Change Smart Meter Installation Consumer Survey Specification survey questions to a REC Category 2 document

Date of latest update
Type
Change
ID
R0177
Change Category
Change Path
Priority
Urgent
No
Latest Update
This change was implemented on 06 September 2024.
Summary
Adding the Smart Meter Installation Consumer Survey Specification questions to the REC list of documents will allow any amendments to follow the REC change process and allow anyone to propose such amendments.
Proposer
Lorna Mallon
Change Plan

Preliminary Change Report published

Completed

Start:

22 May 2024

Due:

05 Jul 2024

Completion:

04 Jul 2024

Consultation opened

Completed

Start:

05 Jul 2024

Due:

05 Jul 2024

Completion:

04 Jul 2024

Consultation closes

Completed

Start:

05 Jul 2024

Due:

26 Jul 2024

Completion:

26 Jul 2024

Final Change Report published

Completed

Start:

26 Jul 2024

Due:

09 Aug 2024

Completion:

08 Aug 2024

Change Panel decision

Completed

Start:

09 Aug 2024

Due:

20 Aug 2024

Completion:

20 Aug 2024
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.13.0_Superseded

Documents

Name Version Last updated Actions
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Domestic or Micro-Business Consumer, I want the Smart Meter Installation survey questions to have robust governance, so I have confidence the right KPIs are being monitored.
  2. As an Energy Supplier, I want the Smart Meter Installation survey questions to be governed by the REC Change Process, so I can suggest and provide feedback on changes to them.
Proposed Solution Document
Document title
REC Baseline Statement DRAFT
Upload document
REC Baseline Statement DRAFT.xlsx
Archive
Off
Problem Statement
The Smart Meter Installation Consumer Survey Specification questions are mandatory for Energy Suppliers to use, but there is no mechanism for Energy Suppliers to raise changes or issues against the questions as they are not held in the REC Baseline Statement.
R0177 Change Proposal Form
R0177 Change Proposal Plan v1.0 Approved
R0177 Initial Assessment Report v1.0 Approved
R0177 Preliminary Change Report v1.0
R0177 Consolidated Consultation Responses v1.0
R0177 Change Report (Final Recommendation) V1.1
Company Name
Gemserv
Review status
Review required

Introducing a Reasonable Endeavours Scheme within the REC

Date of latest update
Type
Issue
ID
I0175
Other Industry Codes impacted
Urgent
No
Latest Update
24/03/26 - Issue placed on hold pending development of Energy Theft Reduction White Paper
Summary
There is a current disincentive for a Supplier to pursue a particularly complex energy theft investigation where there is both little prospect of costs being recovered directly from the Consumer and those costs materially exceeding the Theft Detection Value under the TDIS.
Proposer
Samantha Briggs
Impacted Consumers
Status
Implementation Status
Date Raised
Solution Development
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
SME Role
Lead Assurance Analyst
SME User
awaghorn@deloitte.co.uk
I0175- Introducing a Reasonable Endeavours Scheme within the REC.docx
Company Name
REC Code Manager
Review status
Review required

Mandating ETTOS follow up

Date of latest update
Type
Issue
ID
I0174
Urgent
No
Latest Update
22/07/2025 - I0174 has been moved to Issue Resolved as the problem statement of this issue has been addressed under R0173 Improvements to TDIS, which will be implemented on 22/09/2025, with an effective date of 1/10/2025
Summary
It has been identified that not all ETTOS leads are flowing through into the theft outcome files. This proposal aims to assess this and clarify the appropriate procedure.
Proposer
Samantha Briggs
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Status
Implementation Status
Date Raised
Lead Analyst
florentina.monea
Solution Development
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
SME Role
Lead Assurance Analyst
SME User
awaghorn@deloitte.co.uk
I0174 - Mandating ETTOS follow up
Company Name
REC Code Manager
Review status
Review required

Improvements to the Theft Detection Incentive Scheme (TDIS)

Date of latest update
Type
Change
ID
R0173
Change Category
Urgent
No
Latest Update
22/09/25 - This Change Proposal has been implemented as part of the MHHS M8 22 September 2025 REC Release.
Summary
This Change proposes that not only Confirmed Energy Thefts are incentivised within the Theft Detection Incentive Scheme (TDIS) but also Energy Theft Desktop and Site Visit Investigations.
Proposer
Samantha Briggs
Change Plan

Party Impact Assessment Closure

Completed

Start:

20 May 2024

Due:

04 Oct 2024

Completion:

04 Oct 2024

Consultation

In Progress

Start:

04 Oct 2024

Due:

18 Oct 2024

Completion:

18 Oct 2024

Consultation Closure

Not Started

Start:

18 Oct 2024

Due:

08 Nov 2024

Completion:

Responsible Committee Decision

Not Started

Start:

08 Nov 2024

Due:

03 Dec 2024

Completion:

Send to Authority

Not Started

Start:

03 Dec 2024

Due:

04 Dec 2024

Completion:

Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
florentina.monea
Solution Development
Proposed Solution Document
Document title
R0173 - Draft Legal Text (26.11.2024)
Upload document
R0173 - Draft Legal Text.zip
Archive
Off
Document title
I0173 - Example Calculations (13.08.2024)
Upload document
I0173 - Example Calculations.pdf
Archive
Off
Document title
R0173 - Solution Development Report v2.4 (26.11.2024)
Upload document
R0173 - Solution Development Report v2.4.pdf
Archive
Off
Problem Statement
Suppliers are not currently meeting their TDIS Theft targets within each TDIS Reporting Year because there may be financial disincentives to undertake investigations where there is no assurance that such investigations would convert into a Confirmed Energy Theft.
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
SME Role
Lead Assurance Analyst
SME User
awaghorn@deloitte.co.uk
I0173- Improvements to the Theft Detection Incentive Scheme
I0173 - Change Report (Proposal Plan) Approved 20.08.2024.
R0173 - Consolidated Impact Assessment Responses_NON-CONFIDENTIAL (18.10.2024)
R0173 - Change Report (For Consultation) 18.10.2024
R0173 Consolidated Consultation Responses NONCONFIDENTIAL (26.11.2024)
R0173 Final Change Report (Post-vote)
R0173 Decision Letter
Change Panel Response - Ofgem send back of R0173
Change Panel Response - Ofgem send back of R0173 - Further Clarifications
R0173 Final Decision Letter
Company Name
REC Code Manager
Review status
Review required

End-to-End New Connections Process Review

Date of latest update
Type
Issue
ID
I0172
Priority
Urgent
No
Latest Update
On 05 February 2026, the Code Manager decided that I0172 would be closed as resolved. After extensive industry engagement, no REC Code changes were identified as necessary. All address management elements raised under I0172 will be handled under I0200. The Crossed Meters process review will be raised in a separate Change Proposal (REC Issue I0314).
Summary
The REC Code Manager is conducting a end-to-end review of the new connections process, examining issues that occur across all industry codes.
Proposer
Paul Gath
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Problem Statement
Reported inconsistencies in the application of elements of the entire new connections process result in poor Consumer outcomes. Whilst the new connections process spans multiple processes owned by different Codes, the REC Code Manager is conducting an exploratory initial analysis, owing to our place as a dual-fuel, Consumer facing Code. This analysis is expected to yield multiple modifications across multiple Codes that will result in improvements to the new connections process.
I0172 - Issue Proposal Form (pdf)
I0172 Change Report (Proposal Plan) V2.0 (17.06.2025)
I0172 - Update to Plan V1.1 (17.06.2025) Approved
Non-IGT Gas Meter Install Process Map (August 2025 Change Issues Group)
I0172 - Update to Plan V2.0 (09.12.2025) Approved
Company Name
-
Review status
Review required

Clarify & Strengthen CRS Providers Requirements

Date of latest update
Type
Change
ID
R0168
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented on 28 February 2025.
Summary
The RECCo MSI review focused on the analysis and assessment of; Code compliance, performance, impacts and insights from lessons learned feedback from impacted stakeholders. These assessments thematically articulated changes and improvements identified to assure industry market participants that clear and appropriate action is, and will be, taken to prevent, detect and mitigate the risks and impacts of another event, and prepare for the right response to any future incidents. This Issue has been raised to address learnings from the P1 switching incident in July 2023.
Proposer
glenn.sheern
Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 3.16.0_Superseded

Documents

Name Version Last updated Actions
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed solution summary
  1. Root Cause Communication: That the DCC, in its role as Switching Operator, delivers, clear, accurate, timely information on the incident root cause, as soon as possible, once it has obtained a reasonable understanding. Both to offset the risks of uncertainty and limited information introduce, ensuring Switching parties (like Supplier, TPIs and Networks) have the right information to enable meaningful engagement, assist their end-consumers, and all impacted Market Participants can more proactively manage the incident impacts, including making appropriate plans in response to the incident and its resolution. Switching Operator's End-Consumer Communication: Introduce a requirement for the DCC, in its role as the Switching Operator, to provide end-consumer appropriate information for REC Parties and Non-REC Parties use to determine communication and action for their Consumers.
  2. Switching Operator, Switching Incident Impact Assessment: This change should clarify the existing Switching Operator’s broader obligation to assess an incidents impact on the wider Switching Arrangements (set out in REC Schedule 26, Switching Service Management Schedule (SSMS), section 1.7, or Major Switching Incidents starting at section 2.9), to ensure the Switching Operator facilitates the most effective, efficient (time, cost, resource) overall Switching industry solution is promoted and implemented. Incident Wider Switching Impact Assessment: Clarify that if a Major Switching Incident is not going to be resolved within defined Service levels (4 hours), then the DCC in its role as Switching Operator should determine the impact on compliance with the REC end-to-end Switching Arrangements, and work with Ofgem, and the Code Administrators for BSC, UNC and DCUSA, and RECCo, to identify the cross code impacts/impacts on other Codes when managing an incident and developing an appropriate solution for industry, with least negative impact to end-consumers.
  3. Refresh and testing of Switching Operator’s (SO) incident related policies, processes, and procedures, to ensure they remain fit for purpose.
  4. Refresh and testing of Switching Operator’s (SO) incident related policies, processes, and procedures, to ensure they remain fit for purpose.
Proposed Solution Document
Document title
I0168 Switching Operator MSI Best Practice Document - for RFI and Industry Comments (02.08.2024)
Upload document
I0168 Switching Operator MSI Best Practice Document - for RFI and Industry Comments (2).docx
Archive
Off
Document title
Central Switching Service (CSS) Service Definition (R0168 - Red-lining) 05.12.2024
Upload document
Central Switching Service (CSS) Service Definition (R0168 - Red-lining) 05.12.2024.pdf
Archive
Off
Document title
Switching Operator (SO) Service Definition (R0168 - Red-lining) 05.12.2024
Upload document
Switching Operator (SO) Service Definition (R0168 - Red-lining) 05.12.2024.pdf
Archive
Off
Document title
Schedule 26 - Switching Service Management Schedule (R0168 - Red-lining) 05.12.2024
Upload document
Schedule 26 - Switching Service Management Schedule (R0168 - Red-lining) 05.12.2024.pdf
Archive
Off
Document title
R0168 Draft Switching Operator Best Practice Document (V1.0 for Industry Consultation) 05.12.2024 (Word Version)
Upload document
R0168 Draft Switching Operator Best Practice Document (V1.0 for Industry Consultation) 05.12.2024.docx
Archive
Off
Document title
R0168 Draft Switching Operator Best Practice Document (V1.0 for Industry Consultation) 05.12.2024 (PDF Version)
Upload document
R0168 Draft Switching Operator Best Practice Document (V1.0 for Industry Consultation) 05.12.2024.pdf
Archive
Off
Document title
R0168 - Change Report (for Consultation) 12.12.2024
Upload document
R0168 - Change Report (for Consultation) 12.12.2024.pdf
Archive
Off
Document title
Schedule 26 - Switching Service Management Schedule (R0168 - Red-lining) 28.01.2025
Upload document
Schedule 26 - Switching Service Management Schedule (R0168 - Red-lining) 28.01.2025.pdf
Archive
Off
Document title
Central Switching Service (CSS) Service Definition (R0168 - Red-lining) 28.01.2025
Upload document
Central Switching Service (CSS) Service Definition (R0168 - Red-lining) 28.01.2025.pdf
Archive
Off
Document title
Switching Operator (SO) Service Definition (R0168 - Red-lining) 28.01.2025
Upload document
Switching Operator (SO) Service Definition (R0168 - Red-lining) 28.01.2025.pdf
Archive
Off
Document title
Major Switching Incident: Switching Operator Best Practice Evaluation Form V1.0
Upload document
Major Switching Incident - Switching Operator Best Practice Evaluation Form V1.0.pdf
Archive
Off
Document title
Major Switching Incident: Switching Operator Best Practice Evaluation Form V1.0
Upload document
Major Switching Incident - Switching Operator Best Practice Evaluation Form V1.0.pdf
Archive
Off
Problem Statement
On 6th July 2023, a Major Switching Incident occurred with the Central Switching Service ((CSS) operated by the Switching Operator and CSS Service Provider, the Smart Data Communication Company (DCC)). It prevented the successful completion of that day’s planned electricity and gas, supply switches and new registrations. The CSS was stabilised post-incident and any new requests submitted after 9 a.m., 6th July were processed successfully. Through the collective action of the Switching Operator and industry parties, the CSS sent the missing industry messages to give effect to the intended switches and new registrations during the period of the 2nd to the 8th of August 2023. Priority 1 (P1) Major Switching Incidents of this nature are required to be resolved within 4 hours; however, DCC reported it took 1,605.6 hours in this instance. This incident had significant impacts on multiple industry parties and end consumers, demonstrating a clear need for improvement in the arrangements managing switching services and response to major incidents. The Retail Energy Code Company ((RECCo) with the assistance of its Code Manager) completed an end-to-end incident review; to identify the root cause, consider the efficiency and effectiveness of the incident management response, assess the improvements required, and identify appropriate actions for risk mitigation. With the overarching objective that by delivering the identified review recommendations, these actions should limit the possibility, or minimise the impact of, any future major switch incidents.
SME
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0168 - Issue Form
I0168 Switching Operator MSI Best Practice Document - for RFI and Industry Comments (02.08.2024)
I0168 - Change Report (Change Plan) (Approved) 17.09.2024
I0168 - Update to Proposal Plan (Approved 30.10.2024)
R0168 - Consolidated Consultation Responses (Non-Confidential) 20.01.2025
R0168 - Change Report (Final Reccomendation) 04.02.2025 (Approved) V2.0
Company Name
-
Review status
Review required

Change Process Improvements following Code Manager review

Date of latest update
Type
Change
ID
R0167
Change Category
Change Path
Priority
Urgent
No
Latest Update
19/07/24 - This change was implemented on the 19 July 2024.
Summary
This Change Proposal has been raised to make the required changes to Schedule1 and Schedule 5, to enable process enhancements to be made to support Change Process Improvements project.
Proposer
Helen Fosberry
Change Plan

Preliminary Change Reports Published

Completed

Start:

25 Apr 2024

Due:

17 May 2024

Completion:

17 May 2024

Consultation Published

Completed

Start:

17 May 2024

Due:

17 May 2024

Completion:

17 May 2024

Final Change Report Published

Completed

Start:

17 May 2024

Due:

07 Jun 2024

Completion:

25 Jun 2024

Responsible Committee Decison

Completed

Start:

07 Jun 2024

Due:

18 Jun 2024

Completion:

02 Jul 2024
Status
Implementation Date
Status Superseded
EMAR Version 3.11.1_Superseded
Included changes Affected REC Items
R0167 Change Process Improvements following Code Manager review

Documents

Name Version Last updated Actions
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want REC issues and changes that impact Consumers to be developed with Parties and Market Participants input, with minimal delay or hassle, so that I can benefit from positive Consumer outcomes at the earliest opportunity.
  2. As a REC Party or Market Participant, I want to participate effectively and efficiently in the REC Change Process including the development and progression of industry issues, to shape and develop solutions.
Proposed Solution Document
Document title
R0167 - Final Legal Text
Upload document
R0167 - Final Legal Text.zip
Archive
Off
Problem Statement
Feedback gathered has highlighted issues with the current process including speed of the process, engagement, and inefficiencies. Amendments are required to Schedule 1 and Schedule 5, that will support the provision of a suite of enhancements to the Change Process.
Change Proposal Form
R0167 - Change Proposal Plan (Approved)
R0167 - Initial Assessment Report (Approved)
R0167 - Preliminary Change Report v1.1 (Published for Consultation)
R0167 Consolidated Consultation Responses
R0167 Final Change Report v1.0 (Post Vote)
Company Name
REC Code Manager
Review status
Review required

Removal of the Green Deal Panel

Date of latest update
Type
Change
ID
R0166
Change Category
Change Path
Priority
Urgent
No
Latest Update
23/08/2024 - This change was successfully implemented as part of the August 2024 Extraordinary REC Release on 23 August 2024.
Summary
This Change Proposal seeks to remove the Green Deal Panel Terms of Reference from the REC Baseline Statement and product set, and to amend the Change Panel Terms of Reference to incorporate consideration of Green Deal business.
Proposer
Paul Rocke
Change Plan

Preliminary Change Report Published

Completed

Start:

22 Apr 2024

Due:

09 May 2024

Completion:

09 May 2024

Consultation Issued

Completed

Start:

09 May 2024

Due:

09 May 2024

Completion:

09 May 2024

Final Change Report Issued

Completed

Start:

09 May 2024

Due:

07 Jun 2024

Completion:

07 Jun 2024

Responsible Committee Decision

Completed

Start:

07 Jun 2024

Due:

18 Jun 2024

Completion:

18 Jun 2024
Status
Implementation Date
Status Superseded
EMAR Version 3.12.0_Superseded

Documents

Name Version Last updated Actions
159.49 KB
Version 1.0 - 02 Nov 2026 PDF - 159.49 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a party I want Green Deal matters, should they arise to be dealt with in a timely fashion. This could be difficult under the current arrangements where it is not possible to get a quorate panel to make decisions.
Proposed Solution Document
Document title
REC Change Panel - Terms of Reference - Red-lined
Upload document
REC Change Panel - Terms of Reference - Red-lined. V0.2.pdf
Archive
Off
Problem Statement
Since the REC was established, no business has been raised that would require the Green Deal Panel to meet and therefore the group has not yet convened. As well as being an unnecessary administrative consideration, it is a challenge to keep the Members and Chair abreast of the wider REC Change Process, and the Green Deal Panel may therefore find it more challenging to discharge its functions in the event that it needs to be convened.
Change Proposal Form
R0166 - Change Proposal Plan v1.0 (Approved)
R0166 - Initial Assessment Report (Approved)
R0166 - Preliminary Change Report V1.0
R0166 Final Change Report v1.0
Company Name
REC Code Manager
Review status
Review required

Prepayment Method Levelisation Reconciliation Housekeeping Change

Date of latest update
Type
Change
ID
R0165
Change Category
Change Path
Priority
Urgent
No
Latest Update
Implemented on 10/05/2024
Summary
The Code Manager has identified typographical and formatting errors, as well as opportunities to provide clarity, improve consistency and accuracy across the REC Services and products. These changes have been assessed as meeting the criteria to be progressed via a Housekeeping Change Proposal. Schedule 31 - Prepayment Method Levelisation Reconciliation: The Electricity and Gas Meter Point Portfolio Example's have typographical and formatting errors.
Proposer
Holly Law
Change Plan

House Keeping Change report published

Completed

Start:

16 Apr 2024

Due:

25 Apr 2024

Completion:

25 Apr 2024

Responsible Committee Decision

Not Started

Start:

25 Apr 2024

Due:

07 May 2024

Completion:

Status
Implementation Date
Status Superseded
EMAR Version 3.10.1_Superseded
Included changes Affected REC Items
R0165 Prepayment Method Levelisation Reconciliation Housekeeping Change
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
holly.law
Solution Development
Proposed Solution Document
Document title
Payment Method Levelisation Reconciliation V1.1
Upload document
Payment Method Levelisation Reconciliation v1.1.doc
Archive
Off
Problem Statement
This is a Housekeeping Change Proposal subject to the Housekeeping Change Proposal process, rather than the standard change process. The nature of the change is that it makes non-material changes to the REC Products to correct typographical and consistency errors. It also provides an opportunity to introduce necessary clarifications.
Gas Template AAA_01.csv
Electricity Template FFFF_01.csv
R0165 Housekeeping Change Report Post Vote
Company Name
Code Manager RPS
Review status
Review required

Removing the Enumerations from Communications Method Data Item (J0386) to align with BSC CP 1594

Date of latest update
Type
Change
ID
R0164
Change Path
Priority
Urgent
No
Latest Update
23/08/2024 - This change was successfully implemented as part of the August 2024 Extraordinary REC Release on 23 August 2024.
Summary
BSC has raised Change Proposal CP1594 which seeks to create an approvals process and a valid set for communications method. This change is proposing to create an approvals process to allow for the managed end dating of older technologies, such as Public switched telephone network (PSTN), Circuit Switched Data (CSD) and later 2G, and the assessment of the validity of newer communications technologies, such as (but not exclusively) Narrow Band-Intern of Things (NBIoT) and Category M (CAT-M). The evolution of metering communication systems underscores the need for timely updates. Legacy systems risk inefficiencies and potential security vulnerabilities. Implementing an approval process, modelled on BSCP601, ensures a standardised approach to introducing new technologies and managing the exit of old ones. Further justifications include: • To allow for the centrally managed end-dating of redundant communications technologies in line with known deadlines for those technologies to become redundant and unreliable. • To allow for the wider industry education of newer types of communication technologies. • To create and expand the already existing central knowledge base of the evolution and attributes of newer communication technologies as they relate to Settlement Metering Equipment. • To ensure transparency for all industry participants on the newer communications types available and the dates for which legacy communications must be removed. CP1594 will create a valid set, linked to the new approval process and using Data Item J0386 as a conduit to detail the approved communication methods as well as end dates for communication methods which are becoming redundant and unreliable.
Proposer
Christopher Day
Change Plan

PARTY IMPACT ASSESSMENT ISSUED

Completed

Start:

16 Apr 2024

Due:

25 Apr 2024

Completion:

25 Apr 2024

PRELIMINARY CHANGE REPORT AND CONSULTATION ISSUED

Completed

Start:

25 Apr 2024

Due:

23 May 2024

Completion:

23 May 2024

FINAL CHANGE REPORT ISSUED

Completed

Start:

23 May 2024

Due:

20 Jun 2024

Completion:

20 Jun 2024

RESPONSIBLE COMMITTEE DECISION

Completed

Start:

20 Jun 2024

Due:

02 Jul 2024

Completion:

02 Jul 2024
Status
Implementation Date
Status Superseded
EMAR Version 3.12.0_Superseded

Documents

Name Version Last updated Actions
159.49 KB
Version 1.0 - 02 Nov 2026 PDF - 159.49 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Lydia Bentley
Solution Development
Proposed solution summary
  1. As a Supplier/DNO/MEM, I want to ensure that Market Messages I send or receive to contain up-to-date, accurate data, so that I am able to effectively engage with the wider industry.
  2. As a non-REC Party Service User I want to ensure that Market Messages I send or receive to contain up-to-date, accurate data, so that I am able to effectively engage with the wider industry.
Proposed Solution Document
Document title
R0164 - Draft Solution - J0386 Data Item - Data Spec Changes 22.05.24
Upload document
R0164 - Draft Solution - Redlined Data Spec Changes 22.05.24 (1).pdf
Archive
Off
Problem Statement
The BSC are making changes to how permissible Outstation communication methods are captured and recorded within the industry. In order to align with these BSC led changes, the REC Data Specification must be reviewed in order to update the affected Data Item – DI50178 (J0386).
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0164 - Change Proposal Form (Word)
R0164 Change Proposal Form (PDF)
R0164 Change Proposal Plan (Approved) V1.0
R0164 Initial Assessment Report (Approved) V1.0
R0164 Consolidated Impact Assessment Responses v1.0 23.05.24
R0164 Preliminary Change Report (Published For Consultation) V1.0 23.05.24
R0164 Consolidated Consultation Responses v1.0 20.06.24
R0164 Final Change Report (Post-Vote) v1.0 03.07.24
Company Name
Elexon
Review status
Review required