Agile Reporting within CSS

Date of latest update
Type
Change
ID
R0224
Change Path
Priority
Urgent
No
Latest Update
23/09/2026 - An update to plan has been published for consideration at the Technical Expert Panel on 30 September 26.
Summary
As part of the impact assessment process for R0115, it was identified that it is very costly and time consuming to make reporting changes within the CSS architecture. As such, we would like to explore enabling agile reporting within the CSS ecosystem, by creating a functionality that consolidates all necessary data into a single, centralised database.
Proposer
Maxime Eyseren
Change report - Final Change Report
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
holly.law
Solution Development
Problem Statement
Current CSS arrangements mean that REC Changes designed to facilitate access to CSS data are more onerous that they need to be. Current arrangements are costly and have relatively long lead-times. This Issue seeks to explore changing the way that the CSS data can be accessed.
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Proposal Form - Agile reporting within CSS
I0224 Change Report (Plan) (Approved) V1.0 21.01.25
Change Proposal Re-Plan Approved
Solution/Business Case report
R0224 update to plan 18.03.26
R0224 update to plan 19 May 2026
R0224 Update to plan September 2026
Company Name
REC Technical Services
Review status
Review required

Non dual-fuel Gas PSR Consumer

Date of latest update
Type
Issue
ID
I0186
Change Category
Change Path
Priority
Urgent
No
Latest Update
02/09/2025 - the Change Panel approved placing this Issue on hold while the proposer progresses a sandbox trial
Summary
Non dual-fuel Consumers who register upon the PSR, will have their PSR data flow across energy industry data flows to mean that all parties are aware of any PSR Needs Codes, allowing us all to provide equal access to our services and support. This will be achieved via the utilisation of existing processes and systems. Initially a pilot will take place for a minimum of 3 months between participating companies before extending this to the whole industry”.
Proposer
Ben Atkinson
Change Report - Initial Assessment and Change Plan Report
Impacted Consumers
Impacted REC Services
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Problem Statement
The majority of domestic customers in the UK are what are called in the industry ‘dual-fuel’ - this means that with two types of energy (electricity & gas) a domestic dwelling has a single supplier ie they pay their bill to one organisation. This ‘dual-fuel’ position has supported the industry improvements to Priority Services Register (PSR) data flows by allowing previous divides to be overstepped in terms of data flows between energy types. There is however a problem which this RECC request aims to resolve. That is, where a customer who has both fuel types, also has two suppliers and they want to register upon the PSR. This was always a ‘known’ gap shared with our regulator when the many improvements were implemented across the PSR and considered to be something that would be addressed at a later date. This ‘gap’ means that without the dual-fuel link, currently data flows do not complete across energy types via the supplier data flow triggers.
Change Proposal Form - Non dual-fuel Gas PSR Customer
I0186 - Change Report (Proposal Plan) V1.0 (Approved) 18.02.2025
Company Name
British Gas
Review status
Review required

Introducing Third Party Intermediary (energy broker) assurance and accreditation

Date of latest update
Type
Change
ID
R0137
Change Category
Urgent
No
Latest Update
16/05/2025 - The Authority has published their decision to reject R0137 and R0137A.
Summary
This change seeks to expand the obligation for Energy Suppliers to only work with TPIs who are adhering to principles as set out in the REC TPI Code of Practice to all Non-Domestic Consumers. It also looks to reduce the burden on Energy Suppliers having to perform their own audits by introducing a REC Services Accreditation Scheme and allowing companies to qualify as an Industry-Recognised Accreditation Body.
Proposer
Jon Dixon
Change Plan

Service Provider Impact Assessment opens

Completed

Start:

20 Jul 2023

Due:

05 Jul 2024

Completion:

05 Jul 2024

Service Provider Impact Assessment closes

Completed

Start:

05 Jul 2024

Due:

09 Aug 2024

Completion:

06 Aug 2024

Party Impact Assessment opens

Completed

Start:

09 Aug 2024

Due:

16 Aug 2024

Completion:

15 Aug 2024

Party Impact Assessment closes

Completed

Start:

16 Aug 2024

Due:

09 Sep 2024

Completion:

09 Sep 2024

Preliminary Change Report Issued

Completed

Start:

09 Sep 2024

Due:

08 Oct 2024

Completion:

08 Oct 2024

Responsible Committee Review

Completed

Start:

08 Oct 2024

Due:

15 Oct 2024

Completion:

15 Oct 2024

Consultation opens

Completed

Start:

15 Oct 2024

Due:

18 Oct 2024

Completion:

17 Oct 2024

Consultation closes

Not Started

Start:

18 Oct 2024

Due:

08 Nov 2024

Completion:

Responsible Committee Decision

Not Started

Start:

10 Dec 2024

Due:

17 Dec 2024

Completion:

Final Change Report issued

Not Started

Start:

08 Nov 2024

Due:

10 Dec 2024

Completion:

Sent to Authority for Determination

Not Started

Start:

17 Dec 2024

Due:

18 Dec 2024

Completion:

Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Non-Domestic Consumer, I want to work with TPIs who are demonstrating best practice standards within the market.
  2. As a Non-Domestic Energy Supplier, I want clear obligations around my use of TPIs so I can demonstrate best practice standards within the market and ensure my audit obligations are met.
  3. As RECCo, I want to provide an assurance and accreditation scheme to register TPIs to remove the burden of Suppliers having to individually audit TPIs.
  4. As a Third Party Intermediary, I want clear obligations so I can become accredited and assure that Suppliers and Non-Domestic Consumers are receiving best practice standards within the market.
Proposed Solution Document
Document title
Legal Text for Party IA.zip
Upload document
Legal Text for Party IA.zip
Archive
Off
Document title
R0137 Legal Text for Consultation
Upload document
R0137 Legal Text for Consultation.zip
Archive
Off
Document title
R0137 Legal Text - Final
Upload document
R0137 Final Legal Text (1).zip
Archive
Off
Problem Statement
Non-Domestic Consumers have more limited protections than Domestic and Microbusiness Consumers in the energy market, and so may not always experience best practice from all parties they interact with. The aim is to expand these protections while limiting the audit burdens on Suppliers and TPIs.
Stages Selection
SME
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
R0137 - Change Proposal Form External
R0137 Change Proposal Plan v1.0 (Approved)
R0137 Initial Assessment Report v1.1 (Approved)
R0137 Consolidated Impact Assessment Responses PUBLIC
R0137 and R0137A Change Report (For Consultation) V1.0
R0137 &R0137A Consolidated Consultation Responses PUBLIC v1.0
R0137 and R0137A Change Report (Post Vote) V1.0
Authority decision on REC modification proposal R0137 and R0137A
Company Name
RECCo
Review status
Review required

Frequency and content of CSS reports on switching via the DCC portal

Date of latest update
Type
Change
ID
R0115
Change Category
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
This change has been raised by Ofgem to make updates to CSS reports provided by the Switching Operator; for these be provided on a weekly basis and be designed in such a way that only genuine Switches between Suppliers are reported. At present the latter is not possible as all switches at MPID level are reported with no indication of switching flows.
Proposer
Monica Gandolfi
Change Plan

Preliminary Change Report published

Completed

Start:

27 Apr 2023

Due:

15 Dec 2023

Completion:

15 Dec 2023

Consultation issued

Completed

Start:

15 Dec 2023

Due:

15 Dec 2023

Completion:

15 Dec 2023

Consultation close

Completed

Start:

15 Dec 2023

Due:

19 Jan 2024

Completion:

19 Jan 2024

Final Change Report published

Completed

Start:

19 Jan 2024

Due:

26 Jan 2024

Completion:

26 Jan 2024

Responsible Committee Decision

Completed

Start:

26 Jan 2024

Due:

06 Feb 2024

Completion:

06 Feb 2024

Send to Authority for determination

In Progress

Start:

06 Feb 2024

Due:

07 Feb 2024

Completion:

Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.14.0_Superseded
Included changes Affected REC Items
R0108 Enabling Electricity Enquiry Service searches using a Unique Property Reference Number
R0113 Data Specification updates and clarifications
R0115 Frequency and content of CSS reports on switching via the DCC portal
R0119 Annulment Definition
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0150 On-site Aggregation as a method to facilitate Third Party Access - BSC P455
  • Schedule 1 - Interpretations and Definitions
  • Schedule 25 - Central Switching Service
R0049 Intellectual Property Rights and Services Data Main Body changes
R0092A DCC Service Level Agreements for the Switching Incentive Regime (Alternative)
R0203 CSS Retry Strategy
  • Schedule 24 - Switching Data Management
R0206 Cross code change to align with BSC CP1598
  • Market Message Catalogue
R0211 November 2024 House Keeping Change
R0069 Amendments to Sample Access Agreement
  • Schedule 9 - Qualification and Maintenance
R0094 Clarify obligations on gas meter exchanges that occur close to CoS
  • Schedule 14 - Metering Operations
  • Market Message Catalogue
R0098 Optional fuzzy searching in EES

Documents

Name Version Last updated Actions
199.57 KB
Version 1.0 - 02 Nov 2026 PDF - 199.57 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want Ofgem to effectively monitor the market to ensure the right policy decisions are made.
  2. As Ofgem, I need accurate and timely data to ensure that I can make informed decisions on any interventions in relation to market stability.
Proposed Solution Document
Document title
Attachment A_R0115 Solution Requirements Matrix v2.0
Upload document
Attachment A_R0115 Solution Requirements Matrix v2.0 (1).xlsx
Archive
Off
Document title
Attachment B_R0115 Report Templates v1.0
Upload document
Attachment B_R0115 Report Templates v1.0 (1).xlsx
Archive
Off
Document title
Switching Operator (SO) Service Definition_redline 15.12.2023
Upload document
Switching Operator (SO) Service Definition_redline 15.12.2023.docx
Archive
Off
Problem Statement
Without appropriate reporting, Ofgem cannot effectively monitor the level of Switching in the market in a timely and accurate manner. This hinders its ability to act and inform any policy interventions in relation to market stability.
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
R0115 - Change Proposal Form
R0115 - Change Proposal Plan v2.0 (Approved) 05.12.2023
R0115 Initial Assessment Report v2.0 (Approved) 05.12.2023
R0115 - Preliminary Change Report v1.0 (Published for Consultation) 15.12.2023
R0115 - Consolidated Consultation Responses_Non Confidential (26.01.2024)
R0115 - Final Change Report v1.0 (Post-Vote) 06.02.2024
R0115 Authority Decision (23.04.2024)
Company Name
Ofgem
Review status
Review required

Provision of Grid Supply Point Group ID from a Postcode search in EES

Date of latest update
Type
Change
ID
R0111
Change Category
Change Path
Priority
Urgent
No
Latest Update
05/04/2024 - The Code Manager has rejected the progression of R0111 as Postcode itself does not always have a direct correlation to the GSP Group and believes that a full address should be provided so that accurate quotes are given to a Consumer.
Summary
Empty
Proposer
Andrew Dawson
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
R0111 - CP Form (Downloadable version)
Company Name
GB Group plc
Review status
Review required

ERDS Upload File in the Data Specification and clarification of cancellation code

Date of latest update
Type
Change
ID
R0086
Priority
Urgent
No
Latest Update
06/11/2023 - Withdrawal adoption window closed.
Summary
The MPAS/ERDS Upload file has historically been a part of the Data Specification however during transition from the MRA, the process has been omitted. This change seeks to restore the file to the specification. Secondly, the file previously provided a cancellation reason code for Switches. Under the current REC arrangements (i.e. since CSS go live) Reason codes are not provided and have been defaulting to W which indicated a reason of “withdrawn” which may now be misleading. This Change Proposal has been raised to address these issues
Proposer
admin
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
R0086 - Change Proposal Form (downloadable version)
Company Name
-
Review status
Review required

CSS Market Message Retry Strategy

Date of latest update
Type
Change
ID
R0081
Priority
Urgent
No
Latest Update
15/11/2023 - Change Proposal has been withdrawn. Market message success data for September 2023 was reviewed to ensure that a stable period was analysed which represented ‘normal’ conditions. Upon completion of the review, it has been concluded that the success of the current retry strategy has significantly improved since this change proposal was raised. The Code Manager will introduce cyclical reviews of performance to ensure this continues at the expected levels.
Summary
The prescriptive nature of the Market Message retry drafting is currently impeding on the CSS Service Provider’s ability to ensure all Market Messages are sent and received successfully between the CSS and the CSS User. This CP proposes a move to a principles-based obligation that allows for flexibility to ensure the CSS and CSS User are able to attempt retries but not have to follow specific timings or have a maximum number of retries.
Proposer
admin
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
R0081 - Change Proposal Form
Proposed legal text submitted with the CP
Company Name
-
Review status
Review required
Schedule 24 - Switching Data Management 1.1 – Implemented on
Market Participant Applicability
Market participant All Sections
Domestic Suppliers Mandatory
Non-Domestic Suppliers Mandatory
Gas Transporters Mandatory
Distribution Network Operators Mandatory
DCC Mandatory
Metering Equipment Managers Mandatory for CSS Users
Non-Party REC Service Users Mandatory for CSS Users