Addition of MEMs to the Gas Enquiry Service (GES) API

Date of latest update
Type
Issue
ID
I0195
Urgent
No
Latest Update
16/10/2024 - This Change Issue has been rejected as is already being progressed under the data access change process implemented as R0118.
Summary
Empty
Proposer
Amy Crowe-Lamont
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
Stages Selection
I0195-~1.doc
Company Name
Code Manager
Review status
Review required

Review of Metering Asset data transferred from MAMs to the CDSP

Date of latest update
Type
Issue
ID
I0196
Change Path
Priority
Urgent
No
Latest Update
10/09/2026 - The Metering Expert Panel approved the extension to plan for I0196. This REC Issue is now placed on hold.
Summary
It has emerged that a high proportion of gas Data Items contain mismatches when comparing between Metering Asset Managers (MAM), Gas Suppliers, and the Central Data Service Provider. This Issue seeks to explore this issue and identify mechanisms by which these mismatches may be resolved.
Proposer
Amy Crowe-Lamont
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
florentina.monea
Solution Development
Problem Statement
Work conducted by RPA has identified a significant number of mismatches between gas Data Items held by key stakeholders. This may result in Consumer detriment, as information relevant to an MPRN may not be held accurately by any given Party. As such, there is a need to review processes pertaining to the communication of gas data by MAMs onward to the CDSP to mitigate the potential for mismatches.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0196 Issue Proposal Form (Word)
I0196 Issue Proposal Form (PDF)
I0196 Change Report (Plan) (Approved) V2.0 07.05.25
I0196 Change Re-Plan (Approved) V1.0 02.05.25
I0196 Change Re-Plan V2.1 (Approved) 09.09.26
Company Name
-
Review status
Review required

Introducing a Process to Provide Updates During Fault Resolutions

Date of latest update
Type
Issue
ID
I0197
Change Category
Priority
Urgent
No
Latest Update
10/06/2026 - The Code Manager, following an approval to an Update to Plan by the REC Metering Expert Panel, has placed I0197 on hold.
Summary
Some customers have had faulty meters for a prolonged period, which impacts billing and settlement, and can prevent customers accessing specific tariffs. Currently the REC only has obligations relating to electricity meter faults, and these do not actually require work to be done to address faults. This issues proposes the introduction a maximum timeframe Fault Resolution deadline to resolve issues around faulty meters.
Proposer
Amy Crowe-Lamont
Change Report - Initial Assessment and Change Plan Report
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Problem Statement
Consumers have had faulty meters for a prolonged period, which impacts billing and settlement, and can prevent customers accessing specific tariffs.
SME
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0197 - Change Proposal Form
I0197 - Change Report (Proposal Plan) V1.0 (Approved) 03.06.2025
I0197 - Update to Plan V3.0 (On Hold) 03.06.2026
Company Name
-
Review status
Review required

CSS Change to Allow Prevent of Registration by Market Segment

Date of latest update
Type
Issue
ID
I0194
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
06/05/2025 - Code Manager presented solution development outcomes to Technical Change Panel on 30/04/2025 and confirmed that the issue has been resolved and will not be progressed further. An operational process will be put in place for the monitoring of Registrations by Market Segment.
Summary
To prevent a Supplier with exemptions in place that were approved, in BSC and REC PAB for Smart and Unmetered, from registering meter points other than those that they are Qualified in.
Proposer
Matt Cogram
Change Plan

Change Proposal Plan approved

Completed

Start:

25 Jul 2024

Due:

03 Dec 2024

Completion:

03 Dec 2024

Definition

In Progress

Start:

03 Dec 2024

Due:

28 Feb 2025

Completion:

Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Harriet Truss
Solution Development
Proposed Solution Document
Document title
I0194 - Solution Report v1.0 23.04.2025
Upload document
I0194 - Solution Report v1.0 23.04.2025.pdf
Archive
Off
Problem Statement
Suppliers who do not operate, or intend to operate, in the Smart or Unmetered Market Segments, will be seeking exemptions from the relevant MHHS Qualification requirements. At present, there is no mechanism in CSS to prevent Suppliers from registering Metering Points for which an exemption has been granted and for which they are therefore not qualified.
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
PAB281_01A_Modification Proposal Form.docx
I0194 - CSS Change to Allow Prevent of Registration by Market Segment.docx
PAB281_01_Request for Exemption from Suppliers v2.0.docx
352_04_Initial Written Assessment - v1.0.docx
I0194 Proposal Plan Change Report V2.0 (Approved) 03.12.2024.pdf
I0194 - Change Proposal Re-Plan v1.0 (Approved) 27.02.2025
Company Name
Elexon
Review status
Review required

Voice of the Consumer

Date of latest update
Type
Issue
ID
I0189
Change Category
Priority
Urgent
No
Latest Update
25/02/2026 - an Issue Closure Report has been published and this Issue moved to resolved.
Summary
There is currently a gap in the understanding of the effectiveness of the retail systems and processes in delivering positive outcomes for Consumers. While Consumer surveys are conducted on certain areas to some aspects of Consumer satisfaction, it may be necessary to expand the evaluation methods used by the Code Manager to gain a more comprehensive understanding.
Proposer
Nathan Chaplow
Change Plan

Working Group 1

Completed

Start:

Due:

Completion:

12 Dec 2024

Working Group 2

Completed

Start:

Due:

Completion:

10 Feb 2025

Working Group 3

Completed

Start:

Due:

Completion:

18 Mar 2025

Working Group 4

Completed

Start:

Due:

Completion:

30 Apr 2025

Extension to Plan approved by Change Panel

Completed

Start:

Due:

Completion:

20 May 2025

Working Group 5

Completed

Start:

Due:

Completion:

12 Jun 2025

Working Group 6

Completed

Start:

Due:

Completion:

28 Jul 2025
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0189 proposed legal text - draft 1
Upload document
I0189 proposed legal text - draft 1.zip
Archive
Off
Problem Statement
RECCo’s mission is to facilitate the efficient and effective running of the retail energy market, including its systems and processes through promoting innovation, competition, and delivering positive Consumer outcomes. However, the Code Manager receives limited feedback directly from Consumers to determine if this mission is being fulfilled.
SME
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
I0189- Voice of the Consumer
I0189 Change Report (Proposal Plan) v1.0 20.11.2024
I0189 Extension to Plan V1.0 Approved 20.05.2025
I0189 Extension to Plan V2.0 Approved 23.09.2025
I0189 Issue Closure Report V1.1
Company Name
Code Administrator
Review status
Review required

Schedule 8 Review and Best Practice Guidance Development

Date of latest update
Type
Issue
ID
I0187
Change Category
Change Path
Priority
Urgent
No
Latest Update
18/11/2026 The REC Change Panel has approved the Update to Plan as part of the Bulk Update presented at their meeting on 17/11/2026
Summary
Schedule 8 - Unbilled Energy Code of Practice has not been reviewed since its development for REC go-live. This Issue seeks to understand if there are any conflicts in the Schedule with best practice and identify any gaps or duplication. Alongside this, a best practice guidance document will be developed which is relevant, complete and aligned to current processes and obligations.
Proposer
Elise Handy
Change Report - Initial Assessment and Change Plan Report
Change Plan

Proposal Plan Approved at Change Panel

Completed

Start:

26 Sep 2024

Due:

31 Mar 2027

Completion:

21 Jan 2025
Impacted Consumers
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
Florentina Monea
Solution Development
Problem Statement
Schedule 8 - Unbilled Energy Code of Practice has not been reviewed since its development for REC go-live. The Schedule needs to be reviewed to ensure it is up to date, understand if there are any conflicts with best practice and identify any gaps or duplication.
Workgroup
Workgroup(s)
I0187 - Change Proposal Form
I0187 - Change Report (Proposal Plan) V1.0 (Approved) 21.01.2025
I0187 - Change Report (Extension to Plan) Approved 17.06.2025
I0187 - Change Report (Extension to Plan) 02.09.2025
I0187 - Change Report (Extension to Plan) 13.01.2025 (Pre-Approval)
I0187 - Change Report (Extension to Plan) V1.0 Approved 25.06.2026
I0187 - Change Report (Extension to Plan) 13.01.2025
I0187 - Change Report (Extension to Plan) V5.0 (Approved)
Company Name
Code Manager
Review status
Review required

Non dual-fuel Gas PSR Consumer

Date of latest update
Type
Issue
ID
I0186
Change Category
Change Path
Priority
Urgent
No
Latest Update
02/09/2025 - the Change Panel approved placing this Issue on hold while the proposer progresses a sandbox trial
Summary
Non dual-fuel Consumers who register upon the PSR, will have their PSR data flow across energy industry data flows to mean that all parties are aware of any PSR Needs Codes, allowing us all to provide equal access to our services and support. This will be achieved via the utilisation of existing processes and systems. Initially a pilot will take place for a minimum of 3 months between participating companies before extending this to the whole industry”.
Proposer
Ben Atkinson
Change Report - Initial Assessment and Change Plan Report
Impacted Consumers
Impacted REC Services
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Problem Statement
The majority of domestic customers in the UK are what are called in the industry ‘dual-fuel’ - this means that with two types of energy (electricity & gas) a domestic dwelling has a single supplier ie they pay their bill to one organisation. This ‘dual-fuel’ position has supported the industry improvements to Priority Services Register (PSR) data flows by allowing previous divides to be overstepped in terms of data flows between energy types. There is however a problem which this RECC request aims to resolve. That is, where a customer who has both fuel types, also has two suppliers and they want to register upon the PSR. This was always a ‘known’ gap shared with our regulator when the many improvements were implemented across the PSR and considered to be something that would be addressed at a later date. This ‘gap’ means that without the dual-fuel link, currently data flows do not complete across energy types via the supplier data flow triggers.
Change Proposal Form - Non dual-fuel Gas PSR Customer
I0186 - Change Report (Proposal Plan) V1.0 (Approved) 18.02.2025
Company Name
British Gas
Review status
Review required

Amendment Proposal: RECCo Access Provision to RECCo Services

Date of latest update
Type
Change
ID
R0185
Change Path
Priority
Urgent
No
Latest Update
08/08/2024 - the Proposer has withdrawn this Change Proposal.
Summary
RECCo is tasked with fulfilling several obligations. This proposal has been raised to amend some of the wording within the REC, which would benefit from reassessment. When the REC was originally drafted, references to RECCo in the code were originally intended to refer to the activities directly managed and overseen by the REC Board, and were considered separately to activities managed by the Code Manager.
Proposer
Andres Alvarez
Impacted REC Documents
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
R0185- CP Form Amendment Proposal RECCo Access Provision to RECCo Services.docx
Company Name
RECCo
Review status
Review required

Gas Meter Type Code - Thermal Mass Measurement

Date of latest update
Type
Issue
ID
I0184
Urgent
No
Latest Update
16/10/2024 - This Change Issue has been withdrawn at the request of the proposer.
Summary
Empty
Proposer
Joey Manners
Status
Implementation Status
Date Raised
Lead Analyst
Lydia Bentley
Solution Development
Stages Selection
Stages Selection
I0184 - Change Proposal Form (PDF)
Company Name
Octopus Energy Ltd
Review status
Review required

DPI Extract from CSS

Date of latest update
Type
Change
ID
R0183
Change Category
Change Path
Priority
Urgent
No
Latest Update
11/03/2025 - The proposer has withdrawn the request due to the expected delivery of enquiry data in the same anticipated timescales & the continued pursuance of I0224. The adoption window has closed.
Summary
It has emerged that there are data quality issues relating to the Domestic Premises Indicator (DPI) Data Item, where MPxNs have been recorded as having the wrong DPI. This Change has been raised to identify a mechanism by which this issue can be resolved.
Proposer
Andrew Waghorn
Change Plan

Solution Analysis and Development

In Progress

Start:

11 Jun 2024

Due:

20 Sep 2024

Completion:

Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
holly.law
Solution Development
Proposed solution summary
  1. C1 - As a Consumer, I want industry data relating to my energy supply to be accurate, so that I do not experience any issues when switching or engaging with other consumer facing industry practices.
  2. M1 - As a CSS User, I want available DPI data to be accurate, so that when I engage with industry processes that require DPI data, I am confident that I am engaging with the right information. M2 - As the CSS, I want to provide accurate data to CSS Users, so that I am able to facilitate successful industry operations for my Users.
Problem Statement
Inaccurate DPI data available within industry data sources can result in less accuracy within REC processes that utilise this data, and poorer consumer outcomes. DPI data accuracy needs to be improved to ensure that industry processes and Consumers are not impacted.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Change Proposal Form
R0183 Change Report V3.0 02.12.2024
Company Name
-
Review status
Review required