DNOs Create Export MPANs after approving G98/99 commissioning documents

Date of latest update
Type
Change
ID
R0321
Change Category
Change Path
Priority
Urgent
No
Latest Update
04/11/2026 On 20 October 2026, the REC Change Panel voted, in line with the Code Manager's recommendation, to approve this Change Proposal. The appeal window is now closed. R0321 will be implemented on 25 June 2027.
Summary
The creation of Import Metering Points for new Premises sits with the Distribution Network Operator (DNO), while the Export Metering Points generally sit with the Electricity Supplier. When the DNO approves the G98 Engineering Recommendation Installation Document (Form B) or G99 Engineering Recommendation Installation Document (Form A3-1 or A3-2) under the Distribution Code, they could create Export Metering Points at this time (with the logical Disconnection process being available for any Export Metering Points that are then not required).
Proposer
Ben Atkinson
Change Plan

Change Report (Proposal Plan) approved at Change Panel

Completed

Start:

Due:

Completion:

05 May 2026

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

07 May 2026

Change Report (For Consultation) and Update to Plan approved at Change Panel

Completed

Start:

Due:

Completion:

17 Aug 2026

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

03 Sep 2026

Final Recommendation approved at Change Panel

Completed

Start:

Due:

Completion:

20 Oct 2026
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Implementation Date
Status Scheduled
EMAR Version 4.6.0_Scheduled

Documents

Name Version Last updated Actions
244.73 KB
Version 1.0 - 02 Nov 2026 PDF - 244.73 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Schedule 27 RMP lifecycle draft V0.1
Upload document
RMP Lifecycle draft for export MPANs - 21 November 2025(118301312) (1).docx
Archive
Off
Document title
Schedule 27 RMP lifecycle draft V0.2
Upload document
RMP Lifecycle draft for export MPANs - for consultation.docx
Archive
Off
Problem Statement
The information required by the DNO to create an Export Metering Point sits with the Consumer rather than the Electricity Supplier, and leads to the Electricity Supplier acting as an unnecessary third party in the process. This is leading to unnecessary time being added to the process, negatively impacting Consumers and the journey to Net Zero. This is particularly apparent for large new housing developments, which may have several tens of thousands of Export Metering Points to create with the same DNO and require the use of the Bulk Request process. This process is cumbersome and has no two DNOs operating the process in the same way.
SME
SME Role
Lead Assurance Analyst
R0321 submission form
R0321 Change Report (Proposal Plan) Approved 05.05.26
R0321 Consolidated Impact Assessment Responses v1.0 PUBLIC
R0321 Update to Plan V1.0 approved 18.08.26
R0321 Change Report (For Consultation) approved 18.08.26
R0321 Consolidated consultation responses - NON CONFIDENTIAL
R0321 Change Report (Final Recommendation) V1.0 Approved 20.10.26
Company Name
British Gas
Review status
Review required
Schedule 27 - RMP Lifecycle 2.1 – Implemented on
Market Participant Applicability
Market participant All Sections
Domestic Suppliers Mandatory
Non-Domestic Suppliers Mandatory
Gas Transporters Mandatory
Distribution Network Operators Mandatory
DCC Mandatory
Metering Equipment Managers N/A
Non-Party REC Service Users N/A
Loading...

Extending R0067 Refresh Functionality

Date of latest update
Type
Issue
ID
I0281
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/09/2026 - The update to plan has been approved by the Technical Expert Panel on 30 September 2026.
Summary
CSS Market Messages sent by the Central Switching Service (CSS) to Switching Data Service Providers (SDSPs) are either not being received, being received after Gate Closure, or are being received out of the order that they were originally sent in. This Issue originally aimed to extend the Refresh functionality, implemented for the Gas Retail Data Agent (GRDA).to the Electricity Retail Data Agent (ERDA). Following solution development for I0281, it was agreed that the Refresh functionality would be made available for all Market Participants in receipt of the in-scope messages.
Proposer
Finn Deacon
Change Report - Initial Assessment and Change Plan Report

Comments deadline
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
Francine Peyroux-Sissoko
Solution Development
Proposed Solution Document
Document title
I0281_Proposed_Legal text_PIA_V1.0.
Upload document
I0281_Proposed_Legal text_PIA_V1.0.zip
Archive
Off
Problem Statement
CSS messages are not received by the SDSPs in the order in which they were originally sent, or after Gate Closure, so it can be difficult to detect and often requires significant manual effort to resolve. This issue can directly impact Consumer switching experiences, causing disruption and possible delays in a switch.
Workgroup
Workgroup(s)
I0281_Change Report (Update to Plan) v1.0 (Pre-approval)
I0281_Change Report (Update to Plan) v2.0 Approved
I0281_Change Report (Update to Plan) v2.0 (Pre-approval)
I0281_Change Report (Update to Plan) v1.0 Approved 20.05.2026
I0281_Change Report (Proposal Plan) v1.0_Approved 04.11.2025
Company Name
REC Technical Services
Review status
Review required
Schedule 27 - RMP Lifecycle 1.4 – Implemented on
Market Participant Applicability
Market participant All Sections
Domestic Suppliers Mandatory
Non-Domestic Suppliers Mandatory
Gas Transporters Mandatory
Distribution Network Operators Mandatory
DCC Mandatory
Metering Equipment Managers N/A
Non-Party REC Service Users N/A
Loading...

Sequence order of CSS00200 message

Date of latest update
Type
Issue
ID
I0204
Urgent
No
Latest Update
08/11/2024 - The Proposer has withdrawn this issue as it is being progressed under MHHS CR056. The adoption window has now closed. * This is Issue relates to the Market-wide Half Hourly Settlement design.
Summary
Empty
Proposer
Madison Layton
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
Stages Selection
Company Name
St.Clements
Review status
Review required

Introduction of SLA for Supplier De-Registration on Disconnected Meters

Date of latest update
Type
Change
ID
R0191
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
Issue has been discussed twice at RIG and has been identified via data cleanse activity. Parties identified that there are a number of meters (NG alone have 5k in this state) that are showing as terminated but an active Energy Supplier appointment. Discussion at RIG identified that REC Is potentially lacking detail/obligations/timescales on suppliers/DNOs to report/update/respond to disconnection queries.
Proposer
shelley.rouse
Change Plan

Change Plan approved by Change Panel

Completed

Start:

Due:

Completion:

01 Apr 2025

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

03 Apr 2025

Change Report (For Consultation) approved by Change Panel

Completed

Start:

Due:

Completion:

17 Jun 2025

Approved at Change Panel

Completed

Start:

Due:

Completion:

05 Aug 2025
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 4.1.0_Superseded
Included changes Affected REC Items
R0152 Revision to the Consolidated Metering Code of Practice (CoMCoP)
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0157 Removal of Facsimile as a Method of Code Communication
  • Schedule 14 - Metering Operations
  • Schedule 18 - Green Deal Arrangements
  • Standards Definition Document
  • Data Item Catalogue
R0191 Introduction of SLA for Supplier De-Registration on Disconnected Meters
  • Schedule 27 - RMP Lifecycle
R0205 Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches
R0212 Protecting Crimestoppers and their Contacts
R0215 Schedule 30 Switch Meter Reading Problems - Rejections and Timings
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
R0060 ERDS Service Definition timezone correction
  • Schedule 1 - Interpretations and Definitions
R0232 Non-Domestic Change of Occupier SDEP Screens (R0155 Solution)
R0243 Transfer of Standard Settlement Configuration and Time Pattern Regime Data Item Ownership
  • Data Item Catalogue
R0248 REC Changes to tie in with DCP451 - Suspending Registrations
  • Schedule 24 - Switching Data Management
R0254 Non-Domestic Change of Occupier Reporting (R0155 Solution)
R0255 Terms of Reference Updates
R0257 Change to REC for Data processing outside of EEA
R0263 Sharing Confirmed Energy Theft Data with the BSCCo
  • Schedule 7 - Energy Theft Reduction
R0269 Schedule 5 – Change Management: Clarity and Typographical Review
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0279 Housekeeping November 2025
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 7 - Energy Theft Reduction
  • Schedule 27 - RMP Lifecycle
  • Schedule 18 - Green Deal Arrangements
  • Schedule 24 - Switching Data Management
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Market Message Catalogue
R0227 Domestic Elective HH Switching
  • Schedule 23 - Registration Services
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0191 draft legal text for IA
Upload document
I0191 draft legal text for IA.pdf
Archive
Off
Document title
R0191 draft legal text for consultation - pre MHHS
Upload document
I0191 draft legal text for consultation - pre MHHS.pdf
Archive
Off
Document title
R0191 draft legal text for consultation - post MHHS
Upload document
I0191 draft legal text for consultation - post MHHS.pdf
Archive
Off
Problem Statement
There is no time scale by which Energy Suppliers need to have submitted the Registration De-Activation Request or for electricity to have raised a query with the Distribution Network Operator (DNO) if they believe the Metering Point should not be Disconnected. This raises difficulties for the REC Performance Assurance team when monitoring and enforcing this obligation.
I0191- De-energisation of disconnected meters
I0191 Change Report (Proposal Plan) V1.1 Approved 01.04.25
I0191 Consolidated Impact Assessment Responses v1.0
R0191 Change Report (For Consultation) V1.1
R0191 Consolidated Consultation Responses V1.0
R0191 Change Report (Final Recommendation) Approved 05.08.25
Company Name
REC Issues Group
Review status
Review required
Schedule 27 - RMP Lifecycle 1.3 – Implemented on
Market Participant Applicability
Market participant All Sections
Domestic Suppliers Mandatory
Non-Domestic Suppliers Mandatory
Gas Transporters Mandatory
Distribution Network Operators Mandatory
DCC Mandatory
Metering Equipment Managers N/A
Non-Party REC Service Users N/A
Loading...