Schedule 23 - Registration Services 2.1
– Implemented on
Market Participant Applicability
| Market participant | All Sections |
|---|---|
| Domestic Suppliers | Mandatory |
| Non-Domestic Suppliers | Mandatory |
| Gas Transporters | Mandatory |
| Distribution Network Operators | Mandatory |
| DCC | Mandatory |
| Metering Equipment Managers | N/A |
| Non-Party REC Service Users | N/A |
Loading...
Schedule 23 - Registration Services 2.0
– Implemented on
Loading...
Schedule 23 - Registration Services 1.4
– Implemented on
Market Participant Applicability
| Market participant | All Sections |
|---|---|
| Domestic Suppliers | Mandatory |
| Non-Domestic Suppliers | Mandatory |
| Gas Transporters | Mandatory |
| Distribution Network Operators | Mandatory |
| DCC | Mandatory |
| Metering Equipment Managers | N/A |
| Non-Party REC Service Users | N/A |
Loading...
Additional Registration Data (Gas) under Smart Energy Code
Date of latest update
Type
Issue
ID
I0262
Change Category
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
30/09/2026 - Change Report Re-Plan V5.0 approved by Change Panel.
Summary
Gas Transporters (GTs) only have a single obligation in the Smart Energy Code (SEC). This obligation relates to the provision of Registration Data to the DCC. This issue is exploring whether these obligations may be transferred to the REC.
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
Gas Transporters have very few obligations under the Smart Energy Code; those that they do have relate to provision of data owned by the REC. If these obligations were to be moved from the SEC to the REC, then the regulatory burden on GTs may be reduced as they would be able to completely secede from the SEC.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Change Proposal Submission form
I0262 Change Report (Plan) (Approved) V5.0 19.06.26
I0262 Change Report Re-Plan V4.0 19.06
I0262 Change Report Re-Plan V5.0 Approved 30.09.2026
Company Name
Northern Gas Networks Ltd
Review status
Review required
Schedule 23 - Registration Services 1.3
– Implemented on
Market Participant Applicability
| Market participant | All Sections |
|---|---|
| Domestic Suppliers | Mandatory |
| Non-Domestic Suppliers | Mandatory |
| Gas Transporters | Mandatory |
| Distribution Network Operators | Mandatory |
| DCC | Mandatory |
| Metering Equipment Managers | N/A |
| Non-Party REC Service Users | N/A |
Loading...
Effective Dates in EES
Date of latest update
Type
Issue
ID
I0247
Urgent
No
Latest Update
12/08/2026 - the Proposer has chosen to withdraw this Issue as MHHS means many of the effective dates are being updated as per the original business case so the change is no longer required.
Summary
On a switch many of the effective dates within EES default to the switch date. This includes energisation status. It means EES users that don't have access to the meter technical details do not know the actual date the status changed.
Status
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
Stages Selection
Proposal Form
Company Name
Gemserv
Review status
Review required
Schedule 23 - Registration Services 1.2
– Implemented on
Loading...
Stranded RMPs in Defunct Suppliers
Date of latest update
Type
Issue
ID
I0219
Change Path
Priority
Urgent
No
Latest Update
27/02/2025 - Change is now not being merged into any other changes and will proceed as a standalone change. A potential solution has been identified, but will be discussed for potential cross code impacts
Summary
Currently within Schedule 23 a Registration can only be undertaken on RMPs with an Operational or Dormant RMP Status, and not Terminated. Terminated is a status that the RMP is set to when the Meter Point Status is no longer operational or the site is isolated. It is right that these sites are not able to be Registered as there is a risk that Suppliers could inadvertently Register such Meter Points. We do have instances where such sites are stranded in defunct Supplier portfolios - and the Supplier no longer has the capability to take the relevant action to Deactivate the Registrations. This may because the operational staff have left and the business is in administration.
Change Plan
Discussed at Technical Change Workshop
Completed
Start:
Due:
Completion:
25 Feb 2025Impacted Consumers
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
Issue Proposal Form
Company Name
Xoserve
Review status
Review required
Multiple Switch Requests Increasing Objection Rate
Date of latest update
Type
Issue
ID
I0214
Change Category
Change Path
Priority
Urgent
No
Latest Update
20/05/2025 - the Code Manager has withdrawn this Issue, as there are no adequate solution options and minimal Consumer detriment. The adoption window has closed.
Summary
REC Parties have told the Code Manager that they are seeing multiple registrations attempts (10 plus attempts on consecutive days in some instances) on individual MPxNs. They are concerned about Consumer detriment as those trying to switch are not getting time to review objection related communications from their current Supplier to allow them to act and resolve the issue. This was initially presented as a non-domestic issue, but initial Code Manager investigations have also highlighted potential concern around proposed domestic transfers as well. There is also a risk of Party Performance impacts with initial analysis flagging potential impacts on Performance Assurance Risk Drivers, 8.9, 8.10 & 8.11.
Change Plan
Presented at Change Issues Group
Completed
Start:
Due:
Completion:
06 Mar 2025Impacted Consumers
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
Non-Domestic Consumers are having their Switch experience affected by multiple Objection attempts following a single initial attempt to register for their supply by a prospective gaining Supplier. This results in Consumer detriment, as multiple Objections result in repeated rounds of communications to the Supplier. This results from automated Registration systems employed by Non-Domestic Suppliers.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Change Issue Proposal Form
I0214 Change Report (Plan) (Approved) V1.0 17.12.24
I0214 Rebaselined Plan v1.0 Approved 28.03.25
Company Name
Code Manager
Review status
Review required
Related Meter Point RMP status rules
Date of latest update
Type
Change
ID
R0190
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
The drafting in Schedule 28 – Related Metering Points has been updated for Market-wide Half Hourly Settlement (MHHS), allowing related Metering Points to be in a Status of Operational or Created in MPRS, as long as all Related Metering Points are in the same Status. This Change Proposal suggests allowing Secondary Metering Points with a Status of Created to be linked to Primary Metering Points with a Status of Operational, for MHHS migrated Metering Points only.
Change Plan
Presented at Change Issues Group
Completed
Start:
Due:
Completion:
07 Aug 2025Proposal Plan approved by Change Panel
Completed
Start:
Due:
Completion:
19 Aug 2025Change Report (For Consultation) approved by Change Panel
Completed
Start:
Due:
Completion:
18 Nov 2025Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
27 February 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0179 | Proposal for Limiting Queries in EES API Calls (Single Query per API Call) | |
| R0190 | Related Meter Point RMP status rules |
|
| R0198 | Metering Asset Manager (MAM) Communication Method Register | |
| R0242 | Missing Scenario Variant from R0043 |
|
| R0244 | C21 to be introduced into STIRG Document |
|
| R0235A | Missing Scenario Variants in D0179 Alternate Solution | |
| R0256 | MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101 |
|
| R0270 | Clarification of SIP Qualification Requirements |
|
| R0271 | Clarification of ASP, AMI, and EMO Accession Requirements |
|
| R0272 | Enabling transparency of the CRS Provider’s REC service level performance |
|
| R0277 | Data Latency SLA Alignment for Gas Enquiry Service |
|
| R0280 | CSS Certificate Authority audit clarification |
|
| R0283 | Annual Address Management Plan Updates |
|
| R0287 | Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations |
|
| R0293 | Housekeeping February 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0190 - Draft Schedule 28 changes for IA
Upload document
I0190 - Draft Schedule 28 changes V0.2.docx
Archive
Off
Problem Statement
By not allowing Primary Metering Points with a Status of Operational to be linked to Secondary Metering Points with a Status of Created, where the Metering Points have migrated into the MHHS arrangements, full advantage is not being taken of the MHHS functionality of automatically appointing agents to Secondary Metering Points.
Stages Selection
SME
SME Role
Lead Assurance Analyst
SME User
awaghorn@deloitte.co.uk
I0190 - Related Meter Point RMP status rules
I0190 Change Report (Proposal Plan) V1.0
I0190 Consolidated Information Request Responses v1.0
I0190 Consolidated Impact Assessment Responses v1.0
I0190 Extension to Plan V1.0 approved 30.10.25
R0190 Change Report (For Consultation) V1.0 approved 18.11.25
R0190 Consolidated Consultation Responses v1.0
R0190 Change Report (Final Recommendation) V1.0 post vote
Company Name
Code Body/ Administrator
Review status
Review required