Energy Code Reform - consequential changes to the REC

Date of latest update
Type
Change
ID
R0348
Change Category
Change Path
Priority
Urgent
No
Latest Update
The Final Recommendation has been published for determination by the REC Change Panel on 17 November 2026.
Summary
On 04 September 2026, Ofgem published a Statutory consultation to seek views on proposed amendments to the Retail Energy Code and affected licences required to implement the new governance framework. The proposals address the principal changes required to introduce the new code governance arrangements, including the revised Code Modification process, the Stakeholder Advisory Forum (SAF), changes to existing governance arrangements and transitional provisions. A review of the wider REC baseline has identified that implementation of those changes has consequential impacts on other REC Schedules and subsidiary REC products which are not, or are not fully, addressed by Ofgem’s proposed statutory modifications. Ofgem's statutory Code Reform process will itself introduce amendments to the REC, including amendments to a number of REC Schedules. Those amendments are outside the scope of R0348 and are not being proposed, assessed or approved through this Change Proposal. Where a REC Schedule is being amended both by Ofgem and by R0348, the two sets of amendments will need to be read together and, on implementation, consolidated to form the complete revised Schedule
Proposer
Ann Perry
Change report - Final Change Report

Comments deadline
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Holly Law
Solution Development
Problem Statement
Without corresponding consequential amendments, parts of the REC baseline could retain references, responsibilities, governance arrangements or processes that are inconsistent with reformed REC arrangements. This could create ambiguity over which governance arrangements apply, where responsibilities sit and which process should be followed. It would also mean that different REC products could describe the same arrangements inconsistently.
Workgroup
Workgroup(s)
Energy Code Reform - consequential changes to the REC submission form
Legal Drafting - consultation
Legal Drafting - Final
R0348 Consolidated consultation responses
Change Report - Final Recommendation
Company Name
-
Review status
Review required

In-year CRS budget amendment

Date of latest update
Type
Change
ID
R0309
Change Path
Urgent
No
Latest Update
17/02/2026 - Change Panel approved this Change Proposal for implementation with immediate effect.
Summary
DCC has identified that the CRS budget for the current Financial Year (2025-2026) can be reduced, and as per the Code, a REC Change Proposal must be raised for the agreed budget to be amended.
Proposer
Bradley Baker
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
holly.law
Solution Development
R0309 submission form
R0309 Change Report (Final Recommendation) approved 17.02.26
Company Name
Smart DCC
Review status
Review required

Annual Review of the Performance Assurance Report Catalogue (2025-26)

Date of latest update
Type
Change
ID
R0298
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented on 27 March 2026.
Summary
The Code Manager is required to perform an annual review of a number of PAF items, including the PARC. The PARC has already been updated several times over the course of 2025 through a series of REC Changes (including R0173, R0202, R0254, R0259). We have conducted an end-to-end review and have identified the other changes are required.
Proposer
vcampbell-sharma
Status
Implementation Date
Status Superseded
EMAR Version 4.2.1_Superseded
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Performance Assurance Report Catalogue 5.16 - Redlined
Upload document
Performance Assurance Report Catalogue 5.16 - Redlined.xlsx
Archive
Off
Problem Statement
To ensure REC Parties and Service Providers are aware of reports they must provide for Performance Assurance as well as reports obtained from central data sources (such as, but not limited to, the DIP Manager) used in assuring their performance within the market. It is essential these reports are maintained in line with changes to Code processes as well as changing risk landscape.
SME
SME Role
Lead Assurance Analyst
R0298 Issue Form
R0298 - Change Report (For Consultation) V1.1 (20.01.2026)
R0298 - Consolidated Consultation Responses (Non-Confidential) 12.02.2026.
R0298 - Change Report (Final Recommendation) V1.0 (Approved) 24.02.2026
Company Name
REC Code Manager - Performance Assurance
Review status
Review required

Correction to Change Management Schedule regarding sub-committee voting

Date of latest update
Type
Change
ID
R0249
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the REC Release on 27 June 2025.
Summary
20.4 of Schedule 5 Change Management currently states "decisions of the relevant responsible sub-committee shall be made by a majority vote". This is factually incorrect as the Metering Expert Panel is subject to different voting arrangements.
Proposer
Caroline Freimuller
Change Plan

Proposal Plan approved by Change Panel

Completed

Start:

Due:

Completion:

15 Apr 2025
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Problem Statement
As a Category 1 document, Schedule 5 Change Management takes precent over Category 3 documents such as the Metering Expert Panel Terms of Reference. This change removes conflict identified within the REC.
Change Management draft.doc
Change Proposal Form
R0249 Change Report (Proposal Plan) V1.0 Approved 15.04.2025
R0249 Change Report (For Consultation) V1.0
R0249 Consolidated Consultation Responses v1.0
R0249 Change Report (Final Recommendation) V1.0 Approved 03.06.25
Company Name
REC Code Manager
Review status
Review required

REC Party Auto de-accession proposal

Date of latest update
Type
Change
ID
R0236
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the REC Release on 27 June 2025.
Summary
Update the REC to allow the option of any Party who has not proceeded to pursue Certification within 12 months of accession, and has not contacted the REC Code Manager in at least 6 months to indicate they wish to do so/remain acceded, to be removed without further contact or confirmation with that Party.
Proposer
Rebecca Griffiths
Change Plan

Change Report (Proposal Plan) approved by Change Panel

Completed

Start:

Due:

Completion:

04 Mar 2025
Status
Implementation Date
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0236 - Legal Drafting v0.1
Upload document
I0236 - Legal Drafting v0.1.pdf
Archive
Off
Problem Statement
There are many Parties who have acceded to the REC but not Qualified within 12 months of accession, and who have not contacted the Code Manager within 6 months. This may cause confusion for Parties in knowing which other organisations have Qualified for roles under the REC.
SME
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0236 - Submission Form v1.0 - REC Party Auto de-accession proposal.docx
I0236 Change Report (Proposal Plan) v1.0 Approved 04.03.25
I0236 Consolidated Impact Assessment Responses v1.0
R0236 - Change Report (For Consultation) V1.0 (09.04.2025)
R0236 Consolidated Consultation Responses v1.0
R0236 Change Report (Final Recommendation) V1.0 Approved 03.06.25
Company Name
Recco
Review status
Review required

Housekeeping Change for R0206

Date of latest update
Type
Change
ID
R0220
Change Path
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
This is a Housekeeping Change Proposal subject to the Housekeeping Change Proposal process, rather than the standard Change Process. The nature of the change is that it makes non-material changes to the REC Products to correct typographical, grammatical or consistency errors, and provides an opportunity to introduce necessary clarifications. This change proposal is looking to fix an error identified with R0206 Cross code change to align with BSC CP1598. BSC CP1598 was raised to add six scenario variants to four Market Messages that have been identified as missing. The REC Energy Market Data Specification contains a number of Market Message scenario variants used in BSC processes. This REC Change Proposal has been raised to align with CP1598 and ensure these scenario variants are added to the REC Data Specification. The legal text for R0206 approved at Change Panel on 15 October 2024, had a change to one of the scenario variants (SV00474) that was not clear as it was not red lined. The change was to the owner of the scenario variant from the Retail Energy Code Company (RECCo) to the Balancing and Settlement Code Company (BSCCo). The red lining for SVcccc was also incorrect as it deleted RECCo as the owner when in fact it is a new scenario variant so no previous owner. The owner as BSCCo that was approved, is correct.
Proposer
Holly Law
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
holly.law
Solution Development
Proposed Solution Document
Document title
R220_R0206 HK Solution Document v1.0.pdf
Upload document
R220_R0206 HK Solution Document v1.0.pdf
Archive
Off
R0220 - Housekeeping Change Report
Company Name
-
Review status
Review required

Protecting Crimestoppers and their Contacts

Date of latest update
Type
Change
ID
R0212
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
This proposal seeks to clarify how the information passed on to suppliers, DNOs and Transporters can be used and shared. The aim of which is to protect the charity's reputation, an anonymity guarantee and the welfare of those who contact Crimestoppers/Stay Energy Safe.
Proposer
Annette Booysen
Change Plan

Change Plan at Change Panel

Protecting Crimestoppers and their Contacts > Change Plan

Start:

16 Sep 2024

Due:

21 Jan 2025

Completion:

21 Jan 2025
Status
Implementation Date
Status Superseded
EMAR Version 4.1.0_Superseded
Included changes Affected REC Items
R0152 Revision to the Consolidated Metering Code of Practice (CoMCoP)
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0157 Removal of Facsimile as a Method of Code Communication
  • Schedule 14 - Metering Operations
  • Schedule 18 - Green Deal Arrangements
  • Standards Definition Document
  • Data Item Catalogue
R0191 Introduction of SLA for Supplier De-Registration on Disconnected Meters
  • Schedule 27 - RMP Lifecycle
R0205 Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches
R0212 Protecting Crimestoppers and their Contacts
R0215 Schedule 30 Switch Meter Reading Problems - Rejections and Timings
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
R0060 ERDS Service Definition timezone correction
  • Schedule 1 - Interpretations and Definitions
R0232 Non-Domestic Change of Occupier SDEP Screens (R0155 Solution)
R0243 Transfer of Standard Settlement Configuration and Time Pattern Regime Data Item Ownership
  • Data Item Catalogue
R0248 REC Changes to tie in with DCP451 - Suspending Registrations
  • Schedule 24 - Switching Data Management
R0254 Non-Domestic Change of Occupier Reporting (R0155 Solution)
R0255 Terms of Reference Updates
R0257 Change to REC for Data processing outside of EEA
R0263 Sharing Confirmed Energy Theft Data with the BSCCo
  • Schedule 7 - Energy Theft Reduction
R0269 Schedule 5 – Change Management: Clarity and Typographical Review
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0279 Housekeeping November 2025
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 7 - Energy Theft Reduction
  • Schedule 27 - RMP Lifecycle
  • Schedule 18 - Green Deal Arrangements
  • Schedule 24 - Switching Data Management
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Market Message Catalogue
R0227 Domestic Elective HH Switching
  • Schedule 23 - Registration Services
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
florentina.monea
Solution Development
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
Protecting Crimestoppers and their Contacts
I0212 - Change Report - Proposal Plan (Approved 21/01/2025)
I0212 Change Report (Extension Plan) Approved
R0212 - Draft Legal Text - 7 May 2025
R0212 Change Report (Consultation)
R0212 Consolidated Consultation Responses
R0212 Change Report (Final Recommendation) Post-vote
Company Name
Crimestoppers
Review status
Review required

November 2024 House Keeping Change

Date of latest update
Type
Change
ID
R0211
Change Path
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
The Code Manager has identified a number of typographical and formatting errors, as well as opportunities to provide clarity, improve consistency and accuracy across the REC Services and products. These changes have been assessed as meeting the criteria to be progressed via a Housekeeping Change Proposal.
Proposer
Lorna Mallon
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.14.0_Superseded
Included changes Affected REC Items
R0108 Enabling Electricity Enquiry Service searches using a Unique Property Reference Number
R0113 Data Specification updates and clarifications
R0115 Frequency and content of CSS reports on switching via the DCC portal
R0119 Annulment Definition
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0150 On-site Aggregation as a method to facilitate Third Party Access - BSC P455
  • Schedule 1 - Interpretations and Definitions
  • Schedule 25 - Central Switching Service
R0049 Intellectual Property Rights and Services Data Main Body changes
R0092A DCC Service Level Agreements for the Switching Incentive Regime (Alternative)
R0203 CSS Retry Strategy
  • Schedule 24 - Switching Data Management
R0206 Cross code change to align with BSC CP1598
  • Market Message Catalogue
R0211 November 2024 House Keeping Change
R0069 Amendments to Sample Access Agreement
  • Schedule 9 - Qualification and Maintenance
R0094 Clarify obligations on gas meter exchanges that occur close to CoS
  • Schedule 14 - Metering Operations
  • Market Message Catalogue
R0098 Optional fuzzy searching in EES

Documents

Name Version Last updated Actions
199.57 KB
Version 1.0 - 02 Nov 2026 PDF - 199.57 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0211 Housekeeping Legal text
Upload document
R0211 Housekeeping Legal text.zip
Archive
Off
Problem Statement
This is a Housekeeping Change Proposal subject to the Housekeeping Change Proposal process, rather than the standard change process. The nature of the change is that it makes non-material changes to the REC Products to correct typographical and consistency errors. It also provides an opportunity to introduce necessary clarifications.
Smart Meter Installer - Micro-Business Customer Survey HK Change (3).xlsx
Smart Meter Installer - Domestic Customer Survey HK Change
GES Supply Point Switching API Technical Specification
R0211 - Housekeeping Change Report (Approved) v2.0 (15.10.2024)
Company Name
Gemserv
Review status
Review required

Cross code change to align with BSC CP1598

Date of latest update
Type
Change
ID
R0206
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
Yes
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
This Change Proposal has been raised to align with BSC CP1598, which states that six Scenario Variants of Market Messages specified within the early drafting of P375 were not progressed to the final solution of P375 and REC CP R0008.
Proposer
Lorna Mallon
Impacted REC Documents
Status
Implementation Date
Status Superseded
EMAR Version 3.14.0_Superseded
Included changes Affected REC Items
R0108 Enabling Electricity Enquiry Service searches using a Unique Property Reference Number
R0113 Data Specification updates and clarifications
R0115 Frequency and content of CSS reports on switching via the DCC portal
R0119 Annulment Definition
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0150 On-site Aggregation as a method to facilitate Third Party Access - BSC P455
  • Schedule 1 - Interpretations and Definitions
  • Schedule 25 - Central Switching Service
R0049 Intellectual Property Rights and Services Data Main Body changes
R0092A DCC Service Level Agreements for the Switching Incentive Regime (Alternative)
R0203 CSS Retry Strategy
  • Schedule 24 - Switching Data Management
R0206 Cross code change to align with BSC CP1598
  • Market Message Catalogue
R0211 November 2024 House Keeping Change
R0069 Amendments to Sample Access Agreement
  • Schedule 9 - Qualification and Maintenance
R0094 Clarify obligations on gas meter exchanges that occur close to CoS
  • Schedule 14 - Metering Operations
  • Market Message Catalogue
R0098 Optional fuzzy searching in EES

Documents

Name Version Last updated Actions
199.57 KB
Version 1.0 - 02 Nov 2026 PDF - 199.57 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0206 Solution Document v1.0
Upload document
R0206 Solution Document v1.0 (1).pdf
Archive
Off
Problem Statement
As these Scenario Variants are not captured in the Data Specification, the relevant Market Participants won’t be able to use the Data Transfer Network (DTN) to exchange the relevant data, which would result in them having to use a less secure mechanism to send and receive data. This means the original intent of Elexon Modification P375 has yet to be achieved as not all Market Message changes have been implemented.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0206 - Change Proposal Form
CP1598-Proposal-Form-A-Amending-the-EMDS-to-add-missing-Scenario-Variants-for-P375-v1.0.pdf
CP1598-Attachment B-EMDS changes_v1.0 (1).docx
CP1598_CPC-CP-Consultation-Responses-v1.0.pdf
CP1598 CP Consultation v1.0.pdf
R0206 Change Report (Proposal Plan) V1.0
R0206 Change Report (For Consultation) V1.0
R0206 Consolidated Consultation Responses
R0206 Change Report (Final Recommendation - Approved) V2.0 15.10.2024
Company Name
REC Code Manager
Review status
Review required

Creation of a Tool to Manually Correct ERDS / CSS Discrepancies

Date of latest update
Type
Change
ID
R0201
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented on 27 March 2026.
Summary
There is currently a tool utilised by DNOs to manually correct registration data to align the Registered Supplier in ERDS with the data held in CSS. The Market-Wide Half Hourly Settlement (MHHS) Design does not allow for retrospective amendment of Supplier Registration i.e. there is no equivalent tool for manual correction post MHHS go live (M10). Therefore, post MHHS implementation, any issues which prevent CSS data being reflected in ERDS cannot be corrected. This will prevent the Supplier from appointing agents and will lead to errors in settlement data under the BSC. A change is required to address this.
Proposer
Andrew Wallace
Change report - Final Change Report

Comments deadline
Change Plan

Change Issue Group

Completed

Start:

01 Aug 2024

Due:

01 Aug 2024

Completion:

01 Aug 2024

Proposal Plan Approval

Completed

Start:

01 Aug 2024

Due:

03 Sep 2024

Completion:

03 Sep 2024
Impacted REC Documents
Status
Implementation Date
Status Superseded
EMAR Version 4.2.1_Superseded
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
holly.law
Solution Development
Proposed Solution Document
Document title
Indicative PARC extract for R0201
Upload document
Indicative PARC extract for R0201 270824 .xlsx
Archive
Off
Document title
Solution Development Report published for Impact Assessment
Upload document
R0201 - Solution Development Report for IA 2.0.pdf
Archive
Off
Document title
Legal Text published for Impact Assessment
Upload document
Legal Text Published for IA.zip
Archive
Off
Document title
R0201 - Solution Development Report 270824
Upload document
R0201 - Solution Development Report 270824.pdf
Archive
Off
Problem Statement
There are instances where ERDS (and SMRS under BSC governance) can be misaligned with the CSS and under the MHHS arrangements there is no mechanism for manual correction which there is in place today. From MHHS go live the Supplier will not be able to appoint their preferred agents. This issue only applies to MHHS Migrated Metering Points as the existing mechanism for manually correcting data would be used if the issue related to a non-migrated Metering Point. In the event that the Supplier cannot appoint its agents, this may prevent the Supplier from accurately billing the Consumer. The potential impact will increase as MHHS Migration continues, with more MHHS Metering Points potentially impacted by any CSS / ERDS discrepancy.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
CP Form - CSS ERDS Discrepancy
R0201 Change Proposal Re-Plan V2.0 Approved
Change Proposal Re-Plan V3.0 Approved
Change Report for Impact Assessment
RECCo Overview Slides - CSS and ERDS Discrepancies
R0201 Change Report Proposal Plan V2.0 (Approved) 03.09.2024
R0201 - Change Proposal Re-Plan v1.0 (Approved) 15.10.2024
R0201 Consolidated Impact Assessment Responses (Public)
R0201 Change Report (Consultation) v1.0 12.08.2025
R0201 Consolidated Consultation Responses V1.0
R0201 Change Proposal Re-plan V4.0
Company Name
RECCo
Review status
Review required