Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues 2.0
– Implemented on
Market Participant Applicability
| Market participant | Section A: General Obligations | Section B: Erroneous Switches | Section C: Switch Meter Reading Problems | Section D: Crossed Meters | Section E: Duplicate RMPs | Section F: Misdirected Payments | Section G: Debt Assignment | Section G, Annex - Format of DAP Spreadsheet to Support Invoicing |
|---|---|---|---|---|---|---|---|---|
| Domestic Suppliers | Mandatory | Mandatory | Mandatory for NHH Electricity1 and for Gas | Mandatory | Mandatory | Mandatory | Mandatory | Mandatory |
| Gas Non-Domestic Suppliers | Mandatory | Voluntary | Voluntary | Voluntary | Voluntary | Voluntary | N/A | N/A |
| Electricity Non-Domestic Suppliers | Mandatory | Mandatory for NHH1 | Mandatory for NHH1 | Mandatory | Mandatory | Mandatory | N/A | N/A |
| Gas Transporters | Mandatory | N/A | N/A | Mandatory | Mandatory | N/A | N/A | N/A |
| Distribution Network Operators | Mandatory | N/A | N/A | Mandatory | Mandatory | N/A | N/A | N/A |
| DCC | Mandatory | N/A | N/A | N/A | N/A | N/A | N/A | N/A |
| Metering Equipment Managers | N/A | N/A | N/A | Mandatory | Mandatory | N/A | N/A | N/A |
| Non-Party REC Service Users | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A |
Loading...
Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues 1.1
– Implemented on
Market Participant Applicability
| Market participant | Section A: General Obligations | Section B: Erroneous Switches | Section C: Switch Meter Reading Problems | Section D: Crossed Meters | Section E: Duplicate RMPs | Section F: Misdirected Payments | Section G: Debt Assignment | Section G, Annex - Format of DAP Spreadsheet to Support Invoicing |
|---|---|---|---|---|---|---|---|---|
| Domestic Suppliers | Mandatory | Mandatory | Mandatory for NHH Electricity1 and for Gas | Mandatory | Mandatory | Mandatory | Mandatory | Mandatory |
| Gas Non-Domestic Suppliers | Mandatory | Voluntary | Voluntary | Voluntary | Voluntary | Voluntary | N/A | N/A |
| Electricity Non-Domestic Suppliers | Mandatory | Mandatory for NHH1 | Mandatory for NHH1 | Mandatory | Mandatory | Mandatory | N/A | N/A |
| Gas Transporters | Mandatory | N/A | N/A | Mandatory | Mandatory | N/A | N/A | N/A |
| Distribution Network Operators | Mandatory | N/A | N/A | Mandatory | Mandatory | N/A | N/A | N/A |
| DCC | Mandatory | N/A | N/A | N/A | N/A | N/A | N/A | N/A |
| Metering Equipment Managers | N/A | N/A | N/A | Mandatory | Mandatory | N/A | N/A | N/A |
| Non-Party REC Service Users | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A |
Loading...
DNOs notifying Suppliers about Crossed Meters
Date of latest update
Type
Change
ID
R0076
Priority
Urgent
No
Latest Update
28/05/2024 - R0076 has been withdrawn as the issue was addressed through R0121 - SDEP Review Improvements (1) - Process Types. The adoption window is closed.
Summary
The Change seeks to introduce a way for the DNOs to raise a crossed meter issue with the Supplier, in a way that directly feeds into the Supplier’s list of crossed meter issues. The supplier will be required to feed back progress to the DNO who has raised the issue with them, this should be defined as a process within the REC.
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
R0076 - Change Proposal Form v1.0
Company Name
-
Review status
Review required
Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues 1.0
– Implemented on
Market Participant Applicability
| Market participant | Section A: General Obligations | Section B: Erroneous Switches | Section C: Switch Meter Reading Problems | Section D: Crossed Meters | Section E: Duplicate RMPs | Section F: Misdirected Payments | Section G: Debt Assignment |
|---|---|---|---|---|---|---|---|
| Domestic Suppliers | Mandatory | Mandatory | Mandatory for NHH Electricity1 and for Gas | Mandatory | Mandatory | Mandatory | Mandatory |
| Gas Non-Domestic Suppliers | Mandatory | Voluntary | Voluntary | Voluntary | Voluntary | Voluntary | N/A |
| Electricity Non-Domestic Suppliers | Mandatory | Mandatory for NHH1 | Mandatory for NHH1 | Mandatory | Mandatory | Mandatory | N/A |
| Gas Transporters | Mandatory | N/A | N/A | Mandatory | Mandatory | N/A | N/A |
| Distribution Network Operators | Mandatory | N/A | N/A | Mandatory | Mandatory | N/A | N/A |
| DCC | Mandatory | N/A | N/A | N/A | N/A | N/A | N/A |
| Metering Equipment Managers | N/A | N/A | N/A | Mandatory | Mandatory | N/A | N/A |
| Non-Party REC Service Users | N/A | N/A | N/A | N/A | N/A | N/A | N/A |
Loading...
REC V3.0
Date of latest update
Type
Change
ID
R0041
Change Category
Urgent
Yes
Latest Update
-
Summary
-
Change Plan
Legal text baselined
Completed
Start:
10 Apr 2022Due:
13 May 2022Completion:
13 May 2022Final Change Report Issued
Completed
Start:
13 May 2022Due:
20 May 2022Completion:
20 May 2022Responsible Committee Decision
Completed
Start:
20 May 2022Due:
07 Jun 2022Completion:
07 Jun 2022Authority Determination (Original)
Completed
Start:
07 Jun 2022Due:
20 Jun 2022Completion:
17 Jun 2022Authority Determination (revoked and re-issued)
Completed
Start:
20 Jun 2022Due:
29 Jun 2022Completion:
29 Jun 2022Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
18 July 2022
| Included changes | Affected REC Items | |
|---|---|---|
| R0038 | Performance Assurance Report Catalogue Changes as a consequence of REC V3.0 | |
| R0041 | REC V3.0 |
|
| R0042 | Performance Assurance Board Terms of Reference |
|
| R0045 | Changes to SDEP Messages and Schedule numbering for REC V3.0 |
|
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 16 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
- As a Consumer, I want to be able to successfully switch my Energy Supplier with minimal delay or hassle, so that I can start to receive the service and tariff from my chosen Energy Supplier at the earliest opportunity.
- As the Authority, I want the necessary changes made to the Retail Energy Code to introduce the obligations, processes and provisions for the new switching arrangements, to enable the successful transition to enduring governance and operational arrangements.
- As a REC Party, I want to be clear on the obligations I need to meet and the processes I need to follow post CSS go live, to ensure my organisation is ready for the introduction of the new switching arrangements.
- As a REC Service Provider, I want to be clear on the obligations, processes and service standards that I need to meet, to ensure my organisation is ready for the introduction of the new switching arrangements.
Proposed Solution Document
Document title
REC V3.0 Baselined documents
Upload document
R0041 Legal Text.zip
Archive
Off
Document title
REC v3.0 Baselined documents (REC Portal)
Archive
Off
Problem Statement
Changes are required to the REC, to ensure the appropriate obligations, processes and provisions are defined within the REC at CSS go-live, enabling successful transition to enduring governance and operational arrangements developed as part of Ofgem’s Switching Programme.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0041 - Change Proposal Form
Letter from the Authority to the REC Code Manager - REC V3.0 Authority Change Proposal
R0041 - Change Proposal Plan v1.0 (Approved)
R0041 - Initial Assessment Report v2.0 (Approved)
R0041 - Final Change Report v3.0 (Post-Vote)
R0041 Authority Decision
Company Name
Ofgem
Review status
Review required
Erroneous Transfer Cancellations
Date of latest update
Type
Change
ID
R0030
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/06/2023 - This change was implemented on 30 June 2023 as part of the June 2023 REC Release
Summary
Erroneous Switches (ESs) are currently being cancelled without a defined process or full audit trail. This Change Proposal seeks to introduce a defined process for Energy Suppliers to be able to cancel an ES in specific scenarios.
Change Plan
Solution Development
Completed
Start:
13 Jan 2022Due:
22 Apr 2022Completion:
22 Apr 2022Party Impact Assessment Issued
Completed
Start:
22 Apr 2022Due:
06 May 2022Completion:
06 May 2022Preliminary Change Report Issued
Completed
Start:
06 May 2022Due:
08 Jul 2022Completion:
08 Jul 2022Responsible Committee Review
Completed
Start:
08 Jul 2022Due:
19 Jul 2022Completion:
19 Jul 2022Consultation Issued
Completed
Start:
19 Jul 2022Due:
05 Aug 2022Completion:
05 Aug 2022Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
30 June 2023
| Included changes | Affected REC Items | |
|---|---|---|
| R0101 | Revision of the Implementation Date and approved solution for R0021 |
|
| R0102 | Revision of the approved solution for R0032 |
|
| R0114 | Housekeeping amendments |
|
| R0015 | Remote communication obligations for electricity Advanced Meters |
|
| R0010 | New Meter Types for Auxiliary Proportional Controllers (APCs) |
|
| R0011 | Reporting of Additional EMR Backing Data to Suppliers |
|
| R0021 | Allowing REC accredited MEMs to de-energise and re-energise supply points independent of the Supplier |
|
| R0030 | Erroneous Transfer Cancellations |
|
| R0066 | Inclusion of SMRS Data Items in EES (BSC CP1568 Consequential Change) | |
| R0032 | New Registration data items and processes to support the transition to Market-wide Half-Hourly Settlement (MHHS) |
|
| R0090 | Alignment of Data Specification with Pre-REC Rules and Consequential Impacts on R0011 Legal Text |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- As a Consumer I want to receive my bills when expected, from the Supplier of my choice without delays caused by being switched incorrectly and not being resolved in a timely manner. As a Consumer, in the event that my Supplier has exited the market and my supply cannot be returned to my original Supplier, I want the Gaining ET Supplier to have the ability to terminate any ET process that has already been initiated so that I am able to choose my preferred Supplier and switch without delay or penalty.
- As a Consumer, if Energy Suppliers need to share my data to resolve a switching issue, I want Suppliers to share my personal data securely so that my data is protected.
- As an Energy Supplier, where appropriate, I need to be able to cancel an ET effectively and efficiently, so that I can bill my Consumers accurately and timely. As an Energy Supplier, where appropriate, I need to be able to cancel an ET so that I supply Consumers with whom I have a valid contract.
- As The Code Manager I need to be able to identify when an ET has been cancelled so that I have a clear audit trail and can monitor performance effectively.
Proposed Solution Document
Document title
R0030 Pre Consultation Solution Documents
Upload document
R0030 - Consultation Solution Documents (1).zip
Archive
Off
Document title
R0030 - Final Solution Documents
Upload document
Final Solution (1).zip
Archive
Off
Document title
R0030 - EMAR Change Set (Final)
Archive
Off
Problem Statement
Erroneous Transfers are being cancelled by Suppliers, which is currently not permitted under the REC. There is no consistent defined process or audit trail. In the event of a Supplier of Last Resort (SoLR) being appointed, or on a Change of Occupier at a premise, the Gaining Supplier currently has no way to formally cancel an ET after it has been initiated. This can cause Switching and/or Billing delays for Consumers whilst Energy Suppliers attempt to resolve an outstanding or open ET. For Energy Suppliers this can mean they are supplying Consumers with whom they have no Valid Contract, resulting in additional Guaranteed Standards of Performance (GSOP) Payments and increased Consumer dissatisfaction. The Performance Assurance Board (PAB) has no way to identify the difference between the process legitimately closing without resolution, and an Energy Supplier not meeting their obligations in the code to properly resolve an ET. As a result, the PAB are unable to differentiate the performance of Energy Suppliers between those that are closed down legitimately or those being closed inappropriately.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
Erroneous Transfer Cancellations - Change Proposal Form
R0030 - Consolidated Impact Assessment Responses
R0030 Change Proposal Plan v1.0 (Approved)
R0030 - Initial Assessment Report v1.0 (Approved)
R0030 - Preliminary Change Report v2.0 (Approved)
Non Confidential Consultation Responses
R0030 Final Change Report v2.0 (Post-Vote)
Company Name
Scottish Power
Review status
Review required