Non dual-fuel Gas PSR Consumer
Date of latest update
Type
Issue
ID
I0186
Change Category
Change Path
Priority
Urgent
No
Latest Update
02/09/2025 - the Change Panel approved placing this Issue on hold while the proposer progresses a sandbox trial
Summary
Non dual-fuel Consumers who register upon the PSR, will have their PSR data flow across energy industry data flows to mean that all parties are aware of any PSR Needs Codes, allowing us all to provide equal access to our services and support. This will be achieved via the utilisation of existing processes and systems. Initially a pilot will take place for a minimum of 3 months between participating companies before extending this to the whole industry”.
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
The majority of domestic customers in the UK are what are called in the industry ‘dual-fuel’ - this means that with two types of energy (electricity & gas) a domestic dwelling has a single supplier ie they pay their bill to one organisation. This ‘dual-fuel’ position has supported the industry improvements to Priority Services Register (PSR) data flows by allowing previous divides to be overstepped in terms of data flows between energy types. There is however a problem which this RECC request aims to resolve. That is, where a customer who has both fuel types, also has two suppliers and they want to register upon the PSR. This was always a ‘known’ gap shared with our regulator when the many improvements were implemented across the PSR and considered to be something that would be addressed at a later date. This ‘gap’ means that without the dual-fuel link, currently data flows do not complete across energy types via the supplier data flow triggers.
Stages Selection
Stages Selection
Change Proposal Form - Non dual-fuel Gas PSR Customer
I0186 - Change Report (Proposal Plan) V1.0 (Approved) 18.02.2025
Company Name
British Gas
Review status
Review required
DPI Extract from CSS
Date of latest update
Type
Change
ID
R0183
Change Category
Change Path
Priority
Urgent
No
Latest Update
11/03/2025 - The proposer has withdrawn the request due to the expected delivery of enquiry data in the same anticipated timescales & the continued pursuance of I0224. The adoption window has closed.
Summary
It has emerged that there are data quality issues relating to the Domestic Premises Indicator (DPI) Data Item, where MPxNs have been recorded as having the wrong DPI. This Change has been raised to identify a mechanism by which this issue can be resolved.
Change Plan
Solution Analysis and Development
In Progress
Start:
11 Jun 2024Due:
20 Sep 2024Completion:
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- C1 - As a Consumer, I want industry data relating to my energy supply to be accurate, so that I do not experience any issues when switching or engaging with other consumer facing industry practices.
- M1 - As a CSS User, I want available DPI data to be accurate, so that when I engage with industry processes that require DPI data, I am confident that I am engaging with the right information. M2 - As the CSS, I want to provide accurate data to CSS Users, so that I am able to facilitate successful industry operations for my Users.
Problem Statement
Inaccurate DPI data available within industry data sources can result in less accuracy within REC processes that utilise this data, and poorer consumer outcomes. DPI data accuracy needs to be improved to ensure that industry processes and Consumers are not impacted.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Change Proposal Form
R0183 Change Report V3.0 02.12.2024
Company Name
-
Review status
Review required
Catering for Registration Events where the Incumbent Supplier deactivates prior to a Switch becoming effective
Date of latest update
Type
Change
ID
R0153
Change Category
Change Path
Priority
Urgent
No
Latest Update
04/06/24 - This change has been withdrawn by the proposer and is being incorporated as part of R0178 - Improvements to CSS Business Process Logic. 03/05/2024 - An investigation was held into the requirements of this change and into other issues identified with the CSS Business Process and Logic. Landmark have provided data relating to the number of incidents for three different scenarios which had been identified. A discussion as held between the Code Manager, DCC and Landmark, and agreed that they will look to combine all identified issues into a new REC Change Proposal.
Summary
This change looks to resolve the issue for Registration Events where the incumbent Supplier deactivates prior to a Switch becoming effective. In some instances, the incumbent Supplier is withdrawing prior to the ‘Supply Effective from Date’ which causes the accepted Switch to fail at Gate Closure (17:00hrs) . An effective solution is to allow the consumer to Switch with the original effective date. There are a number of solution options to enable this to happen.
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Status
Implementation Status
Date Raised
Fuel
Solution Development
Problem Statement
In some instances, the incumbent Supplier is withdrawing prior to the ‘Supply Effective from Date’ which causes the accepted Switch to fail at Gate Closure (17:00hrs).
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
Catering for Registration of Events CP Form 24.11.2023
Company Name
Xoserve
Review status
Review required
Annulment Definition
Date of latest update
Type
Change
ID
R0119
Change Category
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
Annulments are defined in the interpretations schedule as: Annulled means that a Registration has been annulled by the Losing Supplier pursuant to an Annulment Request. “Annulment” and similar expressions shall be interpreted accordingly. Annulment Request means the Registration Service Request from the Losing Supplier to terminate the progress of a Registration in accordance with Paragraph 10 of the Registration Services Schedule. The Registration Services Schedule does not define an annulment but sets out in para 10: A Losing Supplier must only submit an Annulment Request in respect of a Registration where the Losing Supplier is permitted to do so in accordance with its Energy Supply Licence. Unfortunately the Energy Supply Licence does not refer to annulments, making this term not clearly defined. REC Performance Assurance (RPA) have identified Parties using annulments when they should use other processes. The lack of a clear definition of what an annulment is could be a contributing factor to this.
Change Plan
Preliminary Change Report and Consultation Issued
Completed
Start:
17 May 2023Due:
31 May 2024Completion:
31 May 2024Final Change Report Issued
Completed
Start:
31 May 2024Due:
05 Jul 2024Completion:
05 Jul 2024Responsible Committee Decision
Not Started
Start:
05 Jul 2024Due:
16 Jul 2024Completion:
Authority Determination Requested
Not Started
Start:
16 Jul 2024Due:
17 Jul 2024Completion:
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
08 November 2024
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Extract: Schedule 23 - Registration Services (R0119 Draft Legal Text) - Published at PCR 31.05.2024
Upload document
Registration Services - R0119 (Draft Legal Text).docx
Archive
Off
Document title
Schedule 23 - Registration Services (R0119 Draft Legal Text) - Published at PCR 31.05.2024
Upload document
Registration Services - R0119 (1).docx
Archive
Off
Document title
Schedule 1 - Interpretations and Definitions (R0119 Draft Legal Text) - Published at PCR 31.05.2024
Upload document
Schedule 1 - Interpretations and Definitions - R0119.docx
Archive
Off
Document title
Schedule 1 - Interpretations and Definitions - R0119 (updated draft amendments at FCR) 05.07.2024
Upload document
Schedule 1 - Interpretations and Definitions - R0119 (1).docx
Archive
Off
Document title
Schedule 23 - Registration Services - R0119 (updated draft amendments at FCR) 05.07.2024
Upload document
Registration Services - R0119 (2).docx
Archive
Off
Document title
Schedule 23 - Registration Services - R0119 (updated draft amendments at FCR) (Extract) 05.07.2024
Upload document
Registration Services - R0119 (Draft Legal Text post-Consultation).docx
Archive
Off
Document title
Schedule 1 - Interpretations and Definitions - R0119 (Recommended for Authority Approval) 16.07.2024
Upload document
Schedule 1 - Interpretations and Definitions - R0119 (Recommended for Authority Approval) 16.07.2024.docx
Archive
Off
Document title
Schedule 23 - Registration Services - R0119 (Recommended for Authority approval) 16.07.2024
Upload document
Registration Services - R0119 (Recommended for Authority approval) 16.07.2024.docx
Archive
Off
Document title
Schedule 23 - Registration Services - R0119 (Recommended for Authority approval) (Extract) 16.07.2024.docx
Upload document
Registration Services - R0119 (Recommended for Authority approval) (Extract) 16.07.2024.docx
Archive
Off
Problem Statement
Parties are using annulments when they should use other processes, in particular the objection process. The lack of a clear definition of what an annulment is could be a contributing factor to this.
Stages Selection
SME
SME Role
Lead Assurance Analyst
R0119 - Change Proposal Form 17.05.2023
R0119 - Change Proposal Plan V1.0 (Approved)
R0119 - Initial Assessment Report V1.0 (Approved)
R0119 - Preliminary Change Report V1.0 (Published for Consultation) 31.05.2024
R0119 - Consolidated Consultation Responses V1.0 (25.06.2024)
R0119 - Final Change Report V2.0 (Post-Vote) 16.07.2024
R0119 - Authority Decision (10.09.2024)
Company Name
REC Code Manager
Review status
Review required
Schedule 23 - Registration Services 1.1
– Implemented on
Loading...
Schedule 23 - Registration Services 1.0
– Implemented on
Market Participant Applicability
| Market participant | All Sections |
|---|---|
| Domestic Suppliers | Mandatory |
| Non-Domestic Suppliers | Mandatory |
| Gas Transporters | Mandatory |
| Distribution Network Operators | Mandatory |
| DCC | Mandatory |
| Metering Equipment Managers | N/A |
| Non-Party REC Service Users | N/A |
Loading...
Switch Request Objections (Change of Occupier)
Date of latest update
Type
Change
ID
R0051
Change Category
Change Path
Priority
Urgent
No
Latest Update
26/01/2024 - Withdrawn following adoption window closure.
Summary
This Change Proposal looks to clarity obligations regarding the losing suppliers' rights to object and the circumstances surrounding registrations by gaining suppliers, following the migration from the MRA to the REC.
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Stages Selection
R0051 - Downloadable CP form
Company Name
Business Energy Direct
Review status
Review required
REC V3.0
Date of latest update
Type
Change
ID
R0041
Change Category
Urgent
Yes
Latest Update
-
Summary
-
Change Plan
Legal text baselined
Completed
Start:
10 Apr 2022Due:
13 May 2022Completion:
13 May 2022Final Change Report Issued
Completed
Start:
13 May 2022Due:
20 May 2022Completion:
20 May 2022Responsible Committee Decision
Completed
Start:
20 May 2022Due:
07 Jun 2022Completion:
07 Jun 2022Authority Determination (Original)
Completed
Start:
07 Jun 2022Due:
20 Jun 2022Completion:
17 Jun 2022Authority Determination (revoked and re-issued)
Completed
Start:
20 Jun 2022Due:
29 Jun 2022Completion:
29 Jun 2022Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
18 July 2022
| Included changes | Affected REC Items | |
|---|---|---|
| R0038 | Performance Assurance Report Catalogue Changes as a consequence of REC V3.0 | |
| R0041 | REC V3.0 |
|
| R0042 | Performance Assurance Board Terms of Reference |
|
| R0045 | Changes to SDEP Messages and Schedule numbering for REC V3.0 |
|
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 16 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
- As a Consumer, I want to be able to successfully switch my Energy Supplier with minimal delay or hassle, so that I can start to receive the service and tariff from my chosen Energy Supplier at the earliest opportunity.
- As the Authority, I want the necessary changes made to the Retail Energy Code to introduce the obligations, processes and provisions for the new switching arrangements, to enable the successful transition to enduring governance and operational arrangements.
- As a REC Party, I want to be clear on the obligations I need to meet and the processes I need to follow post CSS go live, to ensure my organisation is ready for the introduction of the new switching arrangements.
- As a REC Service Provider, I want to be clear on the obligations, processes and service standards that I need to meet, to ensure my organisation is ready for the introduction of the new switching arrangements.
Proposed Solution Document
Document title
REC V3.0 Baselined documents
Upload document
R0041 Legal Text.zip
Archive
Off
Document title
REC v3.0 Baselined documents (REC Portal)
Archive
Off
Problem Statement
Changes are required to the REC, to ensure the appropriate obligations, processes and provisions are defined within the REC at CSS go-live, enabling successful transition to enduring governance and operational arrangements developed as part of Ofgem’s Switching Programme.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0041 - Change Proposal Form
Letter from the Authority to the REC Code Manager - REC V3.0 Authority Change Proposal
R0041 - Change Proposal Plan v1.0 (Approved)
R0041 - Initial Assessment Report v2.0 (Approved)
R0041 - Final Change Report v3.0 (Post-Vote)
R0041 Authority Decision
Company Name
Ofgem
Review status
Review required