Schedule 25 - Central Switching Service 1.4
– Implemented on
Market Participant Applicability
| Market participant | Main | Appendix 1 Senior Responsible Officer / Appointed Responsible Officer / Technical Contact Validation Procedures | Appendix 2 Roles Privilege Table |
|---|---|---|---|
| Electricity Suppliers | Mandatory | Mandatory | Mandatory |
| Gas Suppliers | Mandatory | Mandatory | Mandatory |
| Distribution Network Operators | Mandatory | Mandatory | Mandatory |
| Gas Transporters | Mandatory | Mandatory | Mandatory |
| DCC | Mandatory | Mandatory | Mandatory |
| Metering Equipment Managers | Mandatory for CSS Users | Mandatory for CSS Users | Mandatory for CSS Users |
| Non-Party REC Service Users | Mandatory | Mandatory for CSS Users | Mandatory for CSS Users |
Loading...
Enabling transparency of the CRS Provider’s REC service level performance
Date of latest update
Type
Change
ID
R0272
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
RECCo regularly reports on the performance of REC Service Providers in relation to their activities under the REC. However, there is currently no formal agreement to permit the publication of CRS performance measures between the CRS Provider and RECCo. Due to the multi-Party agreement, the REC does not specifically address the publication of this performance data. Instead, RECCo are operating under an informal understanding with the CRS Provider, which means there is a possibility that publication may be delayed or not agreed to in a given month. RECCo is dependent on the CRS Provider’s approval for each publication, which can cause delays. This approval could also be withheld at any point.
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Date
27 February 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0179 | Proposal for Limiting Queries in EES API Calls (Single Query per API Call) | |
| R0190 | Related Meter Point RMP status rules |
|
| R0198 | Metering Asset Manager (MAM) Communication Method Register | |
| R0242 | Missing Scenario Variant from R0043 |
|
| R0244 | C21 to be introduced into STIRG Document |
|
| R0235A | Missing Scenario Variants in D0179 Alternate Solution | |
| R0256 | MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101 |
|
| R0270 | Clarification of SIP Qualification Requirements |
|
| R0271 | Clarification of ASP, AMI, and EMO Accession Requirements |
|
| R0272 | Enabling transparency of the CRS Provider’s REC service level performance |
|
| R0277 | Data Latency SLA Alignment for Gas Enquiry Service |
|
| R0280 | CSS Certificate Authority audit clarification |
|
| R0283 | Annual Address Management Plan Updates |
|
| R0287 | Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations |
|
| R0293 | Housekeeping February 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- An update to the REC Schedule 6 – Performance Assurance.
Proposed Solution Document
Document title
R0272 Approved legal text (26.01.2026)
Upload document
I0272 draft legal text_v1.1.docx
Archive
Off
Problem Statement
Unlike REC Service Providers, there is currently no formal agreement in place between the CRS Provider and RECCo to publish details about the CRS Provider’s performance. RECCo is therefore dependent on the CRS Provider’s approval for each publication. Not only could there be delays in RECCo’s reporting, but the approval could also be withheld at any point, preventing RECCo’s reporting.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0272 Change Proposal Form
R0272 Consolidated Consultation responses V1.0
Company Name
Code Manager / RECCo
Review status
Review required
Schedule 25 - Central Switching Service 1.3
– Implemented on
Loading...
Schedule 25 - Central Switching Service 1.2
– Implemented on
Loading...
Implementation of Online Certificate Standard Protocol (OCSP) in addition to Certificate Revocation List (CRL).
Date of latest update
Type
Change
ID
R0151
Change Category
Change Path
Priority
Urgent
No
Latest Update
14/05/2024 - At the request of the proposer, this Change Proposal has now been withdrawn. The rationale for withdrawing the proposal was that the benefits afforded by this change will not be fully realised until 2026 (renew of digital certificates), and the risk profile around revoked certificates remains unchanged during this period. DCC recommend this change is revisited in 12 months, to allow sufficient time for review and resubmission ahead of any certificate renewal activities.
Summary
This Change seeks to make improvements to the Microsoft Azure Application Gateway module. A defect has been identified which requires the implementation of a manual/ customer workaround when checking the Certificate Revocation Lists (CRLs) systems within the Central Switching Service (CSS) to ensure certificates are revoked. This change seeks to remove the need to complete a manual workaround and implement a real-time certification validation capability.
Change Plan
Solution Analysis and Development
Completed
Start:
30 Oct 2023Due:
26 Jan 2024Completion:
26 Jan 2024Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- The proposed solution is to roll out support for Online Certificate Standard Protocol (OCSP) in addition to Certificate Revocation List (CRL). The scope of the change will be: - Implementation of a central OCSP server and the update of the associated PKI processes to manage the Certificate Revocation. This will cover the TLS and JWS Certificate Revocation. - CSS implementation of Application Gateway will be reconfigured to include the OCSP functionality and server. - CSS change to implement the OCSP checking for the JWS certificates. - All new certificates that are issued will include the detail of the OCSP Server, as part of the migration approach all new certificates will have this information embedded. - All parties connecting to CSS have the relevant information for them to exploit the advanced features that OCSP introduces. The CRL checking functionality will be maintained so this change is an optional upgrade for any Systems that operate using Switching Key Infrastructure.
Problem Statement
There is currently a Microsoft Azure Application Gateway module defect against the checking of Certificate Revocation Lists (CRLs), with Microsoft stating that the CRL related defect will not be fixed. Consequently, any system within the CSS ecosystem, systems that use Switching Key Infrastructure (SWIKI), that have incorporated the Azure Application Gateway module to manage the TLS connection will have been required to implement a manual/custom workaround to ensure that certificates that are revoked are not allowed to establish a connection.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
R0151 - Implementation of OCSP in addition to CRL
R0151 - Initial Assessment Report V2.0 (Approved) 06.02.2024
Company Name
Smart DCC
Review status
Review required
CSS Message Time Stamping
Date of latest update
Type
Change
ID
R0107
Urgent
No
Latest Update
11/08/2023 - This Change Proposal has been withdrawn. During the progression of the Preliminary Impact Assessment work, it was found that an existing data item ‘EventDate’ could be leveraged to address the issue stated in the Change Proposal. R107 will be open for adoption until 25/08/2023.
Summary
Empty
Change Plan
Test
In Progress
Start:
14 Apr 2023Due:
19 Mar 2026Completion:
19 Mar 2026Status
Implementation Status
Date Raised
Solution Development
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
R0107 - Change Proposal Form
Company Name
DCC
Review status
Review required
Central provision of DCC Technical Contacts for requesting test certificates
Date of latest update
Type
Change
ID
R0103
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
19.09.2023 - approved for implementation in February 2024 Release
Summary
In order for central systems testing (including maintenance and emergency testing) to be undertaken by the Switching Operator, certificates from the SDSPs and CSS User communities are required to interact with CSS in the testing environments. The Switching Operator was able to issue certs to the simulator provider during the Switching Programme, but the replacement process via Service Now no longer allows this – instead placing onerous activity on Parties to collaborate with the Switching Operator to give them the ability to request certificates on their behalf. This change has been raised to ensure that test certificates are held at all times for enough parties to enable changes to be tested with enough simulation to replicate live operational scenarios. The solution proposed is that the Switching Operator can nominate Technical Contacts (TC) for all CSS Users, in order that certificates can be requested for simulators in the test environments. CSS Users would continue to be able to nominate / remove their own TCs as now (and be able to remove the Switching Operator-nominated Technical Contact), and would see all TCs listed on the Switching Portal.
Change Plan
Impact Assessment period - start date
Completed
Start:
23 Mar 2023Due:
19 May 2023Completion:
19 May 2023Impact Assessment period - end date
Completed
Start:
19 May 2023Due:
28 Jul 2023Completion:
28 Jul 2023Preliminary Change Report issued and consultation started
Completed
Start:
28 Jul 2023Due:
11 Aug 2023Completion:
11 Aug 2023Consultation end date
Completed
Start:
11 Aug 2023Due:
04 Sep 2023Completion:
04 Sep 2023Final Change Report issued
Completed
Start:
04 Sep 2023Due:
15 Sep 2023Completion:
08 Sep 2023Responsible Committee decision
Completed
Start:
15 Sep 2023Due:
22 Sep 2023Completion:
19 Sep 2023Impacted Consumers
Impacted REC Documents
Impacted REC Services
Status
Implementation Date
23 February 2024
| Included changes | Affected REC Items | |
|---|---|---|
| R0103 | Central provision of DCC Technical Contacts for requesting test certificates |
|
| R0156 | Updates to the CSS Message Business Data Validation Rules and Physical Interface Design Specification | |
| R0071 | DCC access to EES and GES |
|
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
- As the SO, I want sufficient simulators to be available in the test environments, so that I can test changes to CSS systems for all necessary scenarios
- As a CSS User, I want changes to the CSS systems to be robustly tested, so that implemented changes align to their design and deliver the planned benefits
- As a CSS User, I want to be able to manage my Technical Contacts, so that I am in control of my responsibilities under the REC
Proposed Solution Document
Document title
R0103 legal text changes for Party IA 22.06.2023
Upload document
R0103 legal text for Party IA 22.06.2023.pdf
Archive
Off
Document title
R0103 legal text for PCR v1.0 11.08.2023
Upload document
R0103 legal text for PCR v1.0 11.08.2023.pdf
Archive
Off
Document title
R0103 - Legal text for FCR v1.0 08.09.2023
Upload document
R0103 legal text for FCR v1.0 08..09.2023.pdf
Archive
Off
Problem Statement
Due to certificate expiry, there are not currently sufficient test security certificates for connecting to CSS test environments and emulating CSS Users (simulators). The current process for CSS Users to request certificates is inefficient and is reliant on the CSS Users obtaining new certificates in a timely manner. Without sufficient test certificates, the Switching Operator may not be able to fully test changes to the CSS system.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0103 Change Proposal Form (downloadable version) 23.03.2023
R0103 legal text for IAR v1.0 26.05.2023
R0103 - Change Proposal Plan v1.0 (Approved) 06.06.2023
R0103 - Initial Assessment Report v1.0 (Approved) 06.06.2023
R0103 Consolidated Impact Assessment Responses v1.0 11.08.2023
R0103 - Preliminary change Report Consultation Responses consolidated 08.09.23
R0103 - Preliminary Change Report v1.0 11.08.2023
R0103 Final Change Report (Approved for Implementation) 19.09.2023
Company Name
-
Review status
Review required
Schedule 25 - Central Switching Service 1.1
– Implemented on
Market Participant Applicability
| Market participant | All Sections |
|---|---|
| Electricity Suppliers | Mandatory |
| Gas Suppliers | Mandatory |
| Distribution Network Operators | Mandatory |
| Gas Transporters | Mandatory |
| DCC | Mandatory |
| Metering Equipment Managers | Mandatory for CSS Users |
| Non-Party REC Service Users | Mandatory for CSS Users |