Regulatory Alliance Creation Rejections

Date of latest update
Type
Change
ID
R0331
Change Category
Change Path
Priority
Urgent
No
Latest Update
20/10/2026 The Change Report (Update to Plan) was approved by the REC Change Panel on 20 October 2026, and the Issue progressed to a Change Proposal on 22 October 2026.
Summary
An incident where Network Parties did not submit Regulatory Alliances on time to the Central Switching Service (CSS) Provider, or did submit the Regulatory Alliances but did not action rejections from the CSS Provider in a timely manner, led to over 200 Consumers being delayed in Switching to their chosen Energy Supplier. This Change Proposal has been raised to review this process.
Change Plan

Change Report (Proposal Plan) approved at Change Panel

Completed

Start:

Due:

Completion:

18 Aug 2026

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

03 Sep 2026

Update to plan approved by Change Panel

Completed

Start:

Due:

Completion:

20 Oct 2026
Impacted Consumers
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
Poppy Mullins
Solution Development
Proposed Solution Document
Document title
I0331 Schedule 24 Switching Data Management
Upload document
I0331 Schedule 24 Switching Data Management v0.6.docx
Archive
Off
Problem Statement
The lack of Service Level Agreements (SLAs) on Network Parties to submit Regulatory Alliances to the CSS Provider or to work any rejections received from the CSS Provider can lead to delays in Consumers being able to Switch to their chosen Energy Supplier.
SME
SME Role
Lead Assurance Analyst
I0331 submission form
I0331 Change Report (Update to Plan) - Approved 20/10/26
I0331 Change Report (Proposal Plan) V1.0 approved 18.08.26
I0331 Consolidated Impact Assessment Responses v2.0
I0331 Update to Plan Approved 20.10.2026
Company Name
SQE Energy
Review status
Review required

REC Change to Align with DCP467 Asset Condition Reporting

Date of latest update
Type
Change
ID
R0306
Change Category
Change Path
Priority
Urgent
No
Latest Update
11/11/2026 - the Metering Expert Panel voted to approve placing this Change Proposal on hold until the solution of DCP467 has been finalised.
Summary
DCUSA change DCP467 has been raised to propose that Category A and B defects reported currently using the Asset Condition Report (D0135) or phone call to the DNO, should instead be reported via an online reporting tool where the DNO has one available. This is expected to have impacts to the REC.
Proposer
Caroline Freimuller
Change Report - Initial Assessment and Change Plan Report

Comments deadline
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 4.4.0
Included changes Affected REC Items
R0180 Clarity on use of on hold for switching issues, including the obligations of CSS Users
  • Schedule 26 - Switching Service Management
R0207 Import / Export MOA Charging Clarification
  • Schedule 14 - Metering Operations
R0253 Theft - DNO/Networks not providing photos
  • Schedule 8 - Unbilled Energy Code of Practice
R0261 Addition of Export flag in D0303 flows
R0266 REC Data Specification Clarifications
  • Schedule 14 - Metering Operations
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Data Item Catalogue
  • Market Message Catalogue
R0317 Number of Displayed Register Digits Data Item linkage
R0328 Removal of D0383 & D0384 requirements from Sharing MTDs process
  • Schedule 14 - Metering Operations
R0336 Legal text to support REC Change R0180
  • Schedule 26 - Switching Service Management
R0343 MSC - Amending Statement Production Timescales
R0345 Housekeeping November 2026

Documents

Name Version Last updated Actions
331.85 KB
Version 1.0 - 11 Nov 2026 PDF - 331.85 KB
1.0 11 Nov 2026
1.0 11 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0306 STIRG Guidance Document draft V0.1
Upload document
I0306 STIRG Guidance Document draft V0.1.docx
Archive
Off
Document title
I0306 Data Spec changes v0.1
Upload document
I0306 Data Spec changes.docx
Archive
Off
Document title
R0306 STIRG Guidance Document draft V0.2
Upload document
I0306 STIRG Guidance Document draft V0.2.docx
Archive
Off
Document title
R0306 Data Spec changes V0.2
Upload document
I0306 Data Spec changes V0.2.docx
Archive
Off
Problem Statement
Where DNOs have enhanced reporting tools for Category A or Category B situations, it is not mandatory for Parties to submit reports using this method. This may lead to a detrimental Consumer experience, as it is limited what information can be provided over the telephone or via Market Message (e.g. it is not possible to provide photographs of the situation).
Workgroup
Workgroup(s)
I0306 submission form
I0306 Change Report (Proposal Plan) V1.0 approved 03.02.26
I0306 Consolidated Impact Assessment Responses V1.0
R0306 Change Report (For Consultation) V1.1
R0306 Consolidated Consultation Responses v1.1 PUBLIC
R0306 Change Proposal Re-Plan v1.0 approved 08.07.26
R0306 Change Proposal Re-Plan v2.0 approved 11.11.26
Company Name
-
Review status
Review required

Establishing the Safe Isolation Provider (SIP) as a Standalone REC Party

Date of latest update
Type
Issue
ID
I0278
Change Category
Change Path
Priority
Urgent
No
Latest Update
21/07/2026 - An Update to Plan has been approved by the Change Panel on 21 July 2026.
Summary
This proposal recommends the formal recognition of the Safe Isolation Provider (SIP) as a standalone Party under the Retail Energy Code (REC). This aligns with the direction set out in Ofgem’s recently published Strategic Direction Statement (SDS), which explicitly calls for the establishment of SIPs as a standalone Party role. The aim is to address the growing scale of unregulated SIP activity, mitigate associated consumer safety risks, and ensure the metering industry is equipped to support the UK’s Net Zero ambitions. By enabling easier access to certified SIPs, this change will enhance consumer protection, accelerate low-carbon technology deployment, and improve operational efficiency across the energy sector.
Proposer
Rebecca Griffiths
Change Report - Initial Assessment and Change Plan Report

Comments deadline
Impacted Consumers
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Problem Statement
The current SIP framework poses several risks: - Consumers, MEMs and unaccredited practitioners’ safety. Unaccredited and unregulated isolation work increases the risk of unsafe installations and potential harm to Consumers. NAPIT highlighted to RECCo and DESNZ that 17 and 13 unregulated practitioners respectively died in 2023 and in 2024 due to unsafe isolation. With the right Party undertaking this work, there would also be less safety issues for the Consumer at their premises; - Inequity. Independent Installers face longer wait times compared to supplier-led installations, creating a two-tier system; - Low competitive market. Currently prospective Parties can be put off from applying to be a SIP as it appears they would need full MEM Accreditation which is often too far outside their current business operating model. Providing SIPs with their own pathway and requirements could result in more Parties becoming SIPs and therefore giving Consumers more choice in their provider; and - Decarbonisation delays. The inability to scale SIP capacity undermines the timely deployment of LZCTs, threatening Net Zero targets.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
I0278 submission form
I0278 Change Report (Proposal Plan) V1.0 (Pre-Approval) 09.10.2025
I0278_Change Report (Extension to Plan) v1.0 (Pre-Approval) 12.01.2026
I0278_Change Report (Extension to Plan) v2.0 (Pre-Approval) 13.07.2026
I0278_Change Report (Extension to Plan) v2.1 (Approved) 21.07.26
I0278_Consolidated Information Request DNO Responses
I0278_Consolidated Information Request MEM-SIP Responses PUBLIC
I0278_Consolidated Information Request RPA Responses
Company Name
RECCo
Review status
Review required

REC Changes to tie in with DCP451 - Suspending Registrations

Date of latest update
Type
Change
ID
R0248
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
A DCUSA Change Proposal - DCP 451 ‘Suspending Registrations’ - has been raised to look into this issue. The solution must consider a cross-code solution, which does not put consumer outcomes at risk.
Proposer
Vaishnavi Sharma
Change Plan

Change Report (Proposal Plan) approved by Change Panel

Completed

Start:

Due:

Completion:

17 Jun 2025

Change approved

Completed

Start:

Due:

Completion:

05 Aug 2025
Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 4.1.0_Superseded
Included changes Affected REC Items
R0152 Revision to the Consolidated Metering Code of Practice (CoMCoP)
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0157 Removal of Facsimile as a Method of Code Communication
  • Schedule 14 - Metering Operations
  • Schedule 18 - Green Deal Arrangements
  • Standards Definition Document
  • Data Item Catalogue
R0191 Introduction of SLA for Supplier De-Registration on Disconnected Meters
  • Schedule 27 - RMP Lifecycle
R0205 Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches
R0212 Protecting Crimestoppers and their Contacts
R0215 Schedule 30 Switch Meter Reading Problems - Rejections and Timings
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
R0060 ERDS Service Definition timezone correction
  • Schedule 1 - Interpretations and Definitions
R0232 Non-Domestic Change of Occupier SDEP Screens (R0155 Solution)
R0243 Transfer of Standard Settlement Configuration and Time Pattern Regime Data Item Ownership
  • Data Item Catalogue
R0248 REC Changes to tie in with DCP451 - Suspending Registrations
  • Schedule 24 - Switching Data Management
R0254 Non-Domestic Change of Occupier Reporting (R0155 Solution)
R0255 Terms of Reference Updates
R0257 Change to REC for Data processing outside of EEA
R0263 Sharing Confirmed Energy Theft Data with the BSCCo
  • Schedule 7 - Energy Theft Reduction
R0269 Schedule 5 – Change Management: Clarity and Typographical Review
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0279 Housekeeping November 2025
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 7 - Energy Theft Reduction
  • Schedule 27 - RMP Lifecycle
  • Schedule 18 - Green Deal Arrangements
  • Schedule 24 - Switching Data Management
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Market Message Catalogue
R0227 Domestic Elective HH Switching
  • Schedule 23 - Registration Services
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0248 Switching Data Management draft
Upload document
I0248 Switching Data Management v0.2 draft.pdf
Archive
Off
Problem Statement
A lack of clarity on the process for when a DNO ends a Regulatory Alliance with an Energy Supplier can cause confusion with the Energy industry, and lead to poor Consumer outcomes if the correct process is not followed.
SME
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Issue proposal form
I0248 Change Report (Proposal Plan) V1.0
R0248 Change Report (For Consultation) v1.0
R0248 Consolidated Consultation Responses V1.0
R0248 Change Report (Final Recommendation) V1.0 - approved 05.08.25
Company Name
REC Performance Assurance
Review status
Review required

Removal of Facsimile as a Method of Code Communication

Date of latest update
Type
Change
ID
R0157
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
The Public Switched Telephone Networks (PSTN) will be switched off in December 2025 by all telecom companies and will be replaced with an Internet Protocol (IP) digital network. Existing fax machines that are incompatible with new all IP digital networks will become obsolete and no longer capable of meeting Code Communications as prescribed in the REC. All communication methods referencing fax or facsimile will need to be removed and replaced with email (where this is not an existing option), unless an alternative form of communication is needed. Please note: The government have published preparatory guidance which includes migrating to IP-supported technology in advance of the planned decommissioning. UK transition from analogue to digital landlines - GOV.UK (www.gov.uk) Critical National Infrastructure (CNI) (“assets, facilities, systems, networks or processes and the essential workers that operate and facilitate them”) which is subdivided into 13 sectors including Energy, are advised to consider how they move to digital alternatives smoothly to avoid unnecessary interruption following the PSTN switch-off. Openreach's Energy Guidance Factsheet can be found in the CPs Accompanied Documents.
Proposer
Colette Baldwin
Change Plan

Preliminary Change Report and Consultation Issued

Completed

Start:

03 Jan 2024

Due:

09 Feb 2024

Completion:

09 Feb 2024

Final Change Report Issued

Completed

Start:

23 Feb 2024

Due:

12 Mar 2024

Completion:

12 Mar 2024

Responsible Committee Decision

Completed

Start:

12 Mar 2024

Due:

19 Mar 2024

Completion:

19 Mar 2024

Appeal Window Closure

Not Started

Start:

19 Mar 2024

Due:

02 Apr 2024

Completion:

Consultation Close

Completed

Start:

09 Feb 2024

Due:

23 Feb 2024

Completion:

23 Feb 2024
Impacted Consumers
Impacted REC Services
Status
Implementation Date
Status Superseded
EMAR Version 4.1.0_Superseded
Included changes Affected REC Items
R0152 Revision to the Consolidated Metering Code of Practice (CoMCoP)
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0157 Removal of Facsimile as a Method of Code Communication
  • Schedule 14 - Metering Operations
  • Schedule 18 - Green Deal Arrangements
  • Standards Definition Document
  • Data Item Catalogue
R0191 Introduction of SLA for Supplier De-Registration on Disconnected Meters
  • Schedule 27 - RMP Lifecycle
R0205 Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches
R0212 Protecting Crimestoppers and their Contacts
R0215 Schedule 30 Switch Meter Reading Problems - Rejections and Timings
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
R0060 ERDS Service Definition timezone correction
  • Schedule 1 - Interpretations and Definitions
R0232 Non-Domestic Change of Occupier SDEP Screens (R0155 Solution)
R0243 Transfer of Standard Settlement Configuration and Time Pattern Regime Data Item Ownership
  • Data Item Catalogue
R0248 REC Changes to tie in with DCP451 - Suspending Registrations
  • Schedule 24 - Switching Data Management
R0254 Non-Domestic Change of Occupier Reporting (R0155 Solution)
R0255 Terms of Reference Updates
R0257 Change to REC for Data processing outside of EEA
R0263 Sharing Confirmed Energy Theft Data with the BSCCo
  • Schedule 7 - Energy Theft Reduction
R0269 Schedule 5 – Change Management: Clarity and Typographical Review
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0279 Housekeeping November 2025
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 7 - Energy Theft Reduction
  • Schedule 27 - RMP Lifecycle
  • Schedule 18 - Green Deal Arrangements
  • Schedule 24 - Switching Data Management
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Market Message Catalogue
R0227 Domestic Elective HH Switching
  • Schedule 23 - Registration Services
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed solution summary
  1. All communication methods referencing fax or facsimile will need to be removed and replaced with email
Proposed Solution Document
Document title
Existing References to Fax and "e-mail" in the REC (January 2024)
Upload document
Existing Fax References in the REC.pdf
Archive
Off
Document title
R00157 - Legal Text Changes (All Affected REC Products and Documents)
Upload document
R00157 - Draft Legal Text Changes.zip
Archive
Off
Problem Statement
Existing fax machines that are incompatible with new all IP digital networks will become obsolete and no longer capable of meeting Code Communications as prescribed in the REC
CP Form - Removal of a Fax as a Code Communication method
R0157 - Change Proposal Plan V1.0 (Approved) 30.01.2024
R0157 - Initial Assessment Report V1.0 (Approved) 30.01.2024
R0157 - Consolidated Consultation Responses
R0157 - Preliminary Change Report V1.0 (For Consultation) 09.02.2024
R0157 - Final Change Report V2.0 (Post-Vote) 19.03.2024
Open Reach Energy Industry Factsheet
Company Name
REC Code Manager
Review status
Review required

Allowing different Metering Equipment Managers (MEMs) to be appointed to Import and Export Metering Points

Date of latest update
Type
Change
ID
R0144
Change Category
Priority
Urgent
No
Latest Update
17/02/2025 - R0144 has been withdrawn by the Proposer, alongside it's joint BSC Change P459, as they cannot be progressed prior to MHHS. The Proposer will look to re-raise both changes in the future. The adoption window for this withdrawal has closed.
Summary
The Export Supplier needs to be able to appoint different MEMs to that of the Import Supplier
Proposer
Kit Dixon
Impacted Consumers
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want a competitive Export market so I can get the best rates for the energy I generate. I want clear metering equipment ownership so I can be confident my meter is functional and safe. I want accurate billing from my Export Supplier.
  2. As an Export Supplier, I want to be able to appoint the MEM that ties in with my commercial strategy.
  3. As a MEM, I want clear guidance on the responsibilities I have for any metering equipment I am appointed to.
Problem Statement
Export Suppliers may become non-compliant with industry regulations if they are unable to appoint the same MEM as the Import Supplier, for example when the Consumer switches Import Supplier or when the Import Supplier changes the appointed MEM.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
Change Proposal Form
R0144 Change Proposal Plan Withdrawal v1.0 (Pre Approval)
R0144 Change Proposal Plan v1.0 (16.04.2024) Approved
R0144 Initial Assessment Report v1.0 (16.04.2024) Approved
Company Name
REC Code Manager
Review status
Review required

Revision of the Implementation Date and approved solution for R0021

Date of latest update
Type
Change
ID
R0101
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
30/06/2023 - This change was implemented on 30 June 2023 as part of the June 2023 REC Release
Summary
Updated 28 April 2023: Following discussions with DCUSA and Ofgem, this change has been amended to remove reference to deferral of R0021. The Change will focus on providing clarity on the proposed solution and Market Messages to be used when Safe Isolation Works are undertaken. The implementation approach has been amended to a Phased Implementation Approach between 30 June and 03 November 2023.
Proposer
tina.pearce
Change Plan

Solution Analysis and Development

Completed

Start:

23 Mar 2023

Due:

31 Mar 2023

Completion:

31 Mar 2023

Responsible Committee Review Completed

Completed

Start:

31 Mar 2023

Due:

27 Apr 2023

Completion:

27 Apr 2023

Consultation Started

Completed

Start:

27 Apr 2023

Due:

28 Apr 2023

Completion:

28 Apr 2023

Consultation Ended

Completed

Start:

28 Apr 2023

Due:

16 May 2023

Completion:

16 May 2023

Final Change Report Issued

Completed

Start:

16 May 2023

Due:

19 May 2023

Completion:

19 May 2023

Responsible Committee Recommendation

Completed

Start:

19 May 2023

Due:

26 May 2023

Completion:

26 May 2023
Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 3.5.0_Superseded
Included changes Affected REC Items
R0101 Revision of the Implementation Date and approved solution for R0021
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
R0102 Revision of the approved solution for R0032
  • Data Item Catalogue
  • Market Message Catalogue
R0114 Housekeeping amendments
  • REC Main Body
  • Schedule 1 - Interpretations and Definitions
  • Schedule 2 - REC Transition Schedule
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)
R0015 Remote communication obligations for electricity Advanced Meters
  • Schedule 14 - Metering Operations
R0010 New Meter Types for Auxiliary Proportional Controllers (APCs)
  • Data Item Catalogue
  • Market Message Catalogue
R0011 Reporting of Additional EMR Backing Data to Suppliers
  • Data Item Catalogue
  • Market Message Catalogue
R0021 Allowing REC accredited MEMs to de-energise and re-energise supply points independent of the Supplier
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
R0030 Erroneous Transfer Cancellations
  • Schedule 1 - Interpretations and Definitions
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Data Item Catalogue
  • Market Message Catalogue
R0066 Inclusion of SMRS Data Items in EES (BSC CP1568 Consequential Change)
R0032 New Registration data items and processes to support the transition to Market-wide Half-Hourly Settlement (MHHS)
  • Data Item Catalogue
  • Market Message Catalogue
R0090 Alignment of Data Specification with Pre-REC Rules and Consequential Impacts on R0011 Legal Text

Documents

Name Version Last updated Actions
1.0 02 Nov 2026
4.64 MB
Version 1.0 - 02 Nov 2026 PPTX - 4.64 MB
1.0 02 Nov 2026
199.58 KB
Version 1.0 - 02 Nov 2026 PDF - 199.58 KB
1.0 02 Nov 2026
124.69 KB
Version 1.0 - 02 Nov 2026 PDF - 124.69 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a premise owner I want to be able to contract with a Safe Isolator Provider (SIP), and for the SIP to be able to provide the service in a fully compliant manner.
  2. As a REC MEM who wants to operate as SIP, I need clarity on the solution and Market Message requirements when I provide Safe Isolation Works to Premise Owners. As a Registered Supplier, I need clarity on the solution and Market Message requirements when my consumers have Safe Isolation Works completed at their Premise Owners by SIPs.
  3. As a Distribution Network Operator, I need clarity on the solution and Market Message requirements when my connected parties have Safe Isolation Works completed at their Premise Owners by SIPs.
Proposed Solution Document
Document title
R0101 - Legal text changes for FCR - 19.05.2023
Upload document
R0101 - Draft Legal Text for FCR - 19.05.2023 (2).pdf
Archive
Off
Document title
FCR R0101 MM & Standards Definition v2.0
Upload document
FCR R0101 MM & Standards Definition v2.0 (1).zip
Archive
Off
Problem Statement
Updated: 28/04/2023. Following an implementation webinar for R0021 on 2 March, several matters were raised by Parties regarding the solution and the Market Messages that the Code Managers needs to address to ensure that the solution approved by Ofgem can be implemented successfully.
SME
SME Role
Lead Technical Analyst
R0101 Change Proposal Form (downloadable version) 23.03.2023
R0101 - Safe Isolation Provider Solution Overview - V5.0 19.5.2023
R0101 - Initial Assessment Report (approved) - v1.0 06.04.2023
R0101 - Change Proposal Plan - v3.0
R0101 Preliminary Change Report v2.0 (Approved) 28.04.2023
Phased Implementation Approach v1.0 28.04.2023
FAQ's Webinar 09 May 2023 v1.0
Non-Confidential Consolidated Consultation Responses v1.0 19.05.2023
R0101 - Draft Legal text for FCR v2.0 MM & Standards Definition
R0101 Final Change Report
Company Name
REC
Review status
Review required

Changes to allow DNOs to reinstate disconnected MPANs

Date of latest update
Type
Change
ID
R0095
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
The Code Manager have taken R0095 off of hold and published an Information Request for R0095 on 22 October 2026, this is open to responses until 13 November 2026.
Summary
When Meter Point Administration Numbers (MPANs) are erroneously disconnected, they cannot be reinstated. As a result, Consumers suffer billing issues and Registered Suppliers cannot settle against the disconnected MPAN. This change seeks to introduce a mechanism to restore erroneously disconnected MPANs.
Proposer
Leanne Yates
Change Plan

Solution Development

Completed

Start:

17 Feb 2023

Due:

26 Jan 2024

Completion:

26 Jan 2024
Impacted Consumers
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I do not want the erroneous disconnection of my MPAN to affect the continuity of my supply contract and billing arrangements.
  2. As a DNO, I want to be able to reverse erroneous disconnections with no lasting effect so that I don’t need to create a new MPAN to resolve the issue, thereby avoiding DUoS payment collection issues. 2 - As a Supplier, I want to be able to reverse erroneous disconnections with no lasting effect so that I can correctly bill my consumers. 3 - As the CSS, I want users to be able to effectively resolve discrepancies, so that industry data for their portfolio is accurate. 4 - As MPRS, I want users to be able to effectively resolve discrepancies, so that industry data for their portfolio is accurate.
Problem Statement
When MPANs are incorrectly identified and targeted for disconnection, the RMP will be erroneously terminated following receipt of Termination Market Messages by the CSS. This process is irreversible once triggered, meaning that there is no mechanism to restore the MPAN as it was previously. This results in a poor Consumer experience, and settlement misbalancing for Registered Suppliers. Currently, there is no mechanism to mitigate the negative impact on Registered Suppliers/DNO and Consumers.
SME
SME Role
Lead Technical Analyst
R0095 - Change Proposal form downloadable version 17.02.2023
R0095 Change Proposal Plan v1.0 (Approved) - 20.09.23
R0095 Initial Assessment Report v1.0 (Approved) - 20.09.2023
R0095 - Change Proposal Re-Plan (Approved) v1.0-13.12.23
Company Name
-
Review status
Review required

Introduction of a new Meter Asset Condition Code

Date of latest update
Type
Change
ID
R0072
Priority
Urgent
No
Latest Update
19/09/2024 - Change Proposal R0072 has been rejected and raised to Ofgem to consider. Despite earlier acceptance, the Code Manager believes that the proposal is not relevant to the REC and cannot progress any further.
Summary
This change seeks to introduce a new Asset Condition Code where further investigation is required by a Distribution Network Operator, where is there suspected asbestos in the metal encased cut-out
Proposer
Clive Wicks
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
R0072 - Change Proposal Form
Company Name
Consumer
Review status
Review required

24/7 Emergency Metering Service

Date of latest update
Type
Change
ID
R0053
Change Category
Priority
Urgent
No
Latest Update
01/05/25 - Proposal withdrawn at proposers request.
Summary
This change has been raised to address the issue that Suppliers currently are not required to provide a 24/7 emergency metering service that enables a Consumer to speak to an agent and/or receive a visit from a field operative outside normal business hours when faced with power loss situation relating to a metering issue. This Change Proposal has been raised to assess and consider the options to address this issue.
Proposer
Bryan Heap
Change Plan

Solution Analysis and Development

In Progress

Start:

17 Jun 2022

Due:

26 May 2023

Completion:

Impacted Consumers
Impacted REC Documents
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As an Energy Consumer, I want my metering fault to be identified and fixed as soon as possible, so that I am not left in a situation where I have no electricity for an extended period. I want to be able to contact the correct Party to fix my metering fault. I want my personal circumstances to be taken in to account when arranging for a fault to be fixed out of standard working hours.
  2. As a DNO, where there is a meter fault identified I want to be able to contact the Energy Supplier to rectify this, no matter what day or time this is identified, so that Consumers are not left without power for extended periods, during which time they may require ongoing help, support and communication. As an Energy Supplier, I want to provide my Customers with accurate and relevant Emergency contact information. As an Energy Supplier, I want to be able to respond to meter faults in a timely manner and not leave Consumers without power for an extended period.
  3. As a MEM, I want to be notified, in a timely manner, of faults that occur on Metering assets I am responsible for, so that I am able to rectify these without undue detriment being experienced by Consumers
Problem Statement
In situations where an Electricity Consumer experiences a loss of power, the DNOs who attend site to investigate and resolve the issues, are unable to do so when there is a meter issue, which is the responsibility of the Energy Supplier and it’s Appointed agents. When an issue occurs out of hours, or when an Energy Supplier does not have an out of hours metering service in operation, Consumers can be left without power for an extended period, this can create a safety or health concern, particularly for vulnerable Consumers or vulnerable members of their household.
Stages Selection
R0053 - Downloadable Change Proposal Form
R0053 - Change Proposal Plan v1.0 (pre-approval) 27/02/2023
R0053 - Initial Assessment Report v1.1 (Pre-Approval) 06.03.23
R0053 - Initial Assessment Report v2.0 (Approved) 07.03.2023
R0053 - Change Proposal Plan v2.0 (Approved) 07.03.2023
Company Name
Electricity North West Limited
Review status
Review required