Introduction of Defined Electricity Metering Work Categories for Metering Accreditation

Date of latest update
Type
Issue
ID
I0335
Change Category
Change Path
Priority
Urgent
No
Latest Update
03/11/2026 The Information Request has closed and the Consolidated Responses have been published.
Summary
Currently, there are no clearly defined or standardised categories of work for electricity third-party activities within CoMCoP. This lack of categorisation reduces transparency of company capabilities and scope of work, limits the ability to align accreditation with actual operational activity and restricts the ability to apply targeted, risk-based audit assurance.
Proposer
David Haddock
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Poppy Mullins
Solution Development
I0335 submission form.pdf
I0335 - Change Report (Proposal Plan) v1.0
I0335 - Change Report (Proposal Plan) v1.0 Approved 15.09.26
I0335 Consolidated IR Responses NON-CONFIDENTIAL v0.1.pdf
Company Name
Wilcock Consultants Ltd
Review status
Review required

Review of Metering Accreditation

Date of latest update
Type
Issue
ID
I0334
Priority
Urgent
No
Latest Update
04/09/2026 - This Issue has now been withdrawn given an anticipated wider review of Schedule 15 which will identify and implement clarifications throughout this Schedule, including clarification that were proposed under this Issue. If you wish to adopt this Issue, please contact the Code Manager by COB 18 September 2026.
Summary
This Change Proposal seeks to ensure that the REC is reflective of current practice regarding initial approval of Metering Equipment Manager, Electricity Metering Operative, Approved Meter Installer, and approved AMR Service Provider, that have been determined by the Metering Scheme Auditor, Wilcock Consultants Ltd, in April 2023.
Proposer
francine.peyroux-sissoko
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
Stages Selection
I0334 submission form
Company Name
Retail Energy Code
Review status
Review required

Regulatory Alliance Creation Rejections

Date of latest update
Type
Change
ID
R0331
Change Category
Change Path
Priority
Urgent
No
Latest Update
20/10/2026 The Change Report (Update to Plan) was approved by the REC Change Panel on 20 October 2026, and the Issue progressed to a Change Proposal on 22 October 2026.
Summary
An incident where Network Parties did not submit Regulatory Alliances on time to the Central Switching Service (CSS) Provider, or did submit the Regulatory Alliances but did not action rejections from the CSS Provider in a timely manner, led to over 200 Consumers being delayed in Switching to their chosen Energy Supplier. This Change Proposal has been raised to review this process.
Change Plan

Change Report (Proposal Plan) approved at Change Panel

Completed

Start:

Due:

Completion:

18 Aug 2026

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

03 Sep 2026

Update to plan approved by Change Panel

Completed

Start:

Due:

Completion:

20 Oct 2026
Impacted Consumers
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
Poppy Mullins
Solution Development
Proposed Solution Document
Document title
I0331 Schedule 24 Switching Data Management
Upload document
I0331 Schedule 24 Switching Data Management v0.6.docx
Archive
Off
Problem Statement
The lack of Service Level Agreements (SLAs) on Network Parties to submit Regulatory Alliances to the CSS Provider or to work any rejections received from the CSS Provider can lead to delays in Consumers being able to Switch to their chosen Energy Supplier.
SME
SME Role
Lead Assurance Analyst
I0331 submission form
I0331 Change Report (Update to Plan) - Approved 20/10/26
I0331 Change Report (Proposal Plan) V1.0 approved 18.08.26
I0331 Consolidated Impact Assessment Responses v2.0
I0331 Update to Plan Approved 20.10.2026
Company Name
SQE Energy
Review status
Review required

Removal of D0383 & D0384 requirements from Sharing MTDs process

Date of latest update
Type
Change
ID
R0328
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/11/26 - This Change Proposal has been implemented as part of the 6 November 2026 REC Release.
Summary
Schedule 14 - Metering Operations currently holds obligations for a Meter Operator Agent (MOA) to send a D0383 ‘Notification of Commissioning Information’ to Electricity Suppliers, Distribution Network Operators (DNOs), Data Services and Data Collectors in certain process steps. The D0383 was not shared with these Parties in legacy arrangements, and there is no requirement for it to be sent to facilitate the MHHS arrangements. There are similar requirements to send the D0384 ‘Notification of Commissioning Status’ to these Parties, when it is only required by the Electricity Supplier. These requirements were introduced by the MHHS Design in error and need to be removed.
Proposer
Harriet Truss
Change report - Final Change Report

Comments deadline
Change Plan

Change Report (Proposal Plan) approved at Change Panel

Completed

Start:

Due:

Completion:

21 Jul 2026

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

06 Aug 2026

Change Report (For Consultation) presented to Metering Expert Panel

Completed

Start:

Due:

Completion:

12 Aug 2026

Final Recommendation approved at MEP

Completed

Start:

Due:

Completion:

14 Oct 2026
Impacted REC Documents
Status
Implementation Date
Status Live
EMAR Version 4.4.0
Included changes Affected REC Items
R0180 Clarity on use of on hold for switching issues, including the obligations of CSS Users
  • Schedule 26 - Switching Service Management
R0207 Import / Export MOA Charging Clarification
  • Schedule 14 - Metering Operations
R0253 Theft - DNO/Networks not providing photos
  • Schedule 8 - Unbilled Energy Code of Practice
R0261 Addition of Export flag in D0303 flows
R0266 REC Data Specification Clarifications
  • Schedule 14 - Metering Operations
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Data Item Catalogue
  • Market Message Catalogue
R0317 Number of Displayed Register Digits Data Item linkage
R0328 Removal of D0383 & D0384 requirements from Sharing MTDs process
  • Schedule 14 - Metering Operations
R0336 Legal text to support REC Change R0180
  • Schedule 26 - Switching Service Management
R0343 MSC - Amending Statement Production Timescales
R0345 Housekeeping November 2026

Documents

Name Version Last updated Actions
331.85 KB
Version 1.0 - 11 Nov 2026 PDF - 331.85 KB
1.0 11 Nov 2026
1.0 11 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0328 legal text V0.1
Upload document
R0328 legal text V0.1.zip
Archive
Off
Problem Statement
Schedule 14 - Metering Operations puts obligations on MOAs which are both not required and impossible to fulfil (as the Scenario Variants to send the D0383 from the MOA to the Electricity Supplier, DNO, Data Service and Data Collector do not exist). There are similar problems for the D0384, which is only required to be sent from the MOA to the Electricity Supplier.
R0328 submission form
R0328 Change Report (Proposal Plan) v1.0 - approved 21.07.26
R0328 Change Report (For Consultation) V1.0 approved 12.08.26
R0328 Consolidated Consultation Responses v1.0
R0328 Change Report (Final Recommendation) V1.0 Approved 14.10.26
Company Name
REC Code Manager
Review status
Review required

Provision of Standard industrial Classification (SIC) Code to REC Parties

Date of latest update
Type
Issue
ID
I0327
Priority
Urgent
No
Latest Update
18/11/2026 - On 17 November 2026, the REC Change Panel approved the Change Report (Proposal Plan) for I0327 in line with the Code Manager's recommendation. The Information Request will close on 04 December 2026.
Summary
As part of the planning required to deliver Net Zero, Gas Distribution Networks (GDNs) are obligated to plan Industrial and Commercial (I&C) gas demand at a more granular, site-specific level. To meet this obligation, access to Standard Industrial Classification (SIC) Code data, matched to both Gas and Electricity Meter Point Reference Numbers, would provide a significantly improved understanding of I&C customers.
Proposer
Sally Hardman
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Lead Analyst
Poppy Mullins
Solution Development
Problem Statement
As part of the planning required to deliver Net Zero, Gas Distribution Networks (GDNs) are obligated to plan Industrial and Commercial (I&C) gas demand at a more granular, site-specific level. Ofgem, DESNZ and NESO increasingly require GDNs to present detailed information on the types of I&C activities operating within each Network footprint to support robust long-term whole-system planning. To meet this obligation, access to Standard Industrial Classification (SIC) Code data, matched to both Gas and Electricity Meter Point Reference Numbers, would provide a significantly improved understanding of I&C customers. This data would enable GDNs to:
- characterise current I&C gas demand more accurately,
- identify patterns and drivers of consumption across different industrial and commercial sectors, and
- engage more effectively with site operators to understand their ongoing and future energy needs.
By improving visibility of the industrial and commercial landscape across the network, GDNs would be able to plan current demand more effectively, better identify areas requiring continued investment, and support whole system partners such as DNOs where cross vector interactions may be relevant, ensuring planning decisions remain aligned with customers’ needs while supporting the broader Net Zero transition. This data would also improve targeted engagement with strategically significant I&C sites, allowing networks to better understand operation drivers, decarbonisation constraints and long-term energy requirements rather than that of current and historic consumption trends.
Workgroup
Workgroup(s)
I0327 submission form
Change Report - Proposal Plan
I0327 Change Report (Proposal Plan) Approved 17.11.26
Company Name
-
Review status
Review required

Erroneous Switch Review: Assurance Reporting Update

Date of latest update
Type
Issue
ID
I0326
Change Path
Priority
Urgent
No
Latest Update
On 30 October 2026, the REC Change Panel voted to approve this Extension to Plan for I0326 via ex-committee decision.
Summary
There is gap in the Erroneous Switch (ES) Performance Assurance reporting as the DTN does not provide MPXN level data up front. It requires individual ES permission before MPXNs are provided. However, CSS reporting does provide monthly MPXN level report. As such end-to-end monitoring of the ES process cannot be carried out at a MPXN level.
Proposer
Joy Nnamani
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
florentina.monea
Solution Development
Problem Statement
There is a lack of consistency in the level of data granularity provided for ES Performance Assurance reporting across industry systems. Specifically, the DTN provides only aggregated data unless explicit permission is obtained from individual Energy Suppliers for each MPxN, whereas the CSS routinely produces monthly reports at MPxN level. This misalignment restricts the ability to access comparable, detailed datasets across platforms and prevents effective end-to-end monitoring and assurance of the ES process at MPxN level.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0326 submission form
I0326 Change Report (Proposal Plan) (Approved) v1.1 07.07.26
I0326 Change Report (Update to Plan) Pre-Approval
I0326 Change Report (Update to Plan) v1.0 Approved 30.10.26
Company Name
RECCo
Review status
Review required

Use of REL Data to Support Key Regulations

Date of latest update
Type
Change
ID
R0324
Change Category
Change Path
Priority
Urgent
No
Latest Update
29/10/2026 - The Change Report (Final Recommendation) in line with the Code Manager recommendation, the REC Technical Expert Panel approved this Change Proposal for implementation on 26 February 2027. The appeal window is open until 12 November 2026.
Summary
The REC Electricity Enquiry Service (EES) Service Definition and Electricity Data Access Matrix (DAM) limits access of REL data to the Authority. This Issues seeks to extend access to the Code Manager and government departments in Great Britain to facilitate key government reporting and REC processes.
Proposer
James Hardy
Change Plan

Proposal Plan approved at Change Panel

Completed

Start:

Due:

Completion:

15 Sep 2026

Final Recommendation approved at TEP

Completed

Start:

Due:

Completion:

28 Oct 2026
Impacted REC Services
Implementation Date
Status Scheduled
EMAR Version 4.5.0_Scheduled
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Poppy Mullins
Solution Development
Proposed Solution Document
Document title
I0324 Draft Legal Text
Upload document
I0324 Draft Legal Text (1).zip
Archive
Off
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0324 submission form
I0324 Change Report (Proposal Plan and Consultation) v1.1 Pre-Approval
R0324 Change Report (Consultation) Approved 15.09.26
R0324 - Consolidated Consultation Responses v1.0
R0324 Change Report (Final Recommendation) v1.0 Pre Approval
R0324 Change Report (Final Recommendation) v2.0 Approved 28.10.26
Company Name
REC Code Manager
Review status
Review required

Erroneous Switch Review: I0237 Clarifications

Date of latest update
Type
Change
ID
R0322
Change Category
Change Path
Priority
Urgent
No
Latest Update
On 03 November 2026, the Change Panel, in line with Code Manager recommendation, voted to approve this Change Proposal. The appeal window is now open until 23:59 on 18 November.
Summary
The I0237 working group has carried out an end-to-end review of the Erroneous Switch process. The working group highlighted housekeeping changes and clarifications within Schedule 30 and the Market Messages.
Proposer
James Hardy
Change report - Final Change Report

Comments deadline
Implementation Date
Status Scheduled
EMAR Version 4.5.0_Scheduled
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
florentina.monea
Solution Development
Proposed Solution Document
Document title
Erroneous Switch Review - I0237 Clarifications (12.05.2026) V1.0
Upload document
Erroneous Switch Review - I0237 Clarifications (12.05.2026) V1.0.zip
Archive
Off
Document title
R0322 Legal Drafting V1.2
Upload document
R0322 - Legal Drafting.zip
Archive
Off
Problem Statement
The current Erroneous Switch drafting contains inconsistencies that can cause confusion and misunderstanding between Energy Suppliers regarding the applicable governance and process requirements, creating ambiguity around the correct contractual and operational framework. In addition, the I0237 Working Group has identified further required amendments to Schedule 30, highlighting that the existing drafting does not fully or accurately reflect intended process arrangements or correct terminology.
SME
SME Role
Lead Technical Analyst
R0322 submission form
R0322 - Change Report (Proposal Plan) V1.0 (Approved) 19.05.2026
R0322 Consolidated IA Responses
R0322 Change Report (For Consultation)
R0322 Consolidated Consultation Responses
R0322 Change Report (Final Recommendation) Approved
Company Name
REC Code Manager
Review status
Review required

DNOs Create Export MPANs after approving G98/99 commissioning documents

Date of latest update
Type
Change
ID
R0321
Change Category
Change Path
Priority
Urgent
No
Latest Update
04/11/2026 On 20 October 2026, the REC Change Panel voted, in line with the Code Manager's recommendation, to approve this Change Proposal. The appeal window is now closed. R0321 will be implemented on 25 June 2027.
Summary
The creation of Import Metering Points for new Premises sits with the Distribution Network Operator (DNO), while the Export Metering Points generally sit with the Electricity Supplier. When the DNO approves the G98 Engineering Recommendation Installation Document (Form B) or G99 Engineering Recommendation Installation Document (Form A3-1 or A3-2) under the Distribution Code, they could create Export Metering Points at this time (with the logical Disconnection process being available for any Export Metering Points that are then not required).
Proposer
Ben Atkinson
Change Plan

Change Report (Proposal Plan) approved at Change Panel

Completed

Start:

Due:

Completion:

05 May 2026

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

07 May 2026

Change Report (For Consultation) and Update to Plan approved at Change Panel

Completed

Start:

Due:

Completion:

17 Aug 2026

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

03 Sep 2026

Final Recommendation approved at Change Panel

Completed

Start:

Due:

Completion:

20 Oct 2026
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Implementation Date
Status Scheduled
EMAR Version 4.6.0_Scheduled

Documents

Name Version Last updated Actions
244.73 KB
Version 1.0 - 02 Nov 2026 PDF - 244.73 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Schedule 27 RMP lifecycle draft V0.1
Upload document
RMP Lifecycle draft for export MPANs - 21 November 2025(118301312) (1).docx
Archive
Off
Document title
Schedule 27 RMP lifecycle draft V0.2
Upload document
RMP Lifecycle draft for export MPANs - for consultation.docx
Archive
Off
Problem Statement
The information required by the DNO to create an Export Metering Point sits with the Consumer rather than the Electricity Supplier, and leads to the Electricity Supplier acting as an unnecessary third party in the process. This is leading to unnecessary time being added to the process, negatively impacting Consumers and the journey to Net Zero. This is particularly apparent for large new housing developments, which may have several tens of thousands of Export Metering Points to create with the same DNO and require the use of the Bulk Request process. This process is cumbersome and has no two DNOs operating the process in the same way.
SME
SME Role
Lead Assurance Analyst
R0321 submission form
R0321 Change Report (Proposal Plan) Approved 05.05.26
R0321 Consolidated Impact Assessment Responses v1.0 PUBLIC
R0321 Update to Plan V1.0 approved 18.08.26
R0321 Change Report (For Consultation) approved 18.08.26
R0321 Consolidated consultation responses - NON CONFIDENTIAL
R0321 Change Report (Final Recommendation) V1.0 Approved 20.10.26
Company Name
British Gas
Review status
Review required

Housekeeping June 2026

Date of latest update
Type
Change
ID
R0320
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
The Code Manager has identified a number of non-material clarifications, typographical errors and changes needed to REC products.
Proposer
Caroline Freimuller
Status
Implementation Date
Status Superseded
EMAR Version 4.3.0
Included changes Affected REC Items
R0267 Smart Meter Installation Surveys - Microbusiness requirements
  • Smart Meter Installation Schedule (since removed)
R0276 SFIC to CMRM - missing Scenario Variant in D0126 / MM00016
  • Market Message Catalogue
R0286 Clarification on Detailed Impact Assessment Activities
  • Schedule 5 - Change Management
R0291 Review of Schedule 1 Interpretations and Definitions
  • Schedule 1 - Interpretations and Definitions
R0299 Data Latency Targets for the GES Service Definition
R0300 Amendments to D0312 to align with BSC CP1622
  • Data Item Catalogue
R0307 Release and Licensing of the CoMCoP Logo for Accredited Parties
R0308 Update CCSG ToRs to include cross-code prioritisation as per Code Reform
R0310 Addition of value 11 to data item J0418
  • Data Item Catalogue
R0311 CoMCoP 2-year Audit Cycles
  • Schedule 15 - Metering Accreditation
R0316 Clarification of Data Items within the Payment Method Levelisation Supplier Data Reporting Specification
R0319 Clarification of in-year amendments to the CRS budget
R0320 Housekeeping June 2026
  • Schedule 1 - Interpretations and Definitions
  • Schedule 11 - Prepayment Arrangements
  • Schedule 7 - Energy Theft Reduction
  • Schedule 17 - Secure Data Exchange
  • Schedule 12 - Data Access
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
June 2026 Housekeeping Summary V1.0
Upload document
June 2026 Housekeeping Summary.xlsx
Archive
Off
Document title
June 2026 Housekeeping legal text (zip file)
Upload document
June 2026 Housekeeping legal text v2.0.zip
Archive
Off
Document title
June 2026 Housekeeping Summary V2.0
Upload document
June 2026 Housekeeping Summary (1).xlsx
Archive
Off
Document title
June 2026 Housekeeping legal text v3.0
Upload document
June 2026 Housekeeping legal text v3.0.zip
Archive
Off
Problem Statement
This Housekeeping Change Proposal seeks to make typographical and formatting corrections that have been identified and improve consistency across the REC.
R0320 Housekeeping Change Report v1.1
Company Name
REC Code Manager
Review status
Review required