) will be required.
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0333 - Legal Text V1.1 28.08.26
Upload document
R0333 - Legal Text V1.1 28.08.26.pdf
Archive
Off
Document title
R0333 - Legal Text V1.0 28.07.26
Upload document
I0333 - Legal Text V1.0 28.07.26 (1).pdf
Archive
Off
Stages Selection
SME
SME Role
Lead Assurance Analyst
I0333 Submission Form (PDF)
R0333 Change Report (Consultation) (Approved) 04.08.26
R0333 Consolidated Consultation Responses V1.0 08.09.26
R0333 Change Report (Final Recommendation) (Post-Vote) 15.09.26
Company Name
Code Manager RPS
Review status
Review required
Use of REL Data by The Authority
Date of latest update
Type
Change
ID
R0330
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the July 2026 REC Release.
Summary
This Change Proposal allows The Authority to utilise REL data and its elements to match a UPRN to an MPAN. This is an electricity only Change Proposal.
Change Plan
Proposal Plan approved by Change Panel
Completed
Start:
Due:
Completion:
10 Jun 2026Final Recommendation approved at Change Panel
Completed
Start:
Due:
Completion:
21 Jul 2026Impacted REC Documents
Impacted REC Services
Status
Implementation Date
31 July 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0330 | Use of REL Data by The Authority |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0330 Proposed legal text changes v2.0
Upload document
R0330 - Legal Text for Consultation v2.0.zip
Archive
Off
Document title
R0330 Legal Text for Final Recommendation
Upload document
R0330 Legal Text for Final Recommendation.zip
Archive
Off
Problem Statement
The REC currently limits the use of Retail Energy Location (REL) data to Switching purposes only. This limits the Authority’s ability to match a UPRN to an MPAN in support of the government’s Bill Discount Scheme.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0330 submission form
R0330 Change Report (Proposal Plan and Consultation) v1.0 Approved
R0330 Consolidated Consultation Responses v1.0
R0330 Change Report (Final Recommendation) v1.0 Approved 21.07.26
Company Name
RECCo
Review status
Review required
A review of the Misdirected Payments and Debt Assignment Processes
Date of latest update
Type
Issue
ID
I0329
Change Category
Change Path
Priority
Urgent
No
Latest Update
04/08/2026 - On 04 August 2026, the REC Change Panel approved this Proposal Plan.
Summary
This Issue seeks to assess and identify any gaps, inconsistencies or process improvements opportunities for the Misdirected Payments and Debt Assignment processes.
Status
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0329 Submission Form
I0329 Change Report (Proposal Plan) V1.1 Approved
Company Name
REC Code Manager
Review status
Review required
Post-MHHS Full Transition Complete (M15) REC updates
Date of latest update
Type
Change
ID
R0325
Change Category
Change Path
Priority
Urgent
No
Latest Update
29/09/2026 - A Change Report (Update to Plan) has been published for review at the Change Panel on 06 October 2026, any comments on this plan must be received by 23:59 05 October 2026.
Summary
The REC was updated, primarily through R0209 and R0241, to add requirements that support the transition to, and enduring operation of the MHHS arrangements. As part of the transition, each impacted Metering Point will be migrated using processes defined in Codes, including the REC. Once this migration activity is complete, the legacy and transitional arrangements will become redundant and should be removed from the REC to support its efficient operation
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
Retention of redundant obligations within the REC would make it more complex to navigate for Market Participants and could cause confusion on the obligations that are in effect to support the efficient operation of the Great British Energy retail market. It is also worth noting that until Ofgem formally closes the MHHS Significant Code Review (SCR), this REC Issue could potentially impact that SCR.
Stages Selection
Stages Selection
Workgroup
Workgroup(s)
I0325 submission form
I0325 Scope list
I0325 Schedules CHIG 03092026.zip
I0325 Schedules CHIG 01102026.zip
I0325 Schedule1 CHIG 05112026.pdf
I0325_Change Report (Update to Plan) v1.0
R0325 Legal drafting
Company Name
RECCO
Review status
Reviewed - Accepted
Tariff Interoperability Phase 1a – Supplier Performance Assurance Requirements
Date of latest update
Type
Change
ID
R0323
Change Category
Change Path
Priority
Urgent
No
Latest Update
On 27 October 2026, the REC Performance Assurance Board, in line with the Code Manager recommendation Approved R0323
Summary
Obligations are being introduced into the REC to require Suppliers to make Tariff Pricing Data available to Tariff Interoperability Users (TI Users) using a new Tariff Interoperability Application Programming Interface (TI API). This proposal will provide Code Manager with data to assure supplier performance against obligations in a new REC Schedule: Tariff Interoperability Arrangements.
Impacted REC Parties and Market Participants
Status
Implementation Date
18 February 2027
| Included changes | Affected REC Items | |
|---|---|---|
| R0323 | Tariff Interoperability Phase 1a – Supplier Performance Assurance Requirements |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
This proposal will provide the Code Manager with data to assure Supplier performance against obligations in a new REC Schedule: Tariff Interoperability Arrangements. If Suppliers do not meet their Tariff Interoperability obligations, this could lead to Consumers’ Energy supply not being optimised, meaning that Consumers may incur higher charges. If price signals are not responded to through optimisation, this may also have other impacts such as reduced Net Zero benefits and reduced response to capacity constraints.
Stages Selection
Workgroup
Workgroup(s)
I0323 submission form
I0323 - REC Prioritisation Matrix
I0323 Change Report (Proposal Plan) Approved
R0323 Legal Drafting
I0323 Party IA Request
I0323 Consolidated Party IA Responses NON-CONFIDENTIAL
R0323 Change Report (For Consultation)
R0323 Consolidated Non-Confidential Consultation Responses
R0323 Change Proposal Re-Plan v1.0 Approved 29.09.26
R0323 Legal drafting - Final
R0323 Change Report (Final Recommendation) V1.1 Approved
Company Name
RECCo
Review status
Review required
Introduction of Consumer Consent Service
Date of latest update
Type
Change
ID
R0318
Date of next activity
Change Category
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
18/11/2026 - The Issue was progressed to Change Proposal on 17 November 2026. Following industry consultation on the REC drafting a number of refinements to the CCS design and drafting are being made. On progression to Change Proposal and Modification, the title has been updated to Introduction of Consumer Consent Service (not Solution) to reflect the new service that will be introduced.
Summary
This initiative will support the transformation of how energy is managed and consumed by giving consumers control over their energy (gas, electricity, heat, or other) data, enabling innovation through third-party services, and advancing sustainability goals. This REC Issue is being raised to promote visibility and awareness of opportunities for engagement, in advance of the CCS Change Proposal being progressed.
Change Plan
Proposal Plan (Approved)
Completed
Start:
02 Apr 2026Due:
02 Apr 2026Completion:
02 Apr 2026Update to Plan (Approved)
Completed
Start:
30 Sep 2026Due:
30 Sep 2026Completion:
30 Sep 2026Definition
Completed
Start:
02 Apr 2026Due:
17 Nov 2026Completion:
17 Nov 2026Business Case Assessment
In Progress
Start:
18 Nov 2026Due:
18 Dec 2026Completion:
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
RECCo | Consumer Consent Programme page
Archive
Off
Document title
Consumer Consent Hub - REC Portal
Archive
Off
Document title
Consumer Consent Solution Design Consultation (March 2026)
Archive
Off
Document title
RECCo's response to the CCS Design Consultation - 28 May 2026
Archive
Off
Problem Statement
A new set of arrangements for a Consumer Consent Solution (CCS) is currently being developed under the RECCo CCS project. The new arrangements will need to be implemented within the REC so that they can be governed under the REC on an enduring basis.
Stages Selection
Stages Selection
Workgroup
Workgroup(s)
I0318 submission form
RECCHIG_26_0305 - I0318 Consumer Consent Solution
I0318 Change Proposal Re-Plan v2.0 APPROVED 30.09.2026.
I0318 Change Report (Proposal Plan) v1.0 APPROVED 02.04.2026
Company Name
Retail Energy Code Company Ltd
Review status
Review required
Clarification of Data Items within the Payment Method Levelisation Supplier Data Reporting Specification
Date of latest update
Type
Change
ID
R0316
Change Category
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
The definition of certain data items within the PML schedule is currently ambiguous and open to misinterpretation by Suppliers, which may result in inconsistent data submissions and a consequential variation in the allocation of scheme debits and credits.
Change Plan
Proposal Plan approved at Change Panel
Completed
Start:
Due:
Completion:
03 Mar 2026Final Recommendation approved at Change Panel
Completed
Start:
Due:
Completion:
06 Apr 2026Impacted REC Parties and Market Participants
Status
Implementation Date
26 June 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0316 Legal Text For Consultation
Upload document
REC Schedule 1 - For Consultation v1.1.zip
Archive
Off
Document title
CODE_YYYYMM[_x]
Upload document
Submission template.csv
Archive
Off
Problem Statement
There is a lack of clarity in REC Schedule 31 – Payment Method Levelisation Reconciliation around the definition of Primary Meter Points, which has led to inconsistent data submission and consequential variation in the allocation of PML scheme debits and credits.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0316 submission form
R0316 Guidance for Suppliers
R0316 Change Report (Proposal Plan and Consultation)
R0316 Consolidated Consultation Responses V1.0 (26.03.2026)
R0316 Change Report (Final Recommendation) v1.0 Approved 07.04.2026
R0316 Authority Decision
Company Name
RECCo
Review status
Review required
Amendments to D0312 to align with BSC CP1622
Date of latest update
Type
Change
ID
R0300
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
Elexon have raised CP1622 to amend the Validation rules within the Supplier Meter Registration Service (SMRS) for the Number of Register Digits Data Item within the IF-005 Market Message, to allow digit values from 1–9, ensuring accurate data and reducing exceptions. There are no Validation rules related to the D0312 Market Message which need to be amended under the Balancing and Settlement Code (BSC), but the D0312 itself contains a Data Item Rule regarding the Number of Displayed Register Digits which needs to be amended in line with CP1622.
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
26 June 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Amendments to D0312 red-lined data spec V0.1
Upload document
Amendments to D0312 red-lined data spec.docx
Archive
Off
Document title
Amendments to D0312 red-lined data spec V0.2
Upload document
Amendments to D0312 red-lined data spec V0.2.docx
Archive
Off
Document title
20260205 CP1622 R0300 industry workshop slides
Upload document
20260205 CP1622 R0300 industry workshop slides (1).pdf
Archive
Off
Problem Statement
BSC CP1622 is looking to address that SMRS cannot accurately update the Number of Displayed Register Digits for a SMETS2 Smart Electricity Meter due to Validation rules currently in place. The Validation rules proposed to be amended are those on the IF-005, which has direct impacts to the D0312.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0300 submission form
R0300 Change Report (Proposal Plan) V1.0
R0300 Consolidated Impact Assessment Responses PUBLIC v1.0
R0300 Update to Plan V1.0 approved 19.03.26
R0300 Change Report (For Consultation) V1.1
R0300 Consolidated Consultation Responses V1.0
R0300 Change Report (Final Recommendation) V1.0 approved 29.04.26
Company Name
Code Manager/CCSG
Review status
Review required
Registration Id Required for MHHS Appointments
Date of latest update
Type
Issue
ID
I0296
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
12/05/2026 - The Code Manager have developed a solution which has been live since 05 May 2026. More detail can be found on the REC Portal Wiki. A Closure Report has now been published, and this Issue has now been classed as resolved.
Summary
The RegistrationId (DI90043 / DI849) is required by SMRS to be included in the IF-031 'Supplier Agent Appointment Request' Market Message to allow the SMRA to process the appointment request. However not all Suppliers hold the RegistrationId for all Meter Points, in particular those that have not undergone a Registration managed by the Central Switching Service (CSS)
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- As part of the solution for REC Issue I0296 - Registration Id Required for MHHS Appointments the REC Code Manager have developed a process to provide Energy Suppliers the Registration Id for Metering Points that have not been through a Central Switching Service (CSS) Registration Managed Switch. This is to allow Energy Suppliers that may not hold the Registration Id for these Metering Points to populate the Market-wide Half Hourly Settlement (MHHS) Agent Appointment Messages required to initiate a MHHS Migration.
- More detail of the solution can be found: https://portal.retailenergycode.co.uk/knowledge-centre/rec-wiki/market-wide-half-hourly-settlement/provision-registration-id-required?utm_source=emailoctopus&utm_medium=email&utm_campaign=Weekly%20Bulletin%20-%202026-05-01
Proposed Solution Document
Document title
I0296 Closure Report_v1.0 (12 May 2026)
Upload document
I0296_Closure report_v1.0.pdf
Archive
Off
Problem Statement
Not all Energy Suppliers hold the RegistrationId for all Meter Points, particularly those Meter Points that have not gone through a Switch, i.e. have not undergone a Registration managed by the CSS. The RegistrationId is currently only available where a Metering Point has been through a CSS managed Registration. Without the RegistrationId available to Energy Suppliers, not all Metering Points will be able to migrate putting the MHHS Migration and Milestone M15 at risk.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Workgroup
Workgroup(s)
I0296 submission form
Company Name
RECCo
Review status
Review required