Access to SDES for Gas Networks

Date of latest update
Type
Change
ID
R0162
Change Category
Change Path
Priority
Urgent
No
Latest Update
21/10/2025 - the REC Change Panel approved the withdrawal of the proposal plan for R0162 and that this Change would be placed on hold while I0285 progresses.
Summary
Raising on behalf of the Gas Networks, who currently struggle to find who to email queries to within suppliers organisation. Suppliers and Electricity DNO's moved to SDES to ensure all communications were in a secure portal, with SLA's and for GDPR reasons, but Gas Networks do not have access to this portal, and not considered during the implementation of the system. They also obtain photo's when out on site to help resolve queries and would like somewhere to upload them to send to suppliers.
Proposer
Angela Joyce
Change Plan

Proposal Plan approved by Change Panel

Completed

Start:

Due:

Completion:

15 Apr 2025

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

01 May 2025

Change approved to go on hold at Change Panel

Completed

Start:

Due:

Completion:

21 Oct 2025
Impacted REC Services
Impacted REC Parties and Market Participants
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0162 Solution Development Report V1.0
Upload document
R0162 Solution Development Report V1.0.pdf
Archive
Off
Problem Statement
Energy Suppliers and Distribution Network Operators (DNOs) moved to SDES to ensure all communications were in a secure portal, with SLAs and for GDPR reasons. Gas Transporters do not have access to this portal, and were not considered during the implementation of the system. As such, communications are not being sent as securely as possible.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
CP Form Access to SDES for Gas Networks
R0162 Change Report (Proposal Plan) V1.0 Approved 15.04.2025
R0162 Consolidated Impact Assessment Responses v1.0
R0162 Extension to Plan V1.0 approved 27.08.25
R0162 Rebaseline Plan (withdrawal) V2.0 approved 21.10.25
Company Name
Octopus Energy
Review status
Review required

Enabling Robotics for SDEP

Date of latest update
Type
Change
ID
R0161
Change Category
Change Path
Priority
Urgent
No
Latest Update
24/03/26 - This Change is on hold pending the outcome of R0122 - SDEP Review Improvements
Summary
The Secure Data Exchange Portal (SDEP) is a mailbox that enables the transfer of sensitive customer related data in a way that ensures data is safe and secure. Suppliers are obliged to send and receive queries and escalations via the SDEP. Unfortunately, the SDEP has issues in bulk resolving processes which could be solved by the removal of the prohibition of the use of robotics. For example, there is no function to be able to retrieve cases specific to each team, work these and then automatically issue a response. Currently, to get the same kind of functionality, an agent or team lead would need to manually process. In another scenario, under REC schedule 30, as part of each of the processes, we are obliged to issue an escalation where there has been no response within set timeframes. Prior to SDEP implementation, we would be able to issue email escalations automatically where there was an absence of a response flow. With the SDEP this process is now manual: an agent will need to sign in to ECOES, navigate to the appropriate module, and input the data.
Proposer
David Morley
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
CP Form Enabling Robotics for SDEP
Company Name
OVO Energy
Review status
Review required

Amendment to the ‘Supplier Registration Report (MAP)’ report methodology

Date of latest update
Type
Change
ID
R0158
Change Category
Change Path
Priority
Urgent
No
Latest Update
28/06/2024 - Change implemented as part of the June 2024 REC Release
Summary
Meter Asset Providers (MAPs) can query the Gas Enquiry Service (GES) as part of their billing process to establish the Registered Gas Suppliers of their portfolio of Metering Assets. The reports via which MAPs can query the GES are not currently working exactly as intended due to incorrect wording in the GES Definition; this change seeks to rectify that.
Proposer
admin
Change Plan

Preliminary Change Report Issued

Completed

Start:

08 Feb 2024

Due:

15 Mar 2024

Completion:

15 Mar 2024

Consultation Issued

Completed

Start:

15 Mar 2024

Due:

15 Mar 2024

Completion:

15 Mar 2024

Final Change Report Issued

Completed

Start:

15 Mar 2024

Due:

12 Apr 2024

Completion:

12 Apr 2024

Responsible Committee Decision

Completed

Start:

12 Apr 2024

Due:

24 Apr 2024

Completion:

24 Apr 2024

Appeal Window Closure

Not Started

Start:

24 Apr 2024

Due:

08 May 2024

Completion:

Status
Implementation Date
Status Superseded
EMAR Version 3.11.0_Superseded
Included changes Affected REC Items
R0043 Commissioning of Works by the Crowded Meter Room Coordinator (CMRC) to Resolve Issues In Crowded Meter Rooms
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 12 - Data Access
  • Data Access Matrix (Electricity)
  • Data Item Catalogue
  • Market Message Catalogue
R0158 Amendment to the ‘Supplier Registration Report (MAP)’ report methodology
R0160 Electricity Supply to Hydrogen Electrolysers
  • Schedule 1 - Interpretations and Definitions
R0064 Creating a Meter Operator Agent and MOCoP Installer
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 9 - Qualification and Maintenance
R0070 Provision of Enduring Test Environments
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
  • Schedule 26 - Switching Service Management
  • Schedule 25 - Central Switching Service

Documents

Name Version Last updated Actions
159.49 KB
Version 1.0 - 16 Nov 2026 PDF - 159.49 KB
1.0 16 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
Lydia Bentley
Solution Development
Proposed solution summary
  1. As a Registered Gas Supplier, I want to receive accurate invoices from MAPs for use of their Metering Assets, so that I am not over or under charged. 2 - As a MAP, I want to be able to access accurate information about my portfolio so that I can be correctly remunerated by Suppliers. 3 - As the GES Provider, I want the reports that I am obligated to provide to be correctly defined, so that I am able to provide accurate data to MAPs regarding their portfolios.
Proposed Solution Document
Document title
R0158 Solution - Gas Enquiry Service (GES) Service Definition v1.3 (Draft) 15.03.24
Upload document
R0158 Solution - Gas Enquiry Service (GES) Service Definition v1.3 (Draft) 15.03.24.pdf
Archive
Off
Document title
R0158 Solution - Gas Enquiry Service (GES) Service Definition v1.3.1 (Draft) 11.04.24
Upload document
R0158 Solution - Gas Enquiry Service (GES) Service Definition v1.3.1 (Draft) 11.04.24.pdf
Archive
Off
Problem Statement
The GES Service Definition defines two reports that MAPs can use to query the CDSP to find out which Registered Gas Suppliers supply Metering Assets in their portfolio, so that they can bill them. Due to a drafting error in the GES Service Definition, this report is not working as intended, and MAPs are not able to ascertain the Registered Gas Supplier for their entire portfolio. This change seeks to rectify the drafting error and restore the intended functionality of the two reports.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0158 Change Proposal Form - Supporting Documents
R0158 Change Proposal Form
R0158 Change Proposal Form (PDF)
R0158 Initial Assessment Report (Approved) V1.0 06.03.24
R0158 Change Proposal Plan (Approved) V1.0 06.03.24
R0158 Preliminary Change Report (Published for Consultation) V1.0 15.03.24
R0158 Consolidated Consultation Responses V1.0 12.04.24
R0158 Final Change Report (Post-Vote) V1.0
Company Name
Xoserve
Review status
Review required

Updates to the CSS Message Business Data Validation Rules and Physical Interface Design Specification

Date of latest update
Type
Change
ID
R0156
Change Category
Change Path
Priority
Urgent
No
Latest Update
20/02/2024- Approved for implementation on the 23 February 2024.
Summary
This proposal aims to bring the Physical Interface Design Specification (PhID) into the Retail Energy Code as a Category 3 document as well as provide updates to the Central Switching Service (CSS) Message Business Data Validation rules (Category 2 document), aligning both documents with current CSS functionality.
Proposer
Caroline Milner
Change Plan

Preliminary Change Report and Consultation published

Completed

Start:

20 Dec 2023

Due:

19 Jan 2024

Completion:

19 Jan 2024

Consultation Close

Completed

Start:

19 Jan 2024

Due:

02 Feb 2024

Completion:

02 Feb 2024

Final Change Report Issued

Completed

Start:

02 Feb 2024

Due:

09 Feb 2024

Completion:

09 Feb 2024

Responsible Committee Decision

Completed

Start:

09 Feb 2024

Due:

20 Feb 2024

Completion:

20 Feb 2024
Status
Implementation Date
Status Superseded
EMAR Version 3.8.0
Included changes Affected REC Items
R0103 Central provision of DCC Technical Contacts for requesting test certificates
  • Schedule 26 - Switching Service Management
R0156 Updates to the CSS Message Business Data Validation Rules and Physical Interface Design Specification
R0071 DCC access to EES and GES
  • Schedule 12 - Data Access
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)

Documents

Name Version Last updated Actions
176.62 KB
Version 1.0 - 02 Nov 2026 PDF - 176.62 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
holly.law
Solution Development
Proposed Solution Document
Document title
Business Data Validation Rules v1.5.1 Redlining
Upload document
Business Data Validation Rules v1.5.1 - REDLINE.xlsx
Archive
Off
Document title
CSS Interface Design Specification v8.8.1 Redlining
Upload document
CSSINT~1 (1).pdf
Archive
Off
Problem Statement
There is a risk that without transparency of the document and changes to it, parties may use outdated versions of the PhID and Business Validation Rules and encounter errors in their systems.
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
CSS Interface Design Specification v8.8.1 - TRACKED.docx
Draft REC Baseline Statement R0156
Change Proposal Plan v.1.0 Approved
R0156 Initial Assessment Report v1.0 approved
Business Data Validation Rules v1.5.1 - REDLINE.xlsx
R0156 Preliminary Change Report
R0156 Consultation Response v1.0
R0156 Final Change Report approved
Company Name
REC Technical Services
Review status
Review required

Updates to the EES API Interface Specification

Date of latest update
Type
Change
ID
R0149
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/12/2023- This Change was implemented as part of the 6 December 2023 Extraordinary Release
Summary
The EES Provider has made some alterations to the EES API Interface Specification to incorporate new data items that support MHHS Stage 0 as well as some housekeeping changes and clarifications to the methods within the API.
Proposer
Elise Handy
Change Plan

Preliminary Change Report and Consultation published

Completed

Start:

20 Oct 2023

Due:

03 Nov 2023

Completion:

03 Nov 2023

Consultation close

Completed

Start:

03 Nov 2023

Due:

17 Nov 2023

Completion:

17 Nov 2023

Final Change Report issued

Completed

Start:

17 Nov 2023

Due:

22 Nov 2023

Completion:

22 Nov 2023

Responsible Committee Decision

Completed

Start:

22 Nov 2023

Due:

29 Nov 2023

Completion:

29 Nov 2023
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.7.0_Live

Documents

Name Version Last updated Actions
160.82 KB
Version 1.0 - 02 Nov 2026 PDF - 160.82 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As an EES API User, I want to ensure that I have the most up to date technical information so that I can use the API in the most effective way.
  2. As the EES Provider, I want to ensure that the most up to date technical information is available to Users.
Proposed Solution Document
Document title
EES API Interface Specification v3.1.5. Redline (30.10.2023)
Upload document
EES API Interface Specification v3.1.5. Redline (1).docx
Archive
Off
Problem Statement
The current version of the EES API Technical Specification (V3.1.4) does not contain the latest updates from the EES Provider. Without these updates, API users will not be able to utlilise the new data items or have further detail on the data items returned within SearchUtilityAddress and GetTechnicalDetailsByMpan.
R0149 - Change Proposal Form.docx
R0149 - Change Proposal Plan (Approved) 07.11.2023
R0149 - Preliminary Change Report (Published for Consultation) 03.11.2023
R0149 Initial Assessment Report (Approved) 07.11.2023
R0149 - Consolidated Consultation Responses (22.11.2023)
R0149 - Final Change Report v2.0 (Approved) 29.11.2023
Company Name
Code Manager
Review status
Review required

Data Specification Update for Refresh Functionality

Date of latest update
Type
Change
ID
R0146
Change Category
Change Path
Priority
Urgent
No
Latest Update
23/08/2024 - This change was successfully implemented as part of the August 2024 Extraordinary REC Release on 23 August 2024.
Summary
This change has been raised to update the Data Specification and to align it with the changes made during implementation of change proposal ‘R0067 – Introduction of CSS Refresh Functionality’.
Proposer
Michael Taylor
Change Plan

Preliminary Change Report Published

Completed

Start:

21 Aug 2023

Due:

16 May 2024

Completion:

16 May 2024

Consultation Issued

Completed

Start:

16 May 2024

Due:

16 May 2024

Completion:

16 May 2024

Final Change Report Issued

Data Specification Update for Refresh Functionality > Change Plan

Start:

16 May 2024

Due:

19 Jun 2024

Completion:

Responsible Committee Decision

Data Specification Update for Refresh Functionality > Change Plan

Start:

19 Jun 2024

Due:

26 Jun 2024

Completion:

Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.12.0_Superseded

Documents

Name Version Last updated Actions
159.49 KB
Version 1.0 - 02 Nov 2026 PDF - 159.49 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Market Participant, I need to understand any changes to Market Messages I send and receive that may impact my business, so I can engage in the change process and plan any required changes to my systems and processes.
Proposed Solution Document
Document title
R0146 Solution Development Report
Upload document
R0146 Solution Development Report v1.0.docx
Archive
Off
Document title
R0146 Attachment A - Proposed Data Specification Changes
Upload document
Attachment A R0146 Proposed Data Specification Changes v1.0.docx
Archive
Off
Problem Statement
Following implementation of R0067, a small number of Market Messages and Data Items need to be appropriately reflected within the Data Specification.
R0146 - Change Proposal Form
R0146 - Change Proposal Plan v1.0 (Approved)
R0146 - Initial Assessment Report v1.0 (Approved)
R0146 - Preliminary Change Report v1.0
R0146 Final Change Report (Post-Vote) v1.0 26.06.2024
Company Name
Code Manager
Review status
Review required

New value for Site Visit Check Code (J0024)

Date of latest update
Type
Change
ID
R0143
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
12/10/2023 - Change Proposal has been rejected, as the change needs to be raised under the Balancing & Settlement Code - as the impacted Data Item is a BSC owned Data Item, and is not able to be amended by a REC Change.
Summary
The Change introduces a change to the MM00036/(D0139), to introduce a new Site Visit Check Code to reflect site specific capacity charges being levied by the Distribution Network Operators (DNOs) on Suppliers for their Consumers.
Proposer
Peter Waymont
Change Plan

Impact Assessment Report Published

Completed

Start:

14 Aug 2023

Due:

25 Aug 2023

Completion:

25 Aug 2023
Impacted Consumers
Impacted REC Documents
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
colette.baldwin
Solution Development
Proposed solution summary
  1. As a Consumer, I need my Supplier to be aware of any charges that will be applied by the DNO for the provision of the connection while the site is De-energised.
  2. As a Supplier I need to know if charges are expected to be levied by the DNO for retained capacity for De-energised Metering Points, so that I can pass the costs on to my Consumer.
Problem Statement
DNOs need to be able to communicate to Suppliers that they will charge site-specific DUoS for de-energised sites where there is an ongoing need for the connection to be maintained.
Stages Selection
R0143 - Change Proposal Form
R0143 - Change Proposal Plan v1.0 2 Approved by Change Panel 05.09.2023
R0143 - IAR - New Site Visit Check Code v1.0 Approved by Change Panel 25.09.2023
Company Name
UK Power Networks
Review status
Review required

Amendment to Multiplication Factor Enumerations to Support Hydrogen Trials

Date of latest update
Type
Change
ID
R0142
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
28/06/2024 - Change implemented as part of the June 2024 REC Release
Summary
The H100 hydrogen gas trial involves the supply of hydrogen gas to households in place of natural gas. The quantity of gas supplies needs to be billed in a way that is comparable to standard gas supply. To facilitate the trial, a multiplication factor enumeration value must be established within the Data Specification that can replicate hydrogen’s calorific value, therefore allowing accurate billing.
Proposer
David Addison
Change Plan

SERVICE PROVIDER IMPACT ASSESSMENT ISSUED

Completed

Start:

11 Aug 2023

Due:

27 Nov 2023

Completion:

27 Nov 2023

PARTY IMPACT ASSESSMENT ISSUED

Completed

Start:

27 Nov 2023

Due:

01 Dec 2023

Completion:

01 Dec 2023

PRELIMINARY CHANGE REPORT PUBLISHED

Completed

Start:

01 Dec 2023

Due:

19 Jan 2024

Completion:

19 Jan 2024

CONSULTATION ISSUED

Completed

Start:

19 Jan 2024

Due:

19 Jan 2024

Completion:

19 Jan 2024

FINAL CHANGE REPORT PUBLISHED

Completed

Start:

19 Jan 2024

Due:

20 Feb 2024

Completion:

16 Feb 2024

RESPONSIBLE COMMITTEE DECISION

Completed

Start:

20 Feb 2024

Due:

28 Feb 2024

Completion:

28 Feb 2024
Impacted Consumers
Impacted REC Documents
Status
Implementation Date
Status Superseded
EMAR Version 3.11.0_Superseded
Included changes Affected REC Items
R0043 Commissioning of Works by the Crowded Meter Room Coordinator (CMRC) to Resolve Issues In Crowded Meter Rooms
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 12 - Data Access
  • Data Access Matrix (Electricity)
  • Data Item Catalogue
  • Market Message Catalogue
R0158 Amendment to the ‘Supplier Registration Report (MAP)’ report methodology
R0160 Electricity Supply to Hydrogen Electrolysers
  • Schedule 1 - Interpretations and Definitions
R0064 Creating a Meter Operator Agent and MOCoP Installer
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 9 - Qualification and Maintenance
R0070 Provision of Enduring Test Environments
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
  • Schedule 26 - Switching Service Management
  • Schedule 25 - Central Switching Service

Documents

Name Version Last updated Actions
159.49 KB
Version 1.0 - 16 Nov 2026 PDF - 159.49 KB
1.0 16 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
Lydia Bentley
Solution Development
Proposed solution summary
  1. As a Consumer taking part in the H100 trial, I want to be charged based on the amount of gas I consume, such that I am not charged more than I would have been, had I consumed the equivalent energy from natural gas.
  2. As a Gas Supplier, I want to ensure H100 trial Consumers, are not charged more than they would have been, had they consumed the equivalent energy from natural gas. 2- As a Gas Transporter, I want to accurately know how much hydrogen gas is being offtaken, so that I can support Suppliers. 3- As the Central Data Service Provider (CDSP), I want Market Messages relating to meter asset information to be accurate, so that I am better able to support dependant REC Parties. 4- As a Meter Equipment Manager (MEM), I want my metering assets compatible with the H100 trial to be underpinned by accurate Market Messages, so that I able to manage these meters correctly.
Proposed Solution Document
Document title
R0142 Solution - DI40145 - A0120 - Multiplication Factor Change v2.0
Upload document
R0142 Solution-DI40145-A0120-Multiplication Factor Change v2.0.pdf
Archive
Off
Document title
R0142 Solution-DI40145-A0120-Multiplication Factor Change v2.1
Upload document
R0142 Solution-DI40145-A0120-Multiplication Factor Change v2.1.pdf
Archive
Off
Problem Statement
In order for the H100 gas trial to be successful, a billable value for hydrogen gas needs to be accurately calculated from supplied physical volumes. To do this, relevant Data Items (relating to the calculation of billable gas volumes) within the Data Specification need to be updated to allow a new value for the multiplication factor. This change seeks to introduce a new enumeration value for the multiplication factor needed to facilitate the addition of this new value.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
SME Role
Lead Assurance Analyst
DI40145 Multiplication Factor - 23.06.2023
R0142 - Change Proposal Form.pdf
R0142 - Change Proposal Form
R0142 Change Proposal Plan v1.0 (Approved) - 05.12.2023
R0142 Initial Assessment Report v1.0 (Approved) - 05.12.23
R0142 Consolidated Impact Assessment Responses V1.0 16.01.24
R0142 Preliminary Change Report (Published for Consultation) V1.0 19.01.24
R0142 Consolidated Consultation Responses v1.0 16.02.24
R0142 Final Change Report (Post-Vote) v1.0 - 28.02.24
Company Name
Xoserve
Review status
Review required

Alignment of Market Message D0225 ‘consent to share flag’ to support PSR data sharing

Date of latest update
Type
Change
ID
R0139
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
This change was implemented on the 12th April 2024.
Summary
Ofgem have been in with discussion with Energy Suppliers this year, requesting them to voluntarily change how they use the consent option within the Priority Services Register (PSR) flow. This Change Proposal (CP) has been raised to make sure the Market Message mirrors the process agreed between Ofgem and Energy Suppliers by re-naming the Priority Services Register (PSR) Data Item DI51497 (J2208) as “Lawful basis for sharing” and to amend the relevant clauses in REC Schedule 13 if needed.
Proposer
Katie Stanyard
Change Plan

Party Impact Assessment

Completed

Start:

11 Aug 2023

Due:

05 Jan 2024

Completion:

05 Jan 2024

Preliminary Change Report Issued

Completed

Start:

05 Jan 2024

Due:

26 Jan 2024

Completion:

26 Jan 2024

Consultation

Completed

Start:

26 Jan 2024

Due:

09 Feb 2024

Completion:

09 Feb 2024

Final Change Report Issued

Completed

Start:

09 Feb 2024

Due:

16 Feb 2024

Completion:

16 Feb 2024

Responsible Committee Decision

Not Started

Start:

16 Feb 2024

Due:

28 Feb 2024

Completion:

Appeal Window Closure

Not Started

Start:

28 Feb 2024

Due:

13 Mar 2024

Completion:

Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.10.0_Superseded
Included changes Affected REC Items
R0062 Removal of ERDA meteringPointEnergyFlow change restriction
  • Schedule 27 - RMP Lifecycle
R0063 Addition of key information to all Service Now tickets
R0093 Uplift to CSS Maximum Demand Volumes during MHHS Migration Period
  • Schedule 1 - Interpretations and Definitions

Documents

Name Version Last updated Actions
172.63 KB
Version 1.0 - 16 Nov 2026 PDF - 172.63 KB
1.0 16 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
holly.law
Solution Development
Proposed Solution Document
Document title
Redlining - DI51497 - J2208 - Consent to share data obtained
Upload document
D0139 redlining - DI51497 - J2208 - Consent to share data obtained v0.2 (1).pdf
Archive
Off
Problem Statement
The current PSR Data Item DI51497(J2208) ‘Consent to share data obtained’ does not mirror the legal basis for sharing data that DNOs rely on, or the process that Suppliers have planned to have in place by early 2024.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0139 - Change Proposal Form
Consolidated Impact Assessment Responses
Consolidated Consultation Responses R0139
R0139 Change Proposal Plan v1.0 Approved
R0139 Initial Assessment Report v1.1 Approved
R0139 - Extension to Change Plan v1.0
R0139 Preliminary Change Report v1.0
R0139 Final Change Report v1.0 approved
ICO letter to Ofgem
R0139 redlining - DI51497 - J2208 - Consent to share data obtained
Company Name
Energy Networks Association
Review status
Review required

Add DESNZ to Schedule 12

Date of latest update
Type
Change
ID
R0135
Change Category
Change Path
Priority
Urgent
No
Latest Update
22/03/2024 - Withdrawn.
Summary
Empty
Proposer
Elise Handy
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Stages Selection
R0135 - Change Proposal Form
Company Name
BEIS (Department for Business, Energy and Industrial Strategy)
Review status
Review required