Schedule 14 - Metering Operations 6.4
– Implemented on
Loading...
Schedule 14 - Metering Operations 6.3
– Implemented on
Market Participant Applicability
| Market participant | All Sections |
|---|---|
| Domestic Suppliers | Mandatory |
| Non-Domestic Suppliers | Mandatory |
| Gas Transporters | Mandatory |
| Distribution Network Operators | Mandatory |
| DCC | N/A |
| Metering Equipment Managers | Mandatory |
| Non-Party REC Service Users | N/A |
Loading...
Data alignment of meter information through MHHS Migration
Date of latest update
Type
Issue
ID
I0240
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/04/2026 - The Code Manager has now published the I0240 - Scenario Guidance Document V2.0 on the REC Portal. This is available on the I0240 Proposal Page and the Market-wide Half Hourly Settlement Hub.
Summary
This Issue looks to address that when Meter updates are made during a Market Wide Half-Hourly Settlement (MHHS) migration, whilst the Meter Technical Details (MTDs) will be shared between participants, there will be no update sent to the Registration Service as the Gaining Meter Operator Agent (MOA) will not know that they need to send a D0312 (for reverse migration) or IF005 (for forward migration) and the Losing MOA cannot send the message.
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0240 - Data Alignment of Meter Information Through MHHS Migration - Scenario Guidance Document V2.0 (30.04.2026)
Upload document
I0240 - Scenario Guidance Document V2.0.pdf
Archive
Off
Problem Statement
During MHHS migration, key Market Messages from the Losing MOA, such as D0312, IF005, D0205, and D0139, are rejected by the Registration Service, preventing updates to meter details and Energisation status. This creates a risk of data misalignment, as the Gaining MOA may not be aware that updates occurred and therefore cannot resend them.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0240 - Submission Form
I0240 - Change Report (Proposal Plan) V1.0 (08.07.2025) Approved
Company Name
ESG Global
Review status
Review required
Missing Scenario Variants in D0179
Date of latest update
Type
Change
ID
R0235
Change Category
Change Path
Priority
Urgent
No
Latest Update
01/07/2025 - On 01 July 2025, the REC Change Panel voted to reject R0235 and approve R0235A, in line with the Code Manager's recommendation. The appeal window has closed.
Summary
Within MHHS SIT there is a scenario where the LDSO generates a D0139 to the MS for a PPM but the requirement is for the MS to generate a D0179. There is a gap in the D0179 data required and that provided on the D0139. 21.5.1 & 21.5.6 under Schedule 14 states that where the DNO changes the energisation status, within 3 WD of changing the energisation status the DNO will send the D0139 or the D0179(21.5.6) to the MS and then the MS will generate the D0179 to the Supplier(21.5.6). Currently, the LDSO only generates the D0179 to the Supplier but not to the MOP and the only change under MHHS is to add the new variant MSS.
Change Plan
Change Report (Proposal Plan) approved by Change Panel
Completed
Start:
Due:
Completion:
04 Mar 2025Presented at Change Issues Group
Completed
Start:
Due:
Completion:
06 Mar 2025Presented at Change Issues Group
Completed
Start:
Due:
Completion:
01 May 2025Presented at REC Change Panel
Completed
Start:
Due:
Completion:
20 May 2025Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
27 February 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0179 | Proposal for Limiting Queries in EES API Calls (Single Query per API Call) | |
| R0190 | Related Meter Point RMP status rules |
|
| R0198 | Metering Asset Manager (MAM) Communication Method Register | |
| R0242 | Missing Scenario Variant from R0043 |
|
| R0244 | C21 to be introduced into STIRG Document |
|
| R0235A | Missing Scenario Variants in D0179 Alternate Solution | |
| R0256 | MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101 |
|
| R0270 | Clarification of SIP Qualification Requirements |
|
| R0271 | Clarification of ASP, AMI, and EMO Accession Requirements |
|
| R0272 | Enabling transparency of the CRS Provider’s REC service level performance |
|
| R0277 | Data Latency SLA Alignment for Gas Enquiry Service |
|
| R0280 | CSS Certificate Authority audit clarification |
|
| R0283 | Annual Address Management Plan Updates |
|
| R0287 | Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations |
|
| R0293 | Housekeeping February 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0235 D0179 Missing Scenario Variants
Upload document
I0235 D0179 Missing Scenario Variants.pdf
Archive
Off
Document title
R0235 Data Specification V0.2
Upload document
I0235 D0179 Missing Scenario Variants V0.2.pdf
Archive
Off
Problem Statement
DNOs and MOAs cannot fulfil their full obligations listed in Schedule 14 Metering Operations as there missing Scenario Variants in the Data Specification preventing them from sending the D0179 to all required Parties.
Stages Selection
I0235 Change Proposal Form
I0235 Change Report (Proposal Plan) V1.0 Approved 04.03.25
I0235 Consolidated Impact Assessment Responses V1.0
R0235 and R0235A Change Report (For Consultation) V1.1
R0235 and R0235A Consolidated Consultation Responses PUBLIC V1.0
R0235 and R0235A Change Report (Final Recommendation) V2.0 (Approved) 01.07.2025
Company Name
ESG Global
Review status
Review required
Schedule 14 - Metering Operations 6.2
– Implemented on
Loading...
Schedule 14 - Metering Operations 6.1
– Implemented on
Loading...
Import / Export MOA Charging Clarification
Date of latest update
Type
Change
ID
R0207
Change Category
Priority
Urgent
No
Latest Update
06/11/26 - This Change Proposal has been implemented as part of the 6 November 2026 REC Release.
Summary
BSC Mod 459 and REC CP R0144 were raised to allow different MOAs to be appointed for the import and export MPANs on a shared meter. One of the justifications for this was to stop export suppliers being charged inflated rates. Both changes have been placed on hold due to the MHHS Programme so this change has been raised to specifically resolve the charging issue.
Change Plan
Final recommendation to Metering Expert Panel
Completed
Start:
Due:
Completion:
12 Mar 2025Sent to Authority for determination
Completed
Start:
Due:
Completion:
13 Mar 2025Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
06 November 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0180 | Clarity on use of on hold for switching issues, including the obligations of CSS Users |
|
| R0207 | Import / Export MOA Charging Clarification |
|
| R0253 | Theft - DNO/Networks not providing photos |
|
| R0261 | Addition of Export flag in D0303 flows | |
| R0266 | REC Data Specification Clarifications |
|
| R0317 | Number of Displayed Register Digits Data Item linkage | |
| R0328 | Removal of D0383 & D0384 requirements from Sharing MTDs process |
|
| R0336 | Legal text to support REC Change R0180 |
|
| R0343 | MSC - Amending Statement Production Timescales | |
| R0345 | Housekeeping November 2026 |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 11 Nov 2026 | ||
| 1.0 | 11 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Schedule 14 - Metering Operations R0207 v0.1
Upload document
Schedule 14 - Metering Operations R0207 draft.docx
Archive
Off
Document title
Schedule 14 - Metering Operations R0207 v0.2
Upload document
Schedule 14 - Metering Operations R0207 v0.2.docx
Archive
Off
Problem Statement
Where the same electricity Metering Asset is being used for the measurement of Import and Export for more than one Metering Point, the Export MOA must be the same as the Import MOA. This may result in uncompetitive charging by the MOA, as the Export Supplier has no choice in their appointment.
Stages Selection
Change Proposal Form
R0207 - Change Report (Proposal Plan - Approved) V2.0 15.10.2024
R0207 Consolidated Impact Assessment Responses PUBLIC V1.0
R0207 Extension to Plan v1.0
R0207 Change Report (For Consultation) v1.0
R0207 Consolidated Consultation Responses PUBLIC V1.0
R0207 Change Report (Final Recommendation) V1.0 Post Vote
Authority Decision Letter - Ofgem Decision to Send Back R0207 (30.05.2025)
R0207 Revised Solution - Legal Text
R0207 Change Report (Impact Assessment) Revised Solution V2.0
Legal Drafting Revised Solution March 2026
Non Confidential consolidated impact assessment responses
R0207 Consolidated Consultation Responses (revised solution)
Authority decision to approve R0207
Company Name
Gemserv
Review status
Review required
Schedule 14 - Metering Operations 6.0
– Implemented on
Market Participant Applicability
| Market participant | All Sections |
|---|---|
| Domestic Suppliers | Mandatory |
| Non-Domestic Suppliers | Mandatory |
| Gas Transporters | Mandatory |
| Distribution Network Operators | Mandatory |
| DCC | N/A |
| Metering Equipment Managers | Mandatory |
| Non-Party REC Service Users | N/A |
Loading...
Addition of MEMs to the Gas Enquiry Service (GES) API
Date of latest update
Type
Issue
ID
I0195
Urgent
No
Latest Update
16/10/2024 - This Change Issue has been rejected as is already being progressed under the data access change process implemented as R0118.
Summary
Empty
Status
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
Stages Selection
I0195-~1.doc
Company Name
Code Manager
Review status
Review required
Review of Metering Asset data transferred from MAMs to the CDSP
Date of latest update
Type
Issue
ID
I0196
Change Path
Priority
Urgent
No
Latest Update
10/09/2026 - The Metering Expert Panel approved the extension to plan for I0196. This REC Issue is now placed on hold.
Summary
It has emerged that a high proportion of gas Data Items contain mismatches when comparing between Metering Asset Managers (MAM), Gas Suppliers, and the Central Data Service Provider. This Issue seeks to explore this issue and identify mechanisms by which these mismatches may be resolved.
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
Work conducted by RPA has identified a significant number of mismatches between gas Data Items held by key stakeholders. This may result in Consumer detriment, as information relevant to an MPRN may not be held accurately by any given Party. As such, there is a need to review processes pertaining to the communication of gas data by MAMs onward to the CDSP to mitigate the potential for mismatches.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0196 Issue Proposal Form (Word)
I0196 Issue Proposal Form (PDF)
I0196 Change Report (Plan) (Approved) V2.0 07.05.25
I0196 Change Re-Plan (Approved) V1.0 02.05.25
I0196 Change Re-Plan V2.1 (Approved) 09.09.26
Company Name
-
Review status
Review required