Gas Pressure and Capacity Information Transparency
Date of latest update
Type
Issue
ID
I0274
Change Category
Change Path
Priority
Urgent
No
Latest Update
21/07/2026 - Change Report (Proposal Re-Plan) approved at Change Panel
Summary
As per Section 13.4.18 of CoMCoP, retrieving gas pressure and capacity information from Transporters via the GT1 process can be time consuming for Energy Suppliers/MAMs and/or Consumers. The process of retrieving this information is inconsistent and service timescales are varied between transporters. Gas pressure and capacity information should be readily available through the Gas Enquiry Service to enable timely processing of site work and requests to enable MAM’s and Suppliers to appropriately service their customers.
Change Plan
Change Report (Proposal Plan) approved at Change Panel
Completed
Start:
Due:
Completion:
18 Nov 2025Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
For some Energy Suppliers, MAMs and consumers, retrieving pressure and capacity information via the GT1 process can be time consuming. This is due to elements like response timescales and methods (batch responses vs individual responses) being varied among GTs. This ultimately has a negative impact on customers waiting on site work, such as a new connection, for example.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0274 submission form
I0274 Change Report (Proposal Plan) V1.0 approved 18.11.25
IG174 Change Proposal Re-Plan v2.0 approved 21.07.2026
Company Name
OVO Energy
Review status
Review required
Sharing of SSC and TPR Information for MHHS Smart and Advanced Meters
Date of latest update
Type
Issue
ID
I0273
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/10/2026 On 05 October 2026, the MEP voted via an ex-committee vote to approve this extension to plan. The Code Manager is currently engaging with the BSC to raise a consequential change to facilitate the use of the SSC for non-Settlement purposes, for example Billing or quoting tariffs for Smart Metering Assets.
Summary
In the MHHS design the Standard Settlement Configuration (SSC) is a non-mandatory data item for Smart and Advanced metering points, in addition the register level TPR information is not shared in the MTD flows for these meters (IF-006 for Smart and D0268 for Advanced). It was identified through BSC Issue I118 that there is a requirement for the SSC to be set for Domestic / Microbusiness Advanced Metering Points making use of the HH data opt out and there may be other areas where the SSC is required.
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0273 - Interim Guidance Document V1.1
Upload document
I0273 - Interim Guidance Document V1.1.pdf
Archive
Off
Problem Statement
The MHHS design does not mandate the use of SSC or support register-level TPR data for Smart and Advanced Meters, creating gaps in data availability for certain Settlement scenarios.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0273 Submission Form
I0273 - Update to Plan V2.0 (Pre-Approval) 06.05.2026
I0273 - Update to Plan V2.0 Approved 05.10.2026
Company Name
RECCo
Review status
Review required
Consequential Cross-Code Change for BSC P441 - Complex Site Classes Creation
Date of latest update
Type
Change
ID
R0268
Change Category
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
15/10/2026 On 14 October 2026, REC Metering Expert Panel voted to recommend that the Authority approve this Change Proposal, in line with the Code Manager recommendation. The Change Report (Final Recommendation) V2.0 has been issued to the Authority.
Summary
The Balancing and Settlement Code (BSC) modification P441 is looking to introduce Complex Site classes which would categorise the types of Complex Site with each having clearly defined criteria within the BSC whilst also facilitating a new "type" of Complex Site (referred to as a Class 6 Complex Site) to allow approval of "non-standard" Complex Sites. It will also clarify when the netting of Imports from Exports for multiple Metering Systems registered in Supplier Volume Allocation (SVA) is permitted.
Change Plan
Change Report (Proposal Plan) approved by Change Panel
Completed
Start:
Due:
Completion:
21 Oct 2025Extension to Plan approved by MEP
Completed
Start:
Due:
Completion:
14 Jan 2026Final Recommendation approved at MEP
Completed
Start:
Due:
Completion:
11 Mar 2026Final Recommendation V2.0 approved at MEP
Completed
Start:
Due:
Completion:
14 Oct 2026Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
06 November 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0180 | Clarity on use of on hold for switching issues, including the obligations of CSS Users |
|
| R0207 | Import / Export MOA Charging Clarification |
|
| R0253 | Theft - DNO/Networks not providing photos |
|
| R0261 | Addition of Export flag in D0303 flows | |
| R0266 | REC Data Specification Clarifications |
|
| R0317 | Number of Displayed Register Digits Data Item linkage | |
| R0328 | Removal of D0383 & D0384 requirements from Sharing MTDs process |
|
| R0336 | Legal text to support REC Change R0180 |
|
| R0343 | MSC - Amending Statement Production Timescales | |
| R0345 | Housekeeping November 2026 |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 11 Nov 2026 | ||
| 1.0 | 11 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0268 Metering Operations v0.1 draft
Upload document
R0268 Metering Operations v0.1 draft.zip
Archive
Off
Problem Statement
The introduction of new Complex Site classes is needed into the REC to facilitate the solutions under BSC P441 and DCP 424.
Stages Selection
I0268 Submission Form
I0268 Change Report (Proposal Plan) V1.1 approved 21.10.25
R0268 Change Report (For Consultation) V1.0
R0268 Consolidated Consultation responses V1.0
R0268 Extension to Plan V1.0
R0268 Change Report Final Recommendation V1.0 post vote
R0268 Authority send back letter on implementation date
R0268 Implementation Date Consultation - Consolidated Consultation Responses V1.0
R0268 Change Report (Final Recommendation) V2.0 Approved 15.10.26
Company Name
REC Code Manager
Review status
Review required
Theft Calculator Usage and Suitability Assessment
Date of latest update
Type
Issue
ID
I0265
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/10/2026 - A Closure Report has now been published, and this Issue has now been classed as resolved. A final working group will be hosted on 18 November to inform Parties of the solution requirements developed and the next steps planned for the Theft Assessment Calculator.
Summary
Currently, it is uncertain how widely the existing Theft Assessment Calculators are being used by Parties for assessing energy losses due to theft, despite Schedules 7 & 8 mandating the usage. There is evidence to suggest inconsistent application across Parties, and whilst there has only been one derogation request, anecdotal feedback indicates that other Parties are also struggling to use the calculator.
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- It is expected that there will be a collaborative information gathering exercise to thoroughly assess the current Theft Calculator. This includes collecting data on specific use cases, frequency of use, and devices (such as laptops or mobile devices), evaluating whether its current functionalities align with industry needs for assessing energy theft and TDIS submissions, and reviewing the suitability of its current platform to identify preferred future delivery mechanisms (e.g. web or app-based). This approach aims to inform potential enhancements or a comprehensive upgrade, ensuring a consistent and reliable tool that can be accessed and used effectively across multiple operational scenarios and devices for the benefit of all Parties.
Problem Statement
The current lack of clarity around the usage, effectiveness, and suitability of the energy theft calculator is leading to inconsistent assessments and reporting across the industry. This ambiguity hinders the identification and sharing of best practices, creates an uneven playing field among Parties, and may result in inconsistent outcomes for consumers. Additionally, it limits the tool’s potential to support robust, court-ready evidence ahead of the Energy Theft Unit (ETU) and Referral Assessment Service (RAS) launch. A lack of transparency may also discourage Parties from raising concerns, further impeding improvement and compliance.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0265 submission form
I0265_ Change Report (Extension to Plan) V1.0
I0265 Consolidated Information Request Network Responses PUBLIC
I0265 - Issue Closure Report
Company Name
RECCo
Review status
Review required
Additional Registration Data (Gas) under Smart Energy Code
Date of latest update
Type
Issue
ID
I0262
Change Category
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
30/09/2026 - Change Report Re-Plan V5.0 approved by Change Panel.
Summary
Gas Transporters (GTs) only have a single obligation in the Smart Energy Code (SEC). This obligation relates to the provision of Registration Data to the DCC. This issue is exploring whether these obligations may be transferred to the REC.
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
Gas Transporters have very few obligations under the Smart Energy Code; those that they do have relate to provision of data owned by the REC. If these obligations were to be moved from the SEC to the REC, then the regulatory burden on GTs may be reduced as they would be able to completely secede from the SEC.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Change Proposal Submission form
I0262 Change Report (Plan) (Approved) V5.0 19.06.26
I0262 Change Report Re-Plan V4.0 19.06
I0262 Change Report Re-Plan V5.0 Approved 30.09.2026
Company Name
Northern Gas Networks Ltd
Review status
Review required
Addition of the SOQ information for TPIs
Date of latest update
Type
Issue
ID
I0260
Priority
Urgent
No
Latest Update
28/07/2026 - update to plan published for decision at the Change Panel on 4 August 2026.
Summary
As TPIs we are employed by our customers to check that the charges are being applied correctly. One of the big issues year after year is when the SOQ changes for a supply prior to the next supply contract renewal. As you are hopefully aware, the standing charges for Gas supplies are primarily built up around the Transportation charges. And one of the main component parts in the calculation of the standing charge is the SOQ. When we are asked to :- a) Validate the standing charge on any new offer, we are reliant on the supplier simply getting the SOQ correct. We need to see the SOQ so that we can work out what the standing charge should be. - then we challenge the supplier before they get the charges wrong. b) Our customers also want us to forecast the rates/costs for the coming year. This is impossible without access to the SOQ.
Status
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Issue Proposal form
I0260 Change Proposal Plan - On Hold.pdf
Company Name
Sustainable Energy First
Review status
Review required
Update to R0173 Implementation Date
Date of latest update
Type
Change
ID
R0259
Change Path
Priority
Urgent
No
Latest Update
15/07/2025 - In line with Code Manager recommendation, the Change Panel approved R0259. The appeal window has closed.
Summary
On 2 May 2025, the Authority approved R0173 Improvements to the Theft Detection Incentive Scheme. The decision document is published on the REC Portal. The initial implementation date proposed under the Change Report was 1 April 2025. The published Authority decision does not include an indication for when the approved solution should be implemented.
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Stages Selection
SME
SME Role
Lead Assurance Analyst
SME User
awaghorn@deloitte.co.uk
R0259 - Update to R0173 Implementation Date
R0259 Change Report (Proposal Plan) Approved 17.06.2025
R0259 Change Report (Consultation)
R0259 Change Report (Final Recommendation) Post-vote 15.07.2025
Company Name
REC Code Manager
Review status
Review required
Increasing frequency of Annual portfolio reconciliation exercise to support Data Cleanse
Consultation
Date of latest update
Type
Change
ID
R0252
Change Category
Change Path
Priority
Urgent
No
Latest Update
11/11/2026 - Consultation published with a closure date of 25/11/2026, following the approval of the Change Report (Consultation) by the REC Metering Expert Panel.
Summary
This Issue seeks to explore making changes to both the frequency and turnaround time of the annual portfolio reconciliation exercise conducted by the CDSP.
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0252 Legal Drafting V2.0
Upload document
R0252 Proposed Solution.zip
Archive
Off
Document title
R0252 Proposed Solution V3.0
Upload document
R0252 Proposed Solution V3.0.zip
Archive
Off
Problem Statement
The annual portfolio reconciliation exercise conducted by the CDSP on MAM-held Data Items is neither frequent enough nor is it expeditious enough, according to the Proposer. MAMs are being asked to reconcile Data Items several months after they were initially provided, which may impact the efficacy of the exercise if these Data Items have changes since they were initially submitted.
Stages Selection
SME
SME Role
Lead Assurance Analyst
Workgroup
Workgroup(s)
R0252 - Issue Proposal V1.0
R0252 - Change Report (Plan) (Approved) V3.0 04.02.26
R0252 - Change Report (IA) V1.0 12.02.26
R0252 Consolidated Party IA Responses V1.0
R0252 Change Proposal Re-Plan (Approved) V1.0 21.10.25
R0252 Change Proposal Re-Plan (Approved) V2.0 27.01
R0252 Change Proposal Re-Plan (Approved) V3.0
R0252 Change Proposal Re-Plan (Approved) V4.0
R0252 Change Proposal Re-Plan V5.0 (Approved) 02.09.26
Company Name
RIG Chair
Review status
Review required
Amendment to the Business Case for R0044
Date of latest update
Type
Change
ID
R0251
Change Path
Priority
Urgent
No
Latest Update
On 19 August 2025, in line with the Code Manager Recommendation, the Change Panel voted to approve the updated Business Case for R0044 MHHS Programme Changes required to Central Switching Service.
Summary
During MHHS System Integration Testing (SIT), additional requirements for the R0044 solution have been identified by the CSS provider, which means the business case for R0044 is no longer accurate. This Change Proposal will update the business case to include the additional costs.
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
The business case that was consulted on and approved as part of R0044 MHHS Programme Changes required to Central Switching Service is not accurate.
Stages Selection
Workgroup
Workgroup(s)
Change Proposal form
R0251 Change Report (Final Recommendation) Approved
R0251 Consolidated consultation responses
Company Name
-
Review status
Review required
Effective Dates in EES
Date of latest update
Type
Issue
ID
I0247
Urgent
No
Latest Update
12/08/2026 - the Proposer has chosen to withdraw this Issue as MHHS means many of the effective dates are being updated as per the original business case so the change is no longer required.
Summary
On a switch many of the effective dates within EES default to the switch date. This includes energisation status. It means EES users that don't have access to the meter technical details do not know the actual date the status changed.
Status
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
Stages Selection
Proposal Form
Company Name
Gemserv
Review status
Review required