Energy Code Reform - consequential changes to the REC
Date of latest update
Type
Change
ID
R0348
Change Category
Change Path
Priority
Urgent
No
Latest Update
The Final Recommendation has been published for determination by the REC Change Panel on 17 November 2026.
Summary
On 04 September 2026, Ofgem published a Statutory consultation to seek views on proposed amendments to the Retail Energy Code and affected licences required to implement the new governance framework. The proposals address the principal changes required to introduce the new code governance arrangements, including the revised Code Modification process, the Stakeholder Advisory Forum (SAF), changes to existing governance arrangements and transitional provisions. A review of the wider REC baseline has identified that implementation of those changes has consequential impacts on other REC Schedules and subsidiary REC products which are not, or are not fully, addressed by Ofgem’s proposed statutory modifications. Ofgem's statutory Code Reform process will itself introduce amendments to the REC, including amendments to a number of REC Schedules. Those amendments are outside the scope of R0348 and are not being proposed, assessed or approved through this Change Proposal. Where a REC Schedule is being amended both by Ofgem and by R0348, the two sets of amendments will need to be read together and, on implementation, consolidated to form the complete revised Schedule
Impacted REC Documents
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Problem Statement
Without corresponding consequential amendments, parts of the REC baseline could retain references, responsibilities, governance arrangements or processes that are inconsistent with reformed REC arrangements. This could create ambiguity over which governance arrangements apply, where responsibilities sit and which process should be followed. It would also mean that different REC products could describe the same arrangements inconsistently.
Stages Selection
Workgroup
Workgroup(s)
Energy Code Reform - consequential changes to the REC submission form
Legal Drafting - consultation
Legal Drafting - Final
R0348 Consolidated consultation responses
Change Report - Final Recommendation
Company Name
-
Review status
Review required
Schedule 19 - Market Exit and Supplier of Last Resort 4.0
– Implemented on
Market Participant Applicability
| Market participant | All Sections |
|---|---|
| Domestic Suppliers | Mandatory |
| Non-Domestic Suppliers | Mandatory |
| Gas Transporters | Mandatory |
| Distribution Network Operators | Mandatory |
| DCC | Mandatory |
| Metering Equipment Managers | Mandatory |
| Non-Party REC Service Users | Mandatory |
Loading...
Schedule 19 - Market Exit and Supplier of Last Resort 3.3
– Implemented on
Market Participant Applicability
| Market participant | All Sections |
|---|---|
| Domestic Suppliers | Mandatory |
| Non-Domestic Suppliers | Mandatory |
| Gas Transporters | Mandatory |
| Distribution Network Operators | Mandatory |
| DCC | Mandatory |
| Metering Equipment Managers | Mandatory |
| Non-Party REC Service Users | Mandatory |
Loading...
Schedule 19 - Market Exit and Supplier of Last Resort 3.2
– Implemented on
Loading...
Schedule 19 - Market Exit and Supplier of Last Resort 3.1
– Implemented on
Market Participant Applicability
| Market participant | All Sections |
|---|---|
| Domestic Suppliers | Mandatory |
| Non-Domestic Suppliers | Mandatory |
| Gas Transporters | Mandatory |
| Distribution Network Operators | Mandatory |
| DCC | Mandatory |
| Metering Equipment Managers | Mandatory |
| Non-Party REC Service Users | Mandatory |
Loading...
Clarification of Supplier of Last Resort Obligations under the REC
Date of latest update
Type
Change
ID
R0057
Change Category
Change Path
Priority
Urgent
No
Latest Update
04/08/2023 - Change Proposal has been withdrawn as agreed with the Proposer. The Problem Statement was addressed through C3-0047 - Updates to PAB Procedures.
Summary
Within Schedule 19 – Market Exit and Supplier of Last Resort there is currently no consideration of circumstances where the Replacement Supplier is unable to fulfil its REC obligations in respect of Consumers transferred to them, due to them having little or no control over the processes of the failed supplier or it’s administrator. This change seeks to define when the Replacement Supplier is responsible for obligations relating to the Consumers gained through a Supplier of Last Resort (SoLR) Process.
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- As a Consumer when my Energy Supplier goes out of business and I am transferred to a Replacement Supplier, I want my supply transfer to be handled quickly and have confidence that my new Supplier has all the necessary data to set up my account and bill me correctly from the transfer date, and if the Replacement Supplier fails to provide the expected level of service they will be appropriately held accountable.
- As a Replacement Supplier, I want the limitations affecting my ability to meet my REC obligations to be understood by the REC Code Manager and the Performance Assurance Board, so that any breaches of obligations are considered fairly and any limitations are taken into consideration.
- As the Code Manager I want to apply appropriate and proportionate Performance Assurance Techniques, taking in to account the ability of a Replacement Supplier to meet their obligations under the REC.
Proposed Solution Document
Document title
R0057 Draft Legal Text
Upload document
R0057 Draft Legal Text.zip
Archive
Off
Problem Statement
Currently, Replacement Suppliers are responsible for all obligations of the failed supplier from the date and time set out in the Last Resort Supply Direction, this includes a period of time prior to Consumer accounts transferring to the Replacement Supplier’s systems, limiting their ability to fulfil these obligations. This means that a Replacement Supplier may experience issues with the Performance Assurance obligations for which they are responsible, but do not have direct control over. Any breaches of obligations by a Replacement Supplier need to be considered fairly and any limitations the Replacement Supplier may face are taken into consideration.
Stages Selection
R0057 - Change Proposal Form
R0057 - Solution Options
R0057 - Consolidated Impact Assessment Responses
R0057 - Change Proposal Plan v1.0
R0057 - Initial Assessment Report v1.0 (Approved)
R0057 - Preliminary Change Report V1.0 (Approved)
Company Name
EDF
Review status
Review required
Schedule 19 - Market Exit and Supplier of Last Resort 3.0
– Implemented on
Market Participant Applicability
| Market participant | All Sections |
|---|---|
| Domestic Suppliers | N/A |
| Non-Domestic Suppliers | N/A |
| Gas Transporters | N/A |
| Distribution Network Operators | N/A |
| DCC | N/A |
| Metering Equipment Managers | N/A |
| Non-Party REC Service Users | N/A |
Loading...
REC V3.0
Date of latest update
Type
Change
ID
R0041
Change Category
Urgent
Yes
Latest Update
-
Summary
-
Change Plan
Legal text baselined
Completed
Start:
10 Apr 2022Due:
13 May 2022Completion:
13 May 2022Final Change Report Issued
Completed
Start:
13 May 2022Due:
20 May 2022Completion:
20 May 2022Responsible Committee Decision
Completed
Start:
20 May 2022Due:
07 Jun 2022Completion:
07 Jun 2022Authority Determination (Original)
Completed
Start:
07 Jun 2022Due:
20 Jun 2022Completion:
17 Jun 2022Authority Determination (revoked and re-issued)
Completed
Start:
20 Jun 2022Due:
29 Jun 2022Completion:
29 Jun 2022Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
18 July 2022
| Included changes | Affected REC Items | |
|---|---|---|
| R0038 | Performance Assurance Report Catalogue Changes as a consequence of REC V3.0 | |
| R0041 | REC V3.0 |
|
| R0042 | Performance Assurance Board Terms of Reference |
|
| R0045 | Changes to SDEP Messages and Schedule numbering for REC V3.0 |
|
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 16 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
- As a Consumer, I want to be able to successfully switch my Energy Supplier with minimal delay or hassle, so that I can start to receive the service and tariff from my chosen Energy Supplier at the earliest opportunity.
- As the Authority, I want the necessary changes made to the Retail Energy Code to introduce the obligations, processes and provisions for the new switching arrangements, to enable the successful transition to enduring governance and operational arrangements.
- As a REC Party, I want to be clear on the obligations I need to meet and the processes I need to follow post CSS go live, to ensure my organisation is ready for the introduction of the new switching arrangements.
- As a REC Service Provider, I want to be clear on the obligations, processes and service standards that I need to meet, to ensure my organisation is ready for the introduction of the new switching arrangements.
Proposed Solution Document
Document title
REC V3.0 Baselined documents
Upload document
R0041 Legal Text.zip
Archive
Off
Document title
REC v3.0 Baselined documents (REC Portal)
Archive
Off
Problem Statement
Changes are required to the REC, to ensure the appropriate obligations, processes and provisions are defined within the REC at CSS go-live, enabling successful transition to enduring governance and operational arrangements developed as part of Ofgem’s Switching Programme.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0041 - Change Proposal Form
Letter from the Authority to the REC Code Manager - REC V3.0 Authority Change Proposal
R0041 - Change Proposal Plan v1.0 (Approved)
R0041 - Initial Assessment Report v2.0 (Approved)
R0041 - Final Change Report v3.0 (Post-Vote)
R0041 Authority Decision
Company Name
Ofgem
Review status
Review required