DNOs Create Export MPANs after approving G98/99 commissioning documents
Date of latest update
Type
Change
ID
R0321
Change Category
Change Path
Priority
Urgent
No
Latest Update
04/11/2026 On 20 October 2026, the REC Change Panel voted, in line with the Code Manager's recommendation, to approve this Change Proposal. The appeal window is now closed. R0321 will be implemented on 25 June 2027.
Summary
The creation of Import Metering Points for new Premises sits with the Distribution Network Operator (DNO), while the Export Metering Points generally sit with the Electricity Supplier. When the DNO approves the G98 Engineering Recommendation Installation Document (Form B) or G99 Engineering Recommendation Installation Document (Form A3-1 or A3-2) under the Distribution Code, they could create Export Metering Points at this time (with the logical Disconnection process being available for any Export Metering Points that are then not required).
Change Plan
Change Report (Proposal Plan) approved at Change Panel
Completed
Start:
Due:
Completion:
05 May 2026Presented at Change Issues Group
Completed
Start:
Due:
Completion:
07 May 2026Change Report (For Consultation) and Update to Plan approved at Change Panel
Completed
Start:
Due:
Completion:
17 Aug 2026Presented at Change Issues Group
Completed
Start:
Due:
Completion:
03 Sep 2026Final Recommendation approved at Change Panel
Completed
Start:
Due:
Completion:
20 Oct 2026Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
25 June 2027
| Included changes | Affected REC Items | |
|---|---|---|
| R0122 | SDEP Review Improvements (2) - Usability | |
| R0178 | Improvements to CSS Business Process Logic | |
| R0284 | Updates to Schedule 14 Measurement Transformers Commissioning Timescales |
|
| R0321 | DNOs Create Export MPANs after approving G98/99 commissioning documents |
|
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Schedule 27 RMP lifecycle draft V0.1
Upload document
RMP Lifecycle draft for export MPANs - 21 November 2025(118301312) (1).docx
Archive
Off
Document title
Schedule 27 RMP lifecycle draft V0.2
Upload document
RMP Lifecycle draft for export MPANs - for consultation.docx
Archive
Off
Problem Statement
The information required by the DNO to create an Export Metering Point sits with the Consumer rather than the Electricity Supplier, and leads to the Electricity Supplier acting as an unnecessary third party in the process. This is leading to unnecessary time being added to the process, negatively impacting Consumers and the journey to Net Zero. This is particularly apparent for large new housing developments, which may have several tens of thousands of Export Metering Points to create with the same DNO and require the use of the Bulk Request process. This process is cumbersome and has no two DNOs operating the process in the same way.
Stages Selection
SME
SME Role
Lead Assurance Analyst
R0321 submission form
R0321 Change Report (Proposal Plan) Approved 05.05.26
R0321 Consolidated Impact Assessment Responses v1.0 PUBLIC
R0321 Update to Plan V1.0 approved 18.08.26
R0321 Change Report (For Consultation) approved 18.08.26
R0321 Consolidated consultation responses - NON CONFIDENTIAL
R0321 Change Report (Final Recommendation) V1.0 Approved 20.10.26
Company Name
British Gas
Review status
Review required
Schedule 27 - RMP Lifecycle 2.1
– Implemented on
Market Participant Applicability
| Market participant | All Sections |
|---|---|
| Domestic Suppliers | Mandatory |
| Non-Domestic Suppliers | Mandatory |
| Gas Transporters | Mandatory |
| Distribution Network Operators | Mandatory |
| DCC | Mandatory |
| Metering Equipment Managers | N/A |
| Non-Party REC Service Users | N/A |
Loading...
Extending R0067 Refresh Functionality
Date of latest update
Type
Issue
ID
I0281
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/09/2026 - The update to plan has been approved by the Technical Expert Panel on 30 September 2026.
Summary
CSS Market Messages sent by the Central Switching Service (CSS) to Switching Data Service Providers (SDSPs) are either not being received, being received after Gate Closure, or are being received out of the order that they were originally sent in. This Issue originally aimed to extend the Refresh functionality, implemented for the Gas Retail Data Agent (GRDA).to the Electricity Retail Data Agent (ERDA). Following solution development for I0281, it was agreed that the Refresh functionality would be made available for all Market Participants in receipt of the in-scope messages.
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0281_Proposed_Legal text_PIA_V1.0.
Upload document
I0281_Proposed_Legal text_PIA_V1.0.zip
Archive
Off
Problem Statement
CSS messages are not received by the SDSPs in the order in which they were originally sent, or after Gate Closure, so it can be difficult to detect and often requires significant manual effort to resolve. This issue can directly impact Consumer switching experiences, causing disruption and possible delays in a switch.
Stages Selection
Stages Selection
Workgroup
Workgroup(s)
I0281_Change Report (Update to Plan) v1.0 (Pre-approval)
I0281_Change Report (Update to Plan) v2.0 Approved
I0281_Change Report (Update to Plan) v2.0 (Pre-approval)
I0281_Change Report (Update to Plan) v1.0 Approved 20.05.2026
I0281_Change Report (Proposal Plan) v1.0_Approved 04.11.2025
Company Name
REC Technical Services
Review status
Review required
Schedule 27 - RMP Lifecycle 2.0
– Implemented on
Loading...
Schedule 27 - RMP Lifecycle 1.5
– Implemented on
Loading...
Schedule 27 - RMP Lifecycle 1.4
– Implemented on
Market Participant Applicability
| Market participant | All Sections |
|---|---|
| Domestic Suppliers | Mandatory |
| Non-Domestic Suppliers | Mandatory |
| Gas Transporters | Mandatory |
| Distribution Network Operators | Mandatory |
| DCC | Mandatory |
| Metering Equipment Managers | N/A |
| Non-Party REC Service Users | N/A |
Loading...
Sequence order of CSS00200 message
Date of latest update
Type
Issue
ID
I0204
Urgent
No
Latest Update
08/11/2024 - The Proposer has withdrawn this issue as it is being progressed under MHHS CR056. The adoption window has now closed. * This is Issue relates to the Market-wide Half Hourly Settlement design.
Summary
Empty
Status
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
Stages Selection
Company Name
St.Clements
Review status
Review required
Introduction of SLA for Supplier De-Registration on Disconnected Meters
Date of latest update
Type
Change
ID
R0191
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
Issue has been discussed twice at RIG and has been identified via data cleanse activity. Parties identified that there are a number of meters (NG alone have 5k in this state) that are showing as terminated but an active Energy Supplier appointment. Discussion at RIG identified that REC Is potentially lacking detail/obligations/timescales on suppliers/DNOs to report/update/respond to disconnection queries.
Change Plan
Change Plan approved by Change Panel
Completed
Start:
Due:
Completion:
01 Apr 2025Presented at Change Issues Group
Completed
Start:
Due:
Completion:
03 Apr 2025Change Report (For Consultation) approved by Change Panel
Completed
Start:
Due:
Completion:
17 Jun 2025Approved at Change Panel
Completed
Start:
Due:
Completion:
05 Aug 2025Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
07 November 2025
| Included changes | Affected REC Items | |
|---|---|---|
| R0152 | Revision to the Consolidated Metering Code of Practice (CoMCoP) |
|
| R0157 | Removal of Facsimile as a Method of Code Communication |
|
| R0191 | Introduction of SLA for Supplier De-Registration on Disconnected Meters |
|
| R0205 | Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches | |
| R0212 | Protecting Crimestoppers and their Contacts | |
| R0215 | Schedule 30 Switch Meter Reading Problems - Rejections and Timings |
|
| R0060 | ERDS Service Definition timezone correction |
|
| R0232 | Non-Domestic Change of Occupier SDEP Screens (R0155 Solution) | |
| R0243 | Transfer of Standard Settlement Configuration and Time Pattern Regime Data Item Ownership |
|
| R0248 | REC Changes to tie in with DCP451 - Suspending Registrations |
|
| R0254 | Non-Domestic Change of Occupier Reporting (R0155 Solution) | |
| R0255 | Terms of Reference Updates | |
| R0257 | Change to REC for Data processing outside of EEA | |
| R0263 | Sharing Confirmed Energy Theft Data with the BSCCo |
|
| R0269 | Schedule 5 – Change Management: Clarity and Typographical Review |
|
| R0279 | Housekeeping November 2025 |
|
| R0227 | Domestic Elective HH Switching |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0191 draft legal text for IA
Upload document
I0191 draft legal text for IA.pdf
Archive
Off
Document title
R0191 draft legal text for consultation - pre MHHS
Upload document
I0191 draft legal text for consultation - pre MHHS.pdf
Archive
Off
Document title
R0191 draft legal text for consultation - post MHHS
Upload document
I0191 draft legal text for consultation - post MHHS.pdf
Archive
Off
Problem Statement
There is no time scale by which Energy Suppliers need to have submitted the Registration De-Activation Request or for electricity to have raised a query with the Distribution Network Operator (DNO) if they believe the Metering Point should not be Disconnected. This raises difficulties for the REC Performance Assurance team when monitoring and enforcing this obligation.
Stages Selection
I0191- De-energisation of disconnected meters
I0191 Change Report (Proposal Plan) V1.1 Approved 01.04.25
I0191 Consolidated Impact Assessment Responses v1.0
R0191 Change Report (For Consultation) V1.1
R0191 Consolidated Consultation Responses V1.0
R0191 Change Report (Final Recommendation) Approved 05.08.25
Company Name
REC Issues Group
Review status
Review required
Schedule 27 - RMP Lifecycle 1.3
– Implemented on
Market Participant Applicability
| Market participant | All Sections |
|---|---|
| Domestic Suppliers | Mandatory |
| Non-Domestic Suppliers | Mandatory |
| Gas Transporters | Mandatory |
| Distribution Network Operators | Mandatory |
| DCC | Mandatory |
| Metering Equipment Managers | N/A |
| Non-Party REC Service Users | N/A |
Loading...