Amendment Proposal: RECCo Access Provision to RECCo Services
Date of latest update
Type
Change
ID
R0185
Change Path
Priority
Urgent
No
Latest Update
08/08/2024 - the Proposer has withdrawn this Change Proposal.
Summary
RECCo is tasked with fulfilling several obligations. This proposal has been raised to amend some of the wording within the REC, which would benefit from reassessment. When the REC was originally drafted, references to RECCo in the code were originally intended to refer to the activities directly managed and overseen by the REC Board, and were considered separately to activities managed by the Code Manager.
Impacted REC Documents
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
R0185- CP Form Amendment Proposal RECCo Access Provision to RECCo Services.docx
Company Name
RECCo
Review status
Review required
DPI Extract from CSS
Date of latest update
Type
Change
ID
R0183
Change Category
Change Path
Priority
Urgent
No
Latest Update
11/03/2025 - The proposer has withdrawn the request due to the expected delivery of enquiry data in the same anticipated timescales & the continued pursuance of I0224. The adoption window has closed.
Summary
It has emerged that there are data quality issues relating to the Domestic Premises Indicator (DPI) Data Item, where MPxNs have been recorded as having the wrong DPI. This Change has been raised to identify a mechanism by which this issue can be resolved.
Change Plan
Solution Analysis and Development
In Progress
Start:
11 Jun 2024Due:
20 Sep 2024Completion:
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- C1 - As a Consumer, I want industry data relating to my energy supply to be accurate, so that I do not experience any issues when switching or engaging with other consumer facing industry practices.
- M1 - As a CSS User, I want available DPI data to be accurate, so that when I engage with industry processes that require DPI data, I am confident that I am engaging with the right information. M2 - As the CSS, I want to provide accurate data to CSS Users, so that I am able to facilitate successful industry operations for my Users.
Problem Statement
Inaccurate DPI data available within industry data sources can result in less accuracy within REC processes that utilise this data, and poorer consumer outcomes. DPI data accuracy needs to be improved to ensure that industry processes and Consumers are not impacted.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Change Proposal Form
R0183 Change Report V3.0 02.12.2024
Company Name
-
Review status
Review required
Clarity on use of on hold for switching issues, including the obligations of CSS Users
Date of latest update
Type
Change
ID
R0180
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/11/26 - This Change Proposal has been implemented as part of the 6 November 2026 REC Release.
Summary
Many Switching Incidents are on hold waiting for resolution. The Switching Operator puts these tickets on hold, which is an approved business process from the Switching Programme. This is not reflected in the obligations on SDSPs or other REC Service Providers, where there is no on hold concept. Further there are no obligations on CSS Users to respond in a timely basis. This means that the REC obligations do not reflect current practice, and many tickets remain open much longer than necessary.
Change Plan
Change Issue Group
Completed
Start:
03 Jun 2024Due:
01 Aug 2024Completion:
01 Aug 2024Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
06 November 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0180 | Clarity on use of on hold for switching issues, including the obligations of CSS Users |
|
| R0207 | Import / Export MOA Charging Clarification |
|
| R0253 | Theft - DNO/Networks not providing photos |
|
| R0261 | Addition of Export flag in D0303 flows | |
| R0266 | REC Data Specification Clarifications |
|
| R0317 | Number of Displayed Register Digits Data Item linkage | |
| R0328 | Removal of D0383 & D0384 requirements from Sharing MTDs process |
|
| R0336 | Legal text to support REC Change R0180 |
|
| R0343 | MSC - Amending Statement Production Timescales | |
| R0345 | Housekeeping November 2026 |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 11 Nov 2026 | ||
| 1.0 | 11 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Option 1
Upload document
Option 1.zip
Archive
Off
Document title
Solution Development Report
Upload document
Solution Development Report.pdf
Archive
Off
Document title
Option 2
Upload document
Option 2.zip
Archive
Off
Document title
Option 3
Upload document
Option 3.zip
Archive
Off
Problem Statement
A lack of obligations is causing issues with open tickets relating to missing messages. Tickets placed on hold also require significant additional work for the Switching Operator, which could either be released as a cost saving or it could result in time freed up for improvement activities.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
Issue Form
Change Report - Proposal Plan V1.0
I0180 Extension to Plan V1.0 approved 09.07.25
I0180 Consolidated Party Impact Assessment Responses v1.0
I0180 Update to Plan V1.0 approved 10.12.25
R0180 Change Report (For Consultation) V1.0
R0180 Consolidated consultation responses V1.0
R0180 Change Report (Final Recommendation) V1.0 approved 25.03.26
Company Name
REC Code Manager
Review status
Review required
Proposal for Limiting Queries in EES API Calls (Single Query per API Call)
Date of latest update
Type
Change
ID
R0179
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
This issue has been raised proposing to establish a limit on the number of queries permitted within a single Application Programming Interface (API) call. As there is potential for performance degradation and system instability that can occur when a large number of queries are made in a single API call to the Electricity Enquiry Services (EES) API. The aim would be to prevent overwhelming the system and ensure consistent response times and reliability. Therefore, this proposes implementing a limit of 1000 queries per single API call.
Change Plan
Request for Information
Completed
Start:
03 Jun 2024Due:
05 Jul 2024Completion:
05 Jul 2024Change Issue Group
Completed
Start:
05 Jul 2024Due:
01 Aug 2024Completion:
01 Aug 2024Impacted REC Parties and Market Participants
Status
Implementation Date
27 February 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0179 | Proposal for Limiting Queries in EES API Calls (Single Query per API Call) | |
| R0190 | Related Meter Point RMP status rules |
|
| R0198 | Metering Asset Manager (MAM) Communication Method Register | |
| R0242 | Missing Scenario Variant from R0043 |
|
| R0244 | C21 to be introduced into STIRG Document |
|
| R0235A | Missing Scenario Variants in D0179 Alternate Solution | |
| R0256 | MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101 |
|
| R0270 | Clarification of SIP Qualification Requirements |
|
| R0271 | Clarification of ASP, AMI, and EMO Accession Requirements |
|
| R0272 | Enabling transparency of the CRS Provider’s REC service level performance |
|
| R0277 | Data Latency SLA Alignment for Gas Enquiry Service |
|
| R0280 | CSS Certificate Authority audit clarification |
|
| R0283 | Annual Address Management Plan Updates |
|
| R0287 | Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations |
|
| R0293 | Housekeeping February 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Request For Information (RFI)
Archive
Off
Problem Statement
The absence of a limit on the number of queries (batch processing) within a single API call could cause performance issues and system instability. As a result, system responsiveness may degrade when a large number of queries are made in a single call, impacting user experience and hindering the ability of the EES API to consistently meet user demands.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
Issue Form
EES API Interface Specification REDLINE DRAFT for R0179
R0179 - Change Report - Final Recommendation Approved
R0179 Change Report (Consultation)
R0179 Consolidated consultation responses (non- confidential)
Re-baseline Change Plan 15.07.25
Consolidated IA responses (non-confidential)
I0179 Change Report (Impact Assessment)
Service Provider - Impacts Data
I0179 - Consolidated RFI Responses
Change Report (Proposal Plan)
Consultation on implementation date response
Change Report - Final Recommendation (new implementation date)
Company Name
RECCo
Review status
Review required
Improvements to CSS Business Process Logic
Date of latest update
Type
Change
ID
R0178
Change Category
Change Path
Priority
Urgent
No
Latest Update
17/06/2026 - The Code Manager has published an Update to Plan. This will be presented to the REC Technical Expert Panel at their meeting on 24 June 2026.
Summary
This change proposal is aimed towards rectifying a collection of issues that were identified with the CSS Business Process Logic. These have been identified as follows: 1. Deactivation of an active reg. whilst in-flight switch in progress 2. Deactivation of a prior cancelled registration 3. OFAF switch containing multiple MPxN
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
25 June 2027
| Included changes | Affected REC Items | |
|---|---|---|
| R0122 | SDEP Review Improvements (2) - Usability | |
| R0178 | Improvements to CSS Business Process Logic | |
| R0284 | Updates to Schedule 14 Measurement Transformers Commissioning Timescales |
|
| R0321 | DNOs Create Export MPANs after approving G98/99 commissioning documents |
|
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- Deactivation of an active reg. whilst in-flight switch in progress As mentioned previously, the ‘Deactivation of an active reg. whilst in-flight switch in progress’ issue did have an existing REC CP raised and therefore is further along the discussion process compared to the other two issues identified. Initial discussion outlined that the most appropriate solution for this change proposal should consider the business needs and the desired outcomes. It was noted that from a business perspective, if the switch has already been accepted, then it should still go through and not be cancelled. Therefore, the following points were raised: • It was acknowledged that there are multiple solution options/approaches that could potentially be employed to resolve this issue. As such, and to avoid being overly prescriptive, it is requested that CSS provider investigate all possible options and outline their recommendation for the most suitable approach, which would be developed/progressed further through the subsequent Impact Assessments. • However, the aim is for an effective solution to be developed which would ensure that the consumer is switched with the original effective date being used and that CSS systems could cater for such registration events whilst following the normal Gate Closure processes. • Where possible, the solution should also look to proactively mitigate the impact of this scenario, as opposed to working on a retrospective basis which can lead to the issue persisting over an extended period of time. It was also noted that consideration would need to be given to state of the meters as this would also have an impact on whether switches are able to progress: Therefore, the following points were raised: • The solution would need to consider how the incumbent supplier has deactivated the meter and whether it has been moved to a ‘terminated’ state or a ‘dormant’ state. o Dormant – The meter is inactive. Note that this is a temporary state and therefore the meter could be put back into service. o Terminated – The meter has reached end of life and cannot be reinstated. Note that this is a permanent state. • If the incumbent supplier has moved the meter into a ‘terminated’ state, the in-flight switch would then need to be cancelled. • However, for the ‘dormant’ state, the following two options would be available in terms of what could happen to the status of the meter and thus the in-flight switch: o Moves from ‘inactive’ to ‘active’ (continue with the switch) o Moves from ‘inactive’ to ‘cancelled’ (cannot continue with the switch)
- Deactivation of a prior cancelled registration and OFAF switch contains multiple of the same MPxN It is noted that the initial approach discussed was to add new Business Data Validation Rules (BDVR) to stop these issues from occurring. However, this was only discussed at high-level and therefore we request that the CSS provider confirm this approach and provide further details as this change proposal progresses.
Problem Statement
1) Deactivation of an active reg. whilst in-flight switch in progress: There are instances where the incumbent supplier is withdrawing prior to the ‘Supply Effective from Date’, causing the accepted switch to fail at Gate Closure which occurs at 17:00hrs. This creates the scenario in which there is no longer a losing supplier for the consumer to switch from, and therefore the switch process stalls and cannot be progressed. Therefore, this has a direct impact on consumers who have a switch request which has already been accepted but CSS is not able to progress further as the switch process stops. Indeed, there have been a total of 82 missing messages observed since 1st January 2023, of which 66 messages have been related to switches where there was no registered Supplier recorded at Gate Closure. The 30th September 2023 Gate Closure was particularly impacted by this scenario and resulted in 45 registrations which did not become effective on 14th October 2023 as planned. It should also be noted that the 1st October is one of the key contracting dates for large Industrial and Commercial (I&C) consumers, consequently increasing the impact to consumers in this instance. 2) Deactivation of a prior cancelled registration: This scenario occurs when the registered supplier of a MPxN (via the active registration) is the same supplier that cancelled a previous switch for the same MPxN. In this case there is the possibility that the supplier could attempt to deactivate the active registration by accidentally providing the cancelled registration identifier. Currently, CSS still accepts the deactivation request and erroneously changes the cancelled registration state from cancelled to inactive, sending out securedInactive messages. Currently, after an MPxN is disconnected, the Supplier is required to submit a deregistration request to CSS. Therefore, there is a possibility that the suppliers could submit this request for a cancelled registration not active registration. CSS would still accept this request as the Business Data Validation Rules (BDVR) lack coverage of this case; in such cases the Supplier may incorrectly believe that they have deregistered the MPANs. 3) OFAF switch containing multiple MPxN: This is the instance where the end user sends through a One Fail All Fail (OFAF) switch with the same MPxN contained within the payload 2 or more times. Multiple registration IDs are created for the same MPxN, and the registration is left in an incorrect state given a lack of appropriate BDVRs. Indeed, there has been a further reported incident regarding an OFAF transaction of the same MPxN. The primary MPxN was associated with a secondary MPxN and therefore two registrations were created for the primary and secondary MPxN, equating to four registrations in total. There was then an objection raised but this only cancelled 1 of the 2 registrations for each MPxN. The remaining 2 registrations proceeded through gate closure.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
R0178 - Change Proposal Form
R0178 - Change Report (Proposal Plan) V2.0 (18.02.2025)
R0178 - Update to Proposal Plan V1.0 (Approved) 18.02.2025
R0178 - Consolidated Impact Assessment Responses (Non-Confidential) 18.03.2026
R0178 - Change Report (For Consultation) V1.0
R0178 - Update to Plan (17.06.2026) Pre-Approval
Company Name
REC Technical Services
Review status
Review required
Change Smart Meter Installation Consumer Survey Specification survey questions to a REC Category 2 document
Date of latest update
Type
Change
ID
R0177
Change Category
Change Path
Priority
Urgent
No
Latest Update
This change was implemented on 06 September 2024.
Summary
Adding the Smart Meter Installation Consumer Survey Specification questions to the REC list of documents will allow any amendments to follow the REC change process and allow anyone to propose such amendments.
Change Plan
Preliminary Change Report published
Completed
Start:
22 May 2024Due:
05 Jul 2024Completion:
04 Jul 2024Consultation opened
Completed
Start:
05 Jul 2024Due:
05 Jul 2024Completion:
04 Jul 2024Consultation closes
Completed
Start:
05 Jul 2024Due:
26 Jul 2024Completion:
26 Jul 2024Final Change Report published
Completed
Start:
26 Jul 2024Due:
09 Aug 2024Completion:
08 Aug 2024Change Panel decision
Completed
Start:
09 Aug 2024Due:
20 Aug 2024Completion:
20 Aug 2024Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
06 September 2024
| Included changes | Affected REC Items | |
|---|---|---|
| R0177 | Change Smart Meter Installation Consumer Survey Specification survey questions to a REC Category 2 document | |
| R0188 | Changes to Terms of reference following acceptance of R0167 | |
| R0192 | Housekeeping Amendments |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- As a Domestic or Micro-Business Consumer, I want the Smart Meter Installation survey questions to have robust governance, so I have confidence the right KPIs are being monitored.
- As an Energy Supplier, I want the Smart Meter Installation survey questions to be governed by the REC Change Process, so I can suggest and provide feedback on changes to them.
Proposed Solution Document
Document title
REC Baseline Statement DRAFT
Upload document
REC Baseline Statement DRAFT.xlsx
Archive
Off
Problem Statement
The Smart Meter Installation Consumer Survey Specification questions are mandatory for Energy Suppliers to use, but there is no mechanism for Energy Suppliers to raise changes or issues against the questions as they are not held in the REC Baseline Statement.
Stages Selection
R0177 Change Proposal Form
R0177 Change Proposal Plan v1.0 Approved
R0177 Initial Assessment Report v1.0 Approved
R0177 Preliminary Change Report v1.0
R0177 Consolidated Consultation Responses v1.0
R0177 Change Report (Final Recommendation) V1.1
Company Name
Gemserv
Review status
Review required
End-to-End New Connections Process Review
Date of latest update
Type
Issue
ID
I0172
Priority
Urgent
No
Latest Update
On 05 February 2026, the Code Manager decided that I0172 would be closed as resolved. After extensive industry engagement, no REC Code changes were identified as necessary. All address management elements raised under I0172 will be handled under I0200. The Crossed Meters process review will be raised in a separate Change Proposal (REC Issue I0314).
Summary
The REC Code Manager is conducting a end-to-end review of the new connections process, examining issues that occur across all industry codes.
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
Reported inconsistencies in the application of elements of the entire new connections process result in poor Consumer outcomes. Whilst the new connections process spans multiple processes owned by different Codes, the REC Code Manager is conducting an exploratory initial analysis, owing to our place as a dual-fuel, Consumer facing Code. This analysis is expected to yield multiple modifications across multiple Codes that will result in improvements to the new connections process.
Stages Selection
Stages Selection
I0172 - Issue Proposal Form (pdf)
I0172 Change Report (Proposal Plan) V2.0 (17.06.2025)
I0172 - Update to Plan V1.1 (17.06.2025) Approved
Non-IGT Gas Meter Install Process Map (August 2025 Change Issues Group)
I0172 - Update to Plan V2.0 (09.12.2025) Approved
Company Name
-
Review status
Review required
June 2024 Housekeeping
Date of latest update
Type
Change
ID
R0171
Change Category
Change Path
Priority
Urgent
No
Latest Update
12/06/24 - this Change Proposal has been withdrawn at the request of the Proposer.
Summary
The Code Manager has identified a number of typographical and formatting errors, as well as opportunities to provide clarity, improve consistency and accuracy across the REC Services and products. These changes have been assessed as meeting the criteria to be progressed via a Housekeeping Change Proposal.
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Problem Statement
This is a Housekeeping Change Proposal subject to the Housekeeping Change Proposal process, rather than the standard change process. The nature of the change is that it makes non-material changes to the REC Products to correct typographical and consistency errors. It also provides an opportunity to introduce necessary clarifications.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
CP Form R0171 - June 2024 Housekeeping
Company Name
Code Manager
Review status
Review required
Withdrawal of Service Termination Issue Reporting Guidance (STIRG) from REC Governance.
Date of latest update
Type
Change
ID
R0170
Change Category
Priority
Urgent
No
Latest Update
15/11/2024 - The Authority have published their decision, to reject this change proposal in line with the Code Manager and REC Change Panel recommendations. This decision can be found here: https://www.ofgem.gov.uk/decision/retail-energy-code-modification-r0170-rejected
Summary
REC MEP have decided that the current governance for the STIRG is unsuitable for this type of document, and that it should be removed from the REC into ENA governance.
Change Plan
Party Impact Assessment opens
Completed
Start:
09 May 2024Due:
21 Jun 2024Completion:
20 Jun 2024Party Impact Assessment closes
Completed
Start:
21 Jun 2024Due:
12 Jul 2024Completion:
12 Jul 2024Preliminary Change Report published
Completed
Start:
12 Jul 2024Due:
26 Jul 2024Completion:
25 Jul 2024Change Panel review
Completed
Start:
26 Jul 2024Due:
06 Aug 2024Completion:
06 Aug 2024Consultation opens
Completed
Start:
06 Aug 2024Due:
09 Aug 2024Completion:
08 Aug 2024Consultation closes
Completed
Start:
09 Aug 2024Due:
02 Sep 2024Completion:
02 Sep 2024Final Change Report published
Completed
Start:
02 Sep 2024Due:
20 Sep 2024Completion:
05 Sep 2024Change Panel review
Completed
Start:
20 Sep 2024Due:
01 Oct 2024Completion:
17 Sep 2024Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- As a Consumer, I want to be confident that any person working on the metering at my property has the adequate guidance under the appropriate governance to allow works to be conducted safely.
- As an electricity MEM or DNO, I need the STIR Guidance Document to sit under appropriate governance so I can be confident it is kept up to date for industry needs.
Proposed Solution Document
Document title
R0170 Draft Legal Text 06.06.24
Upload document
R0170 Draft Legal Text 06.06.24.zip
Archive
Off
Problem Statement
The issues surrounding the status of the STIR Guidance document is impacting on the ability of involved parties to review and update the guidance.
Stages Selection
ENALET~1.pdf
Change Proposal Form
R0170 Change Proposal Plan v1.0 (Approved) 18.06.2024
R0170 Initial Assessment Report v1.0 (approved) 18.06.24
R0170 Consolidated Impact Assessment Responses PUBLIC v1.0
R0170 Change Report (For Consultation) V1.1
R0170 Consolidated Consultation Responses PUBLIC v1.0
R0170 Change Report (Final Recommendation) Post Vote v1.0
Company Name
Energy Networks Association
Review status
Review required
Introduction of End of Gate Closure notifications
Date of latest update
Type
Change
ID
R0169
Change Category
Change Path
Priority
Urgent
No
Latest Update
15/09/2025 - following discussions at the August Change Issues Group, the Proposer has decided to withdraw R0169. The adoption window is closed.
Summary
This change seeks to introduce additional functionality within the CSS, to allow CSS users to be notified (by CSS) that the CSS has completed the processing of gate closure messages (i.e. sending of securedActive and securedInactive messages). CSS Users in receipt of this End-of-Gate-Closure (EoGC) notification are then able to commence any applicable downstream processing. It is recognised that an EoGC notification is of value to specific parties which have post-gate closure obligations, however the availability of an EoGC notification is to be made available for all CSS users.
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
The completion of a gate closure event is not reported to CSS Users (at the time), and CSS Users which require to complete downstream processing must assume when the gate closure event has completed in order to initiate any downstream processing they require to complete.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
Requirements for End of GC messages
R0169 - Introduction of End of Gate Closure Notifications (Change Proposal Form)
R0169 Change Report (Proposal Plan) V1.0 (Approved) 18.02.2025
Company Name
DCC
Review status
Review required