REC change to align with BSC IF-045 notification for Import/Export MPAN meter type misalignment

Date of latest update
Type
Change
ID
R0347
Change Category
Change Path
Urgent
No
Latest Update
05/11/2026 The Party impact assessment was published on 05 November 2026 and will remain open to responses until 27 November 2026. The Issue progressed to a Change Proposal on 05 November 2026.
Summary
Elexon are raising a CP that would introduce additional SMRS validation controls and a new IF-045 notification scenario to identify and manage metering misalignment across associated Import and Export MPANs. As this places obligations on MOAs, an impact to REC Schedule 14 has been identified.
Proposer
Caroline Freimuller
Impacted REC Documents
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Poppy Mullins
Solution Development
Proposed Solution Document
Document title
R0347 Legal Text Draft for Party impact assessment
Upload document
R0347 - Legal Text for Party IA.zip
Archive
Off
Problem Statement
The BSC CP CP1652 – Introduction of IF-045 notification from Registration Service for meter type misalignment was raised at the Supplier Volume Allocation Group on 06 October 2026. Following MHHS migration activity, Distribution Network Operators (DNOs) have identified and removed a population of Import and Export MPAN associations that contained inconsistent metering characteristics, including instances where one MPAN was configured with Smart Metering and the other with Advanced Metering. BSC CP1652 is seeking to create a new IF-045 notification scenario for the Supplier and the MOA to identify and manage misalignment issues. As BSC CP1652 relies on a new obligation on MOAs to agree on an approach to resolve the issue with the Electricity Supplier, a REC Issue is required to update Schedule 14 – Metering Operations.
I0347 Change Report (Proposal Plan) Approved
Company Name
Code Manager
Review status
Review required

Enabling Dual MSA & MSS (SVA MOA) appointments for WC connection types

Date of latest update
Type
Change
ID
R0342
Change Path
Priority
Urgent
No
Latest Update
26/10/2026 - The Consultation has closed. The Code Manager is assessing the responses.
Summary
Under the legacy/pre-MHHS arrangements the market is segmented by Measurement Class (MC) for settlement purposes which is not sensitive to the Meter type that is installed or is to be installed, meaning that the replacement of Traditional meters to either smart or Advanced metering equipment can be arranged without the need for the Change of Measurement Class (CoMC) process to be conducted concurrent with the meter exchange (MEX). Under MHHS, when a WC connection goes through a MEX from Traditional to Advanced, or from Advanced to Smart in the MHHS arrangements a new complexity is placed on suppliers because the CoSeg process must be tightly co-ordinated to a specified planned MEX date and processed through the MPRS within 3 Working Days of that date.
Proposer
Lee Stone
Change Report - Initial Assessment and Change Plan Report

Comments deadline
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
florentina.monea
Solution Development
Proposed Solution Document
Document title
R0342 Legal Drafting
Upload document
R0342 Legal Drafting V1.0 (1).docx
Archive
Off
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0342 submission form
R0342 Change Report (Proposal Plan and Consultation) v1.1 Approved
R0342 Consolidated Non-Confidential Consultation Responses
Company Name
Npower Commercial Gas Limited
Review status
Review required

Improved Validation for DI51599 - Electricity Smart Meter Equipment (ESME ID)

Date of latest update
Type
Issue
ID
I0341
Priority
Urgent
No
Latest Update
18/11/2026 - The Change Report (Proposal Plan) was approved by the REC Change Panel
Summary
A DNO has raised an issue with the ESME ID data stored in MPRS. Some of the ESMEs are passing MPRS basic validation but are being rejected by the proposed Metering Service preventing a change of service.
Proposer
Daniel Tadecicco
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Lead Analyst
Harry Firth
Solution Development
Problem Statement
A DNO has raised an issue with the ESME ID data stored in MPRS. Some of the ESMEs are passing MPRS basic validation but are being rejected by the proposed Metering Service preventing a change of service (Rejection of IF-033 with IF-035 Response R). Basic REC R032 Validation on IF-005/D0312: XX-XX-XX-XX-XX-XX-XX-XX (0-9, A-Z)
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Workgroup
Workgroup(s)
I0341 submission form
Change Report - Proposal Plan
Company Name
-
Review status
Review required

REC Change to align with BSC CP Clarify Supplier obligations for IF-002 messages where a Switch is cancelled

Date of latest update
Type
Change
ID
R0339
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
On 11 November 2026, the REC Metering Expert Panel voted, in line with the Code Manager’s recommendation, to approve this Change Proposal. The appeal window is now open until 25 November 2026. Subject to no appeal raised, R0339 will be implemented on 26 February 2027.
Summary
A BSC CP has been raised to clarify Supplier obligations for IF-002 messages where a Switch is cancelled. This obligation is also in REC Schedule 14 Metering Operations, so a REC change is required or the obligation remains in place.
Proposer
Caroline Freimuller
Change report - Final Change Report

Comments deadline
Change Plan

Proposal Plan approved by Change Panel

Completed

Start:

15 Sep 2026

Due:

15 Sep 2026

Completion:

15 Sep 2026
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Scheduled
EMAR Version 4.5.0_Scheduled
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Annabel Ashworth
Solution Development
Proposed Solution Document
Document title
R0339_Draft Schedule 14 v1.0
Upload document
R0339_Draft Schedule 14 v1.0.docx
Archive
Off
Problem Statement
BSC CP1646 has been raised to address ambiguity around Supplier obligations following receipt of IF-002 messages for cancelled registration Switch Requests. The same obligation exists within the REC, so a REC change is needed to align with the clarifications introduced by BSC CP1646, ensuring consistent interpretation and behaviour across industry.
Workgroup
Workgroup(s)
R0339 submission form
R0339 Change Report (Proposal Plan and Consultation) v1.0 Pre-Approval
R0339 Change Report (Proposal Plan and Consultation) v1.0 Approved 15.09.2026
R0339 Consolidated Consultation Responses v1.0
R0339 Change Report (Final Recommendation) v1.0 Pre Approval
R0339 Change Report (Final Recommendation) v1.0 Approved 11.11.26
Company Name
REC Code Manager / CCSG Representative
Review status
Review required

REC Change to align with CP1633 Capture Modem Module Details Under BSCP601

Date of latest update
Type
Issue
ID
I0338
Change Category
Priority
Urgent
No
Latest Update
06/08/2026 - Issue accepted in by the Code Manager
Summary
BSC CP1633 “Capture Modem Module Details Under BSCP601” makes amendments to BSCP601 Metering Protocol Approval and Compliance Testing. One of the amendments places obligations on MOAs where they are introducing and amending Communications Equipment. Equivalent and potentially expanded obligations need to be placed within REC Schedule 14 Metering Operations to support this.
Proposer
Lee Walker
Status
Implementation Status
Date Raised
Solution Development
I0338 submission form
Company Name
REC Code Manager / CCSG representative
Review status
Review required

Regulatory Alliance Creation Rejections

Date of latest update
Type
Change
ID
R0331
Change Category
Change Path
Priority
Urgent
No
Latest Update
20/10/2026 The Change Report (Update to Plan) was approved by the REC Change Panel on 20 October 2026, and the Issue progressed to a Change Proposal on 22 October 2026.
Summary
An incident where Network Parties did not submit Regulatory Alliances on time to the Central Switching Service (CSS) Provider, or did submit the Regulatory Alliances but did not action rejections from the CSS Provider in a timely manner, led to over 200 Consumers being delayed in Switching to their chosen Energy Supplier. This Change Proposal has been raised to review this process.
Change Plan

Change Report (Proposal Plan) approved at Change Panel

Completed

Start:

Due:

Completion:

18 Aug 2026

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

03 Sep 2026

Update to plan approved by Change Panel

Completed

Start:

Due:

Completion:

20 Oct 2026
Impacted Consumers
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
Poppy Mullins
Solution Development
Proposed Solution Document
Document title
I0331 Schedule 24 Switching Data Management
Upload document
I0331 Schedule 24 Switching Data Management v0.6.docx
Archive
Off
Problem Statement
The lack of Service Level Agreements (SLAs) on Network Parties to submit Regulatory Alliances to the CSS Provider or to work any rejections received from the CSS Provider can lead to delays in Consumers being able to Switch to their chosen Energy Supplier.
SME
SME Role
Lead Assurance Analyst
I0331 submission form
I0331 Change Report (Update to Plan) - Approved 20/10/26
I0331 Change Report (Proposal Plan) V1.0 approved 18.08.26
I0331 Consolidated Impact Assessment Responses v2.0
I0331 Update to Plan Approved 20.10.2026
Company Name
SQE Energy
Review status
Review required

Removal of D0383 & D0384 requirements from Sharing MTDs process

Date of latest update
Type
Change
ID
R0328
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/11/26 - This Change Proposal has been implemented as part of the 6 November 2026 REC Release.
Summary
Schedule 14 - Metering Operations currently holds obligations for a Meter Operator Agent (MOA) to send a D0383 ‘Notification of Commissioning Information’ to Electricity Suppliers, Distribution Network Operators (DNOs), Data Services and Data Collectors in certain process steps. The D0383 was not shared with these Parties in legacy arrangements, and there is no requirement for it to be sent to facilitate the MHHS arrangements. There are similar requirements to send the D0384 ‘Notification of Commissioning Status’ to these Parties, when it is only required by the Electricity Supplier. These requirements were introduced by the MHHS Design in error and need to be removed.
Proposer
Harriet Truss
Change report - Final Change Report

Comments deadline
Change Plan

Change Report (Proposal Plan) approved at Change Panel

Completed

Start:

Due:

Completion:

21 Jul 2026

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

06 Aug 2026

Change Report (For Consultation) presented to Metering Expert Panel

Completed

Start:

Due:

Completion:

12 Aug 2026

Final Recommendation approved at MEP

Completed

Start:

Due:

Completion:

14 Oct 2026
Impacted REC Documents
Status
Implementation Date
Status Live
EMAR Version 4.4.0
Included changes Affected REC Items
R0180 Clarity on use of on hold for switching issues, including the obligations of CSS Users
  • Schedule 26 - Switching Service Management
R0207 Import / Export MOA Charging Clarification
  • Schedule 14 - Metering Operations
R0253 Theft - DNO/Networks not providing photos
  • Schedule 8 - Unbilled Energy Code of Practice
R0261 Addition of Export flag in D0303 flows
R0266 REC Data Specification Clarifications
  • Schedule 14 - Metering Operations
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Data Item Catalogue
  • Market Message Catalogue
R0317 Number of Displayed Register Digits Data Item linkage
R0328 Removal of D0383 & D0384 requirements from Sharing MTDs process
  • Schedule 14 - Metering Operations
R0336 Legal text to support REC Change R0180
  • Schedule 26 - Switching Service Management
R0343 MSC - Amending Statement Production Timescales
R0345 Housekeeping November 2026

Documents

Name Version Last updated Actions
331.85 KB
Version 1.0 - 11 Nov 2026 PDF - 331.85 KB
1.0 11 Nov 2026
1.0 11 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0328 legal text V0.1
Upload document
R0328 legal text V0.1.zip
Archive
Off
Problem Statement
Schedule 14 - Metering Operations puts obligations on MOAs which are both not required and impossible to fulfil (as the Scenario Variants to send the D0383 from the MOA to the Electricity Supplier, DNO, Data Service and Data Collector do not exist). There are similar problems for the D0384, which is only required to be sent from the MOA to the Electricity Supplier.
R0328 submission form
R0328 Change Report (Proposal Plan) v1.0 - approved 21.07.26
R0328 Change Report (For Consultation) V1.0 approved 12.08.26
R0328 Consolidated Consultation Responses v1.0
R0328 Change Report (Final Recommendation) V1.0 Approved 14.10.26
Company Name
REC Code Manager
Review status
Review required

Introduction of Consumer Consent Service

Date of latest update
Type
Change
ID
R0318
Date of next activity
Change Category
Priority
Urgent
No
Latest Update
18/11/2026 - The Issue was progressed to Change Proposal on 17 November 2026. Following industry consultation on the REC drafting a number of refinements to the CCS design and drafting are being made. On progression to Change Proposal and Modification, the title has been updated to Introduction of Consumer Consent Service (not Solution) to reflect the new service that will be introduced.
Summary
This initiative will support the transformation of how energy is managed and consumed by giving consumers control over their energy (gas, electricity, heat, or other) data, enabling innovation through third-party services, and advancing sustainability goals. This REC Issue is being raised to promote visibility and awareness of opportunities for engagement, in advance of the CCS Change Proposal being progressed.
Proposer
consumerconsent
Change Plan

Proposal Plan (Approved)

Completed

Start:

02 Apr 2026

Due:

02 Apr 2026

Completion:

02 Apr 2026

Update to Plan (Approved)

Completed

Start:

30 Sep 2026

Due:

30 Sep 2026

Completion:

30 Sep 2026

Definition

Completed

Start:

02 Apr 2026

Due:

17 Nov 2026

Completion:

17 Nov 2026

Business Case Assessment

In Progress

Start:

18 Nov 2026

Due:

18 Dec 2026

Completion:

Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Next activity
Draft Modification Report to be issued to Stakeholder Advisory Forum
Solution Development
Proposed Solution Document
Document title
RECCo | Consumer Consent Programme page
Archive
Off
Document title
Consumer Consent Hub - REC Portal
Archive
Off
Document title
Consumer Consent Solution Design Consultation (March 2026)
Archive
Off
Document title
RECCo's response to the CCS Design Consultation - 28 May 2026
Archive
Off
Problem Statement
A new set of arrangements for a Consumer Consent Solution (CCS) is currently being developed under the RECCo CCS project. The new arrangements will need to be implemented within the REC so that they can be governed under the REC on an enduring basis.
Workgroup
Workgroup(s)
I0318 submission form
RECCHIG_26_0305 - I0318 Consumer Consent Solution
I0318 Change Proposal Re-Plan v2.0 APPROVED 30.09.2026.
I0318 Change Report (Proposal Plan) v1.0 APPROVED 02.04.2026
Company Name
Retail Energy Code Company Ltd
Review status
Review required

Review of export meter work arrangements

Date of latest update
Type
Change
ID
R0312
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
12/11/2026 The Party impact assessment has now opened until 23:59 on 04/12/2026
Summary
The REC Metering Operations Schedule has limited distinction between the activities for import and export metering. These provisions were not specifically developed to support a market with high volumes of small-scale microgeneration with shared metering assets for import and export.
Proposer
Jon Hawkins
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Problem Statement
There is a lack of distinction within REC Schedule 14 – Metering Operations between activities for Import and Export Metering, and how to manage work arrangements where is a shared Metering Asset between Import and Export Suppliers.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Workgroup
Workgroup(s)
I0312 submission form
I0312 Change Report (Proposal Plan) v1.0 Approved 21.04.26
Change Report (Update to Plan) V1.0 Pre-Approval 10.11.26
R0312 Process Maps and Proposed Solution Requirements
Company Name
-
Review status
Review required

Addition of value 11 to data item J0418

Date of latest update
Type
Change
ID
R0310
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
To add value 11 to the valid set value for data item J0418 – Meter COP. Unable to update Meter technical details (MTD's), the D0268 flow, as specified under BSCP603/7 via the DTN as the AMVLP. The appointed agent will not be able to automatically process or upload the flows received to their systems due to validation errors.
Proposer
Chris Herzog
Impacted REC Documents
Status
Implementation Date
Status Superseded
EMAR Version 4.3.0
Included changes Affected REC Items
R0267 Smart Meter Installation Surveys - Microbusiness requirements
  • Smart Meter Installation Schedule (since removed)
R0276 SFIC to CMRM - missing Scenario Variant in D0126 / MM00016
  • Market Message Catalogue
R0286 Clarification on Detailed Impact Assessment Activities
  • Schedule 5 - Change Management
R0291 Review of Schedule 1 Interpretations and Definitions
  • Schedule 1 - Interpretations and Definitions
R0299 Data Latency Targets for the GES Service Definition
R0300 Amendments to D0312 to align with BSC CP1622
  • Data Item Catalogue
R0307 Release and Licensing of the CoMCoP Logo for Accredited Parties
R0308 Update CCSG ToRs to include cross-code prioritisation as per Code Reform
R0310 Addition of value 11 to data item J0418
  • Data Item Catalogue
R0311 CoMCoP 2-year Audit Cycles
  • Schedule 15 - Metering Accreditation
R0316 Clarification of Data Items within the Payment Method Levelisation Supplier Data Reporting Specification
R0319 Clarification of in-year amendments to the CRS budget
R0320 Housekeeping June 2026
  • Schedule 1 - Interpretations and Definitions
  • Schedule 11 - Prepayment Arrangements
  • Schedule 7 - Energy Theft Reduction
  • Schedule 17 - Secure Data Exchange
  • Schedule 12 - Data Access
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
florentina.monea
Solution Development
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0310 submission form
R0310 Proposed changes to REC Data Specification
R0310 Change Report (Proposal Plan and Consultation) Approved 17.03.26
R0310 Consolidated Consultation Responses
R0310 Change Report (Final Recommendation) Post-vote
Company Name
EDF Energy
Review status
Review required