Energy Code Reform - consequential changes to the REC

Date of latest update
Type
Change
ID
R0348
Change Category
Change Path
Priority
Urgent
No
Latest Update
The Final Recommendation has been published for determination by the REC Change Panel on 17 November 2026.
Summary
On 04 September 2026, Ofgem published a Statutory consultation to seek views on proposed amendments to the Retail Energy Code and affected licences required to implement the new governance framework. The proposals address the principal changes required to introduce the new code governance arrangements, including the revised Code Modification process, the Stakeholder Advisory Forum (SAF), changes to existing governance arrangements and transitional provisions. A review of the wider REC baseline has identified that implementation of those changes has consequential impacts on other REC Schedules and subsidiary REC products which are not, or are not fully, addressed by Ofgem’s proposed statutory modifications. Ofgem's statutory Code Reform process will itself introduce amendments to the REC, including amendments to a number of REC Schedules. Those amendments are outside the scope of R0348 and are not being proposed, assessed or approved through this Change Proposal. Where a REC Schedule is being amended both by Ofgem and by R0348, the two sets of amendments will need to be read together and, on implementation, consolidated to form the complete revised Schedule
Proposer
Ann Perry
Change report - Final Change Report

Comments deadline
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Holly Law
Solution Development
Problem Statement
Without corresponding consequential amendments, parts of the REC baseline could retain references, responsibilities, governance arrangements or processes that are inconsistent with reformed REC arrangements. This could create ambiguity over which governance arrangements apply, where responsibilities sit and which process should be followed. It would also mean that different REC products could describe the same arrangements inconsistently.
Workgroup
Workgroup(s)
Energy Code Reform - consequential changes to the REC submission form
Legal Drafting - consultation
Legal Drafting - Final
R0348 Consolidated consultation responses
Change Report - Final Recommendation
Company Name
-
Review status
Review required

Use of REL Data to Support Key Regulations

Date of latest update
Type
Change
ID
R0324
Change Category
Change Path
Priority
Urgent
No
Latest Update
29/10/2026 - The Change Report (Final Recommendation) in line with the Code Manager recommendation, the REC Technical Expert Panel approved this Change Proposal for implementation on 26 February 2027. The appeal window is open until 12 November 2026.
Summary
The REC Electricity Enquiry Service (EES) Service Definition and Electricity Data Access Matrix (DAM) limits access of REL data to the Authority. This Issues seeks to extend access to the Code Manager and government departments in Great Britain to facilitate key government reporting and REC processes.
Proposer
James Hardy
Change Plan

Proposal Plan approved at Change Panel

Completed

Start:

Due:

Completion:

15 Sep 2026

Final Recommendation approved at TEP

Completed

Start:

Due:

Completion:

28 Oct 2026
Impacted REC Services
Implementation Date
Status Scheduled
EMAR Version 4.5.0_Scheduled
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Poppy Mullins
Solution Development
Proposed Solution Document
Document title
I0324 Draft Legal Text
Upload document
I0324 Draft Legal Text (1).zip
Archive
Off
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0324 submission form
I0324 Change Report (Proposal Plan and Consultation) v1.1 Pre-Approval
R0324 Change Report (Consultation) Approved 15.09.26
R0324 - Consolidated Consultation Responses v1.0
R0324 Change Report (Final Recommendation) v1.0 Pre Approval
R0324 Change Report (Final Recommendation) v2.0 Approved 28.10.26
Company Name
REC Code Manager
Review status
Review required

Erroneous Switch Review: I0237 Clarifications

Date of latest update
Type
Change
ID
R0322
Change Category
Change Path
Priority
Urgent
No
Latest Update
On 03 November 2026, the Change Panel, in line with Code Manager recommendation, voted to approve this Change Proposal. The appeal window is now open until 23:59 on 18 November.
Summary
The I0237 working group has carried out an end-to-end review of the Erroneous Switch process. The working group highlighted housekeeping changes and clarifications within Schedule 30 and the Market Messages.
Proposer
James Hardy
Change report - Final Change Report

Comments deadline
Implementation Date
Status Scheduled
EMAR Version 4.5.0_Scheduled
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
florentina.monea
Solution Development
Proposed Solution Document
Document title
Erroneous Switch Review - I0237 Clarifications (12.05.2026) V1.0
Upload document
Erroneous Switch Review - I0237 Clarifications (12.05.2026) V1.0.zip
Archive
Off
Document title
R0322 Legal Drafting V1.2
Upload document
R0322 - Legal Drafting.zip
Archive
Off
Problem Statement
The current Erroneous Switch drafting contains inconsistencies that can cause confusion and misunderstanding between Energy Suppliers regarding the applicable governance and process requirements, creating ambiguity around the correct contractual and operational framework. In addition, the I0237 Working Group has identified further required amendments to Schedule 30, highlighting that the existing drafting does not fully or accurately reflect intended process arrangements or correct terminology.
SME
SME Role
Lead Technical Analyst
R0322 submission form
R0322 - Change Report (Proposal Plan) V1.0 (Approved) 19.05.2026
R0322 Consolidated IA Responses
R0322 Change Report (For Consultation)
R0322 Consolidated Consultation Responses
R0322 Change Report (Final Recommendation) Approved
Company Name
REC Code Manager
Review status
Review required

Updates to Schedule 14 Measurement Transformers Commissioning Timescales

Date of latest update
Type
Change
ID
R0284
Change Category
Change Path
Priority
Urgent
No
Latest Update
12/08/2026 - the Metering Expert Panel approved the Change Report (Final Recommendation) V1.2. This Change Proposal will be implemented on 26 June 2027. If you wish to appeal this decision, this must be received by COB 28 August 2026.
Summary
The current timetables in REC Schedule 14 Metering Operations sections 15.6 and 30.6, where an Electricity Metering Asset requires commissioning in accordance with BSC Metering CoP 4 and the Measurement Transformers are owned by the DNO, or in 15.7 and 30.7 where the Measurement Transformers are not owned by the DNO, may no longer be fit for purpose post the implementation of MHHS Milestone M16, where the Settlement timetable reduces the RF run to 4 months.
Proposer
Caroline Freimuller
Change Plan

Change Report (Proposal Plan) approved by Change Panel

Completed

Start:

Due:

Completion:

03 Feb 2026

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

05 Feb 2026

Change Report (For Consultation) approved by Metering Expert Panel

Completed

Start:

Due:

Completion:

08 Apr 2026
Impacted Consumers
Impacted REC Documents
Status
Implementation Date
Status Scheduled
EMAR Version 4.6.0_Scheduled

Documents

Name Version Last updated Actions
244.73 KB
Version 1.0 - 02 Nov 2026 PDF - 244.73 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0284 Schedule 14 Metering Operations draft V0.2
Upload document
I0284 Schedule 14 Metering Operations draft V0.2.pdf
Archive
Off
Document title
R0284 Schedule 14 Metering Operations draft V0.3
Upload document
I0284 Schedule 14 Metering Operations draft V0.3.pdf
Archive
Off
Document title
R0284 Schedule 14 Metering Operations final version
Upload document
I0284 Schedule 14 Metering Operations final version.pdf
Archive
Off
Problem Statement
The current timetables in REC Schedule 14 Metering Operations sections 15.6 and 30.6, where an Electricity Metering Asset requires commissioning in accordance with BSC Metering CoP 4 and the Measurement Transformers are owned by the DNO, or in 15.7 and 30.7 where the Measurement Transformers are not owned by the DNO, may no longer be fit for purpose post the implementation of MHHS Milestone M16, where the Settlement timetable reduces the RF run to 4 months.
I0284 submission form
I0284 Change Report (Proposal Plan) V1.0 approved 03.02.26
I0284 Change Issue Group paper v1.0
I0284 Consolidated Impact Assessment Responses PUBLIC v1.0
R0284 Change Report (For Consultation) V1.0 approved 08.04.26
R0284 Consolidated Consultation Responses PUBLIC v1.0
R0284 Change Report (Final Recommendation) V1.2 approved 12.08.26
Company Name
REC Code Manager
Review status
Review required