Schedule 5 - Change Management 3.1 – Implemented on
Market Participant Applicability
Market participant All Sections
Domestic Suppliers Mandatory
Non-Domestic Suppliers Mandatory
Gas Transporters Mandatory
Distribution Network Operators Mandatory
DCC Mandatory
Metering Equipment Managers Mandatory
Non-Party REC Service Users N/A
Loading...

Frequency and content of CSS reports on switching via the DCC portal

Date of latest update
Type
Change
ID
R0115
Change Category
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
This change has been raised by Ofgem to make updates to CSS reports provided by the Switching Operator; for these be provided on a weekly basis and be designed in such a way that only genuine Switches between Suppliers are reported. At present the latter is not possible as all switches at MPID level are reported with no indication of switching flows.
Proposer
Monica Gandolfi
Change Plan

Preliminary Change Report published

Completed

Start:

27 Apr 2023

Due:

15 Dec 2023

Completion:

15 Dec 2023

Consultation issued

Completed

Start:

15 Dec 2023

Due:

15 Dec 2023

Completion:

15 Dec 2023

Consultation close

Completed

Start:

15 Dec 2023

Due:

19 Jan 2024

Completion:

19 Jan 2024

Final Change Report published

Completed

Start:

19 Jan 2024

Due:

26 Jan 2024

Completion:

26 Jan 2024

Responsible Committee Decision

Completed

Start:

26 Jan 2024

Due:

06 Feb 2024

Completion:

06 Feb 2024

Send to Authority for determination

In Progress

Start:

06 Feb 2024

Due:

07 Feb 2024

Completion:

Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.14.0_Superseded
Included changes Affected REC Items
R0108 Enabling Electricity Enquiry Service searches using a Unique Property Reference Number
R0113 Data Specification updates and clarifications
R0115 Frequency and content of CSS reports on switching via the DCC portal
R0119 Annulment Definition
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0150 On-site Aggregation as a method to facilitate Third Party Access - BSC P455
  • Schedule 1 - Interpretations and Definitions
  • Schedule 25 - Central Switching Service
R0049 Intellectual Property Rights and Services Data Main Body changes
R0092A DCC Service Level Agreements for the Switching Incentive Regime (Alternative)
R0203 CSS Retry Strategy
  • Schedule 24 - Switching Data Management
R0206 Cross code change to align with BSC CP1598
  • Market Message Catalogue
R0211 November 2024 House Keeping Change
R0069 Amendments to Sample Access Agreement
  • Schedule 9 - Qualification and Maintenance
R0094 Clarify obligations on gas meter exchanges that occur close to CoS
  • Schedule 14 - Metering Operations
  • Market Message Catalogue
R0098 Optional fuzzy searching in EES

Documents

Name Version Last updated Actions
199.57 KB
Version 1.0 - 02 Nov 2026 PDF - 199.57 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want Ofgem to effectively monitor the market to ensure the right policy decisions are made.
  2. As Ofgem, I need accurate and timely data to ensure that I can make informed decisions on any interventions in relation to market stability.
Proposed Solution Document
Document title
Attachment A_R0115 Solution Requirements Matrix v2.0
Upload document
Attachment A_R0115 Solution Requirements Matrix v2.0 (1).xlsx
Archive
Off
Document title
Attachment B_R0115 Report Templates v1.0
Upload document
Attachment B_R0115 Report Templates v1.0 (1).xlsx
Archive
Off
Document title
Switching Operator (SO) Service Definition_redline 15.12.2023
Upload document
Switching Operator (SO) Service Definition_redline 15.12.2023.docx
Archive
Off
Problem Statement
Without appropriate reporting, Ofgem cannot effectively monitor the level of Switching in the market in a timely and accurate manner. This hinders its ability to act and inform any policy interventions in relation to market stability.
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
R0115 - Change Proposal Form
R0115 - Change Proposal Plan v2.0 (Approved) 05.12.2023
R0115 Initial Assessment Report v2.0 (Approved) 05.12.2023
R0115 - Preliminary Change Report v1.0 (Published for Consultation) 15.12.2023
R0115 - Consolidated Consultation Responses_Non Confidential (26.01.2024)
R0115 - Final Change Report v1.0 (Post-Vote) 06.02.2024
R0115 Authority Decision (23.04.2024)
Company Name
Ofgem
Review status
Review required

Provision of Enduring Test Environments

Date of latest update
Type
Change
ID
R0070
Change Category
Change Path
Priority
Urgent
No
Latest Update
28/06/2024 - Change implemented as part of the June 2024 REC Release
Summary
Currently the REC does not require the Central Switching Service (CSS) and Switching Operator (SO) to provide the enduring test environments and test data for use by REC Parties when making necessary system changes for REC Change Proposals or internal system updates. This Change Proposal has been raised to introduce these obligations in to the REC.
Proposer
Beth Brown
Change Plan

Solution Analysis and Development

Completed

Start:

09 Sep 2022

Due:

06 Jun 2023

Completion:

06 Jun 2023

Service Provider Impact Assessment Period

Completed

Start:

06 Jun 2023

Due:

06 Oct 2023

Completion:

06 Oct 2023

Service Provider Impact Assessment

Completed

Start:

24 Nov 2023

Due:

03 Jan 2024

Completion:

03 Jan 2024

Party Impact Assessment Issued

Completed

Start:

06 Oct 2023

Due:

24 Nov 2023

Completion:

24 Nov 2023

Preliminary Change Report Issued

Completed

Start:

03 Jan 2024

Due:

16 Jan 2024

Completion:

16 Jan 2024

Responsible Committee Review

Completed

Start:

16 Jan 2024

Due:

23 Jan 2024

Completion:

23 Jan 2024

Consultation Issued

Completed

Start:

23 Jan 2024

Due:

26 Jan 2024

Completion:

26 Jan 2024

Final Change Report Issued

Completed

Start:

26 Jan 2024

Due:

23 Feb 2024

Completion:

23 Feb 2024

Responsible Committee Decision

Completed

Start:

23 Feb 2024

Due:

05 Mar 2024

Completion:

05 Mar 2024
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.11.0_Superseded
Included changes Affected REC Items
R0043 Commissioning of Works by the Crowded Meter Room Coordinator (CMRC) to Resolve Issues In Crowded Meter Rooms
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 12 - Data Access
  • Data Access Matrix (Electricity)
  • Data Item Catalogue
  • Market Message Catalogue
R0158 Amendment to the ‘Supplier Registration Report (MAP)’ report methodology
R0160 Electricity Supply to Hydrogen Electrolysers
  • Schedule 1 - Interpretations and Definitions
R0064 Creating a Meter Operator Agent and MOCoP Installer
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 9 - Qualification and Maintenance
R0070 Provision of Enduring Test Environments
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
  • Schedule 26 - Switching Service Management
  • Schedule 25 - Central Switching Service

Documents

Name Version Last updated Actions
159.49 KB
Version 1.0 - 16 Nov 2026 PDF - 159.49 KB
1.0 16 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed solution summary
  1. As a CSS User I want access to a CSS Test Environment, to enable me to test my systems and processes ahead of the implementation of complex or significant changes, so that I can identify any issues prior to go-live.
  2. As the SO, I want clarity on the obligations placed on me regarding the provision and maintenance of CSS Test Environments and data, so that I can meet my obligations and provide CSS Users and Service Providers with access to appropriate Test Environments.
  3. As a Switching Data Service Provider (SDSP), I want clarity on the obligations placed on me regarding the provision and maintenance of Test Environments and data, so that I can meet my obligations to test CSS changes. As a Switching Data Service Provider (SDSP), I want access to a CSS Test Environment, to enable me to test my systems and processes ahead of the implementation of complex or significant changes, so that I can identify any issues and address prior to go-live.
Proposed Solution Document
Document title
R0070 legal text v1.0 - Published with Impact Assessment
Upload document
R0070 legal text v1.0 - Published with Impact Assessment.docx
Archive
Off
Document title
R0070 Legal Text v2.0 - Published with Preliminary Change Report
Upload document
R0070 legal text v2.0.pdf
Archive
Off
Document title
R0070 - Legal Text v3.0 - Approved for Implementation
Upload document
R0070 legal text v3.0.pdf
Archive
Off
Document title
REC Category 3 - Environment Management Plan
Upload document
REC Cat 3 Environment Management Plan v0.6 - Published with Impact Assessment.docx
Archive
Off
Document title
REC Category 3 Test Data Management Plan
Upload document
REC Cat 3 Test Data Management Plan v0.6 - Published with Impact Assessment.docx
Archive
Off
Problem Statement
For specific types of changes, industry system testing will be required to ensure the end-to-end Switching processes will work as expected following implementation. If Test Environments and Test Data are not available, CSS Users will not be able to complete testing to confirm their systems will operate correctly in the live environment. The REC currently doesn’t define specific obligations on Service Providers regarding enduring test systems and Test Data for Switching processes. The lack of specific obligations may impact the availability of appropriate Test Environments. This could impact the progression of improvements to Switching processes that require a technical change.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0070 Initial Assessment Report v1.0 (Approved)
R0070 - Preliminary Change Report (Approved 23.01.2024)
R0070 - Change Proposal Plan v2.0 (Approved)
R0070 - Change Proposal Form
R0070 - Consolidated Impact Assessment Responses
R0070 - Consolidated Consultation Responses
R0070 - Final Change Report V2.0 (Post-Vote) 05.03.2024
Company Name
-
Review status
Review required
Schedule 5 - Change Management 3.0 – Implemented on
Market Participant Applicability
Market participant All Sections
Domestic Suppliers Mandatory
Non-Domestic Suppliers Mandatory
Gas Transporters Mandatory
Distribution Network Operators Mandatory
DCC Mandatory
Metering Equipment Managers Mandatory
Non-Party REC Service Users N/A
Loading...

REC V3.0

Date of latest update
Type
Change
ID
R0041
Change Category
Urgent
Yes
Latest Update
-
Summary
-
Proposer
Alasdair MacMillan
Change Plan

Legal text baselined

Completed

Start:

10 Apr 2022

Due:

13 May 2022

Completion:

13 May 2022

Final Change Report Issued

Completed

Start:

13 May 2022

Due:

20 May 2022

Completion:

20 May 2022

Responsible Committee Decision

Completed

Start:

20 May 2022

Due:

07 Jun 2022

Completion:

07 Jun 2022

Authority Determination (Original)

Completed

Start:

07 Jun 2022

Due:

20 Jun 2022

Completion:

17 Jun 2022

Authority Determination (revoked and re-issued)

Completed

Start:

20 Jun 2022

Due:

29 Jun 2022

Completion:

29 Jun 2022
Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 3.0.0_Superseded
Included changes Affected REC Items
R0038 Performance Assurance Report Catalogue Changes as a consequence of REC V3.0
R0041 REC V3.0
  • REC Main Body
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 19 - Market Exit and Supplier of Last Resort
  • Schedule 5 - Change Management
  • Schedule 27 - RMP Lifecycle
  • ASPCoP (since removed)
  • Schedule 28 - Related Metering Points
  • Schedule 29 - Address Management
  • Schedule 9 - Qualification and Maintenance
  • Schedule 2 - REC Transition Schedule
  • Schedule 26 - Switching Service Management
  • Schedule 12 - Data Access
  • Schedule 10 - Charging Methodology
  • Schedule 23 - Registration Services
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Schedule 25 - Central Switching Service
  • Standards Definition Document
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)
  • Data Item Catalogue
  • Market Message Catalogue
R0042 Performance Assurance Board Terms of Reference
  • Performance Assurance Board - Terms of Reference
R0045 Changes to SDEP Messages and Schedule numbering for REC V3.0
  • Market Message Catalogue

Documents

Name Version Last updated Actions
258.97 KB
Version 1.0 - 02 Nov 2026 PDF - 258.97 KB
1.0 02 Nov 2026
257.76 KB
Version 1.0 - 02 Nov 2026 DOCX - 257.76 KB
1.0 02 Nov 2026
219.4 KB
Version 1.0 - 16 Nov 2026 PDF - 219.4 KB
1.0 16 Nov 2026
1.65 MB
Version 1.0 - 02 Nov 2026 PPTX - 1.65 MB
1.0 02 Nov 2026
6.74 MB
Version 1.0 - 02 Nov 2026 PPTX - 6.74 MB
1.0 02 Nov 2026
9.01 MB
Version 1.0 - 02 Nov 2026 PPTX - 9.01 MB
1.0 02 Nov 2026
3.89 MB
Version 1.0 - 02 Nov 2026 PPTX - 3.89 MB
1.0 02 Nov 2026
1.0 02 Nov 2026
16.78 KB
Version 1.0 - 02 Nov 2026 XLSX - 16.78 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want to be able to successfully switch my Energy Supplier with minimal delay or hassle, so that I can start to receive the service and tariff from my chosen Energy Supplier at the earliest opportunity.
  2. As the Authority, I want the necessary changes made to the Retail Energy Code to introduce the obligations, processes and provisions for the new switching arrangements, to enable the successful transition to enduring governance and operational arrangements.
  3. As a REC Party, I want to be clear on the obligations I need to meet and the processes I need to follow post CSS go live, to ensure my organisation is ready for the introduction of the new switching arrangements.
  4. As a REC Service Provider, I want to be clear on the obligations, processes and service standards that I need to meet, to ensure my organisation is ready for the introduction of the new switching arrangements.
Proposed Solution Document
Document title
REC V3.0 Baselined documents
Upload document
R0041 Legal Text.zip
Archive
Off
Document title
REC v3.0 Baselined documents (REC Portal)
Archive
Off
Problem Statement
Changes are required to the REC, to ensure the appropriate obligations, processes and provisions are defined within the REC at CSS go-live, enabling successful transition to enduring governance and operational arrangements developed as part of Ofgem’s Switching Programme.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0041 - Change Proposal Form
Letter from the Authority to the REC Code Manager - REC V3.0 Authority Change Proposal
R0041 - Change Proposal Plan v1.0 (Approved)
R0041 - Initial Assessment Report v2.0 (Approved)
R0041 - Final Change Report v3.0 (Post-Vote)
R0041 Authority Decision
Company Name
Ofgem
Review status
Review required