Missing Scenario Variants in D0179

Date of latest update
Type
Change
ID
R0235
Change Category
Change Path
Priority
Urgent
No
Latest Update
01/07/2025 - On 01 July 2025, the REC Change Panel voted to reject R0235 and approve R0235A, in line with the Code Manager's recommendation. The appeal window has closed.
Summary
Within MHHS SIT there is a scenario where the LDSO generates a D0139 to the MS for a PPM but the requirement is for the MS to generate a D0179. There is a gap in the D0179 data required and that provided on the D0139. 21.5.1 & 21.5.6 under Schedule 14 states that where the DNO changes the energisation status, within 3 WD of changing the energisation status the DNO will send the D0139 or the D0179(21.5.6) to the MS and then the MS will generate the D0179 to the Supplier(21.5.6). Currently, the LDSO only generates the D0179 to the Supplier but not to the MOP and the only change under MHHS is to add the new variant MSS.
Proposer
Patricia Parker
Change Plan

Change Report (Proposal Plan) approved by Change Panel

Completed

Start:

Due:

Completion:

04 Mar 2025

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

06 Mar 2025

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

01 May 2025

Presented at REC Change Panel

Completed

Start:

Due:

Completion:

20 May 2025
Impacted Consumers
Impacted REC Documents
Status
Implementation Date
Status Superseded
EMAR Version 4.2.0_Superseded
Included changes Affected REC Items
R0179 Proposal for Limiting Queries in EES API Calls (Single Query per API Call)
R0190 Related Meter Point RMP status rules
  • Schedule 28 - Related Metering Points
R0198 Metering Asset Manager (MAM) Communication Method Register
R0242 Missing Scenario Variant from R0043
  • Market Message Catalogue
R0244 C21 to be introduced into STIRG Document
  • Data Item Catalogue
R0235A Missing Scenario Variants in D0179 Alternate Solution
R0256 MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101
  • Market Message Catalogue
R0270 Clarification of SIP Qualification Requirements
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 15 - Metering Accreditation
R0271 Clarification of ASP, AMI, and EMO Accession Requirements
  • Schedule 15 - Metering Accreditation
  • Schedule 1 - Interpretations and Definitions
R0272 Enabling transparency of the CRS Provider’s REC service level performance
  • Schedule 1 - Interpretations and Definitions
  • Schedule 6 - Performance Assurance
  • Schedule 26 - Switching Service Management
  • Schedule 24 - Switching Data Management
R0277 Data Latency SLA Alignment for Gas Enquiry Service
  • Schedule 1 - Interpretations and Definitions
R0280 CSS Certificate Authority audit clarification
  • Schedule 1 - Interpretations and Definitions
R0283 Annual Address Management Plan Updates
  • Schedule 1 - Interpretations and Definitions
  • Schedule 6 - Performance Assurance
  • Schedule 29 - Address Management
R0287 Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0293 Housekeeping February 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0235 D0179 Missing Scenario Variants
Upload document
I0235 D0179 Missing Scenario Variants.pdf
Archive
Off
Document title
R0235 Data Specification V0.2
Upload document
I0235 D0179 Missing Scenario Variants V0.2.pdf
Archive
Off
Problem Statement
DNOs and MOAs cannot fulfil their full obligations listed in Schedule 14 Metering Operations as there missing Scenario Variants in the Data Specification preventing them from sending the D0179 to all required Parties.
Stages Selection
I0235 Change Proposal Form
I0235 Change Report (Proposal Plan) V1.0 Approved 04.03.25
I0235 Consolidated Impact Assessment Responses V1.0
R0235 and R0235A Change Report (For Consultation) V1.1
R0235 and R0235A Consolidated Consultation Responses PUBLIC V1.0
R0235 and R0235A Change Report (Final Recommendation) V2.0 (Approved) 01.07.2025
Company Name
ESG Global
Review status
Review required

Non-Domestic Change of Occupier SDEP Screens (R0155 Solution)

Date of latest update
Type
Change
ID
R0232
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
This Issue has been raised to develop the dedicated Non-Domestic Change of Occupier SDEP screens that were not possible as part of R0155 – Change of Occupier: Evidentiary Standards and Timescales. Should this Issue progress with a developed solution, the new dedicated Non-Domestic Change of Occupier screens would replace the temporary work around provided as a temporary workaround in the R0155 solution.
Proposer
lorna.mallon_sYHth
Status
Implementation Date
Status Superseded
EMAR Version 4.1.0_Superseded
Included changes Affected REC Items
R0152 Revision to the Consolidated Metering Code of Practice (CoMCoP)
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0157 Removal of Facsimile as a Method of Code Communication
  • Schedule 14 - Metering Operations
  • Schedule 18 - Green Deal Arrangements
  • Standards Definition Document
  • Data Item Catalogue
R0191 Introduction of SLA for Supplier De-Registration on Disconnected Meters
  • Schedule 27 - RMP Lifecycle
R0205 Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches
R0212 Protecting Crimestoppers and their Contacts
R0215 Schedule 30 Switch Meter Reading Problems - Rejections and Timings
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
R0060 ERDS Service Definition timezone correction
  • Schedule 1 - Interpretations and Definitions
R0232 Non-Domestic Change of Occupier SDEP Screens (R0155 Solution)
R0243 Transfer of Standard Settlement Configuration and Time Pattern Regime Data Item Ownership
  • Data Item Catalogue
R0248 REC Changes to tie in with DCP451 - Suspending Registrations
  • Schedule 24 - Switching Data Management
R0254 Non-Domestic Change of Occupier Reporting (R0155 Solution)
R0255 Terms of Reference Updates
R0257 Change to REC for Data processing outside of EEA
R0263 Sharing Confirmed Energy Theft Data with the BSCCo
  • Schedule 7 - Energy Theft Reduction
R0269 Schedule 5 – Change Management: Clarity and Typographical Review
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0279 Housekeeping November 2025
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 7 - Energy Theft Reduction
  • Schedule 27 - RMP Lifecycle
  • Schedule 18 - Green Deal Arrangements
  • Schedule 24 - Switching Data Management
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Market Message Catalogue
R0227 Domestic Elective HH Switching
  • Schedule 23 - Registration Services
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed solution summary
  1. The solution will be developed through the Change Issues Group. Attendees will be invited to discuss and determine the requirements for the dedicated Non-Domestic Change of Occupier SDEP screens (a separate screen will be required for both Gas and Electricity). The solution will also require reporting for Performance Assurance and will include a plan for queries raised at cut over and data retention obligations. To help drive those discussions a starting point could be as follows: • Meter Point X Number (MPxN) • Multi MPxN flag – i.e. are there more than one • Date of CoO • Number of attachments • Accept evidence - Y / N – only available to the receiving supplier • Additional info – must be populated if N Auto populate: • Date of creation, date of response. • The Service Level Agreement (SLA) is 10 Working Days so it will need the RAG status based on that. Escalations screens – as per the standard REC escalations – including MPxN, date of creation and number of attachments. As part of any solution, the Code Manager will also update the non-mandatory Non-Domestic Change of Occupier Guidance Document to include further details on the newly dedicated SDEP screens, as well as further training material for Energy Suppliers.
Problem Statement
Due to the MHHS Code Freeze, newly dedicated Non-Domestic Change of Occupier SDEP screens could not be implemented as part of the R0155 solution and instead the use of re-purposed, existing screens was proposed as a temporary workaround. Energy Suppliers were clear in their responses to the R0155 impact assessment and consultation that using a temporary work around (with the temporary solution being the use of existing screens PT0056 and PT0067) would create additional workload and risk and that newly dedicated SDEP screens for Non-Domestic Change of Occupiers would still be required.
SME
SME Role
Lead Technical Analyst
Workgroup
Workgroup(s)
I0232 - Non-Domestic Change of Occupier SDEP Screens (R0155 Solution) - Issue form
I0232 - Non-Domestic Change of Occupier SDEP Screens (R0155 Solution) - Change Report (Proposal Plan) V2.0 (17.06.2025)
I0232 - Non-Domestic Change of Occupier SDEP Screens (R0155 Solution) - Change Report (Impact Assessment) 13.03.2025
R0232 - Non-Domestic Change of Occupier SDEP Screens (R0155 Solution) - Change Report (For Consultation) 05.08.2025
I0232 - Consolidated Impact Assessment Responses (Non-Confidential) 08.04.2025
R0232 - Non-Confidential Consolidated Consultation Responses (02.09.2025)
R0232 - Change Report (Final Recommendation) V2.0 (Approved) 16.09.2025
SDEP User Training Deck v2.0
I0232 - Extension to Plan V1.0 (06.06.2025) Approved
Company Name
REC Code Manager
Review status
Review required

Shared Sites in Electricity Enquiry Service (EES)

Date of latest update
Type
Issue
ID
I0231
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/03/2026 The Proposer has withdrawn this Issue following discussions with industry, where impacted Parties advised waiting for the completion of MHHS migration before progressing this Issue and solution development. The window to adopt this Issue has now closed.
Summary
There is a concern regarding shared sites (as defined by BSCP550) that have multiple suppliers linked to them. The investigation revealed a lack of visibility of these sites, and it appears that the industry is similarly uninformed. Elexon, the REC, and the wider industry do not have a consistent way of identifying these shared sites. Therefore, there is a good chance that agents are holding shared sites within their portfolio without knowing it. We would like to explore whether the EES Online Portal has any flags or mechanisms that could help identify these shared sites.
Proposer
Ardin Klimenti
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. A flag on EES that can help everyone clearly identify the shared site, the primary MPAN and all of the pseudo MPANs attached to it.
Problem Statement
There is a concern regarding shared sites (as defined by BSCP550) that have multiple suppliers linked to them. The investigation revealed a lack of visibility of these sites, and it appears that the industry is similarly uninformed. Elexon, the REC, and the wider industry do not have a consistent way of identifying these shared sites. Therefore, there is a good chance that agents are holding shared sites within their portfolio without knowing it. We would like to explore whether the EES Online Portal has any flags or mechanisms that could help identify these shared sites. If not, could these be added?
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Issue Proposal Form
Company Name
Elexon
Review status
Review required

D0303 flow following MHHS design changes

Date of latest update
Type
Issue
ID
I0230
Change Path
Priority
Urgent
No
Latest Update
29/04/2026 - This Issue has been withdrawn by the Proposer, as there was not a strong preference amongst MAPs of which temporary solution option (if any) should be progressed. Many MAPs already have workarounds in place, and a permanent solution is expected to be progressed in the future through a joint REC / BSC change. The adoption window has closed.
Summary
As part of Market Wide Half Hourly Settlement (MHHS) design, the requirement to provide Data Item Effective from Settlement Date {REGI} (J0049 / DI50025) in the Notification of Meter Operator, Supplier and Metering Assets installed / removed by the MOP to the MAP Market Message (D0303 / MM00240) has been changed from mandatory to optional. This means Meter Asset Providers (MAP) may not receive it.
Proposer
Beth Tatton
Change Plan

Change Report (Proposal Plan) approved at Change Panel

Completed

Start:

Due:

Completion:

04 Nov 2025
Impacted REC Services
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Problem Statement
The Effective from Settlement Date {REGI} Data Item being optional rather than mandatory inside the Notification of Meter Operator, Supplier and Metering Assets installed / removed by the MOP to the MAP Market Message means that MAPs may not receive this information required for billing purposes.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
Issue Proposal Form
I0230 Change Report (Proposal Plan) V1.0 approved 04.11.25
I0230 and I0261 Solution Development Report V1.0
I0230 I0261 Q&A session V1.0
I0230 and I0261 Consolidated IR Responses PUBLIC V1.0
Company Name
Calisen Asset Management Limited
Review status
Review required

Supply Point Enquiry API Technical Specification Updates

Date of latest update
Type
Change
ID
R0229
Change Category
Change Path
Priority
Urgent
No
Latest Update
10/02/2025 - Change withdrawn and will be progressed as a Housekeeping change under R0239 Housekeeping Feb 2025. The adoption window has now closed.
Summary
The content detailed in Section 4.2 Responses is incorrect. We would like to amend the responses included in this section so that users are able to access the correct technical specifications for the service that they are consuming.
Proposer
Molly Haley
Change Plan

Change discussed at Change Panel

Completed

Start:

Due:

Completion:

21 Jan 2025
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
The example responses detailed in section 4.2 are broken down as ‘mprn’ with three demoed data items; ‘mprn’, ‘installation name’, and ‘network name.’ this is however not reflective of the correct responses that would actually be returned on an API call. The actual structure is ‘supplier’ with the demoted data items actually being ‘amr_indicator’, ‘amr-sp’, and ‘csep_id.’ Fundamentally, this would mean that users are consuming incorrect information when looking to this document for guidance. This could potentially be causing negative impacts when the document is relied upon, especially for newer users seeking guidance.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
API GES Supply Point Enquiry Technical Specification v2.0.pdf
Change Proposal Form
Company Name
Xoserve
Review status
Review required

ECOES API for Export MPAN Creation at Scale

Date of latest update
Type
Issue
ID
I0228
Change Category
Change Path
Priority
Urgent
No
Latest Update
05/11/2026 - the Proposer has elected to withdraw this Issue as the business case has been covered by R0321, which has been approved by Change Panel for implementation. If you wish to adopt this Issue, please contact the Code Manager by COB 20 November 2026.
Summary
Electricity Suppliers believe there is a significant bottleneck to Export Metering Point creation, which is resulting in them feeling unable to offer Export smart products to a wider audience of Consumer and scale low-carbon technology. The most effective solution is an API within the Electricity Enquiry Service (EES) that allows the Electricity Supplier to request the creation of an Export Metering Point. This could work for both Electricity Suppliers and Distribution Network Operators (DNOs) ensuring that scalable solutions are applied at both sides of the process.
Proposer
Ben Atkinson
Change Plan

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

06 Mar 2025

Presented at REC Change Panel

Completed

Start:

Due:

Completion:

21 Apr 2026
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Problem Statement
A restriction of 50 Export Metering Points per DNO per day, with no two DNOs operating the bulk request process in the same way, is overly burdensome to Electricity Suppliers and creating a barrier for Consumers getting an Export Metering Point assigned to their Premise. This is ultimately harming the effort the reach Net Zero.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Issue Proposal Form
Change Issues Group paper - presented March 2025
I0228 Change Report (Proposal Plan) V1.0 approved 21.04.26
I0228 Consolidated Information Request Responses V1.0 PUBLIC
I0228 Update to Plan V1.0 on hold, approved 04.06.26
Company Name
Octopus Energy
Review status
Review required

Domestic Elective HH Switching

Date of latest update
Type
Change
ID
R0227
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
This change aims to remove unnecessary blocks to Consumer Switching, where a Domestic Consumer is registered as elective Half Hourly (HH) with the Losing Supplier, but the Gaining Supplier does not offer this.
Proposer
Angela Joyce
Change Plan

Proposal plan approved at Change Panel

Completed

Start:

Due:

Completion:

04 Feb 2025

Extension to Plan approved by Change Panel

Completed

Start:

Due:

Completion:

15 Apr 2025

Change Report (Final Recommendation) approved by Change Panel

Completed

Start:

Due:

Completion:

17 Jun 2025
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 4.1.0_Superseded
Included changes Affected REC Items
R0152 Revision to the Consolidated Metering Code of Practice (CoMCoP)
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0157 Removal of Facsimile as a Method of Code Communication
  • Schedule 14 - Metering Operations
  • Schedule 18 - Green Deal Arrangements
  • Standards Definition Document
  • Data Item Catalogue
R0191 Introduction of SLA for Supplier De-Registration on Disconnected Meters
  • Schedule 27 - RMP Lifecycle
R0205 Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches
R0212 Protecting Crimestoppers and their Contacts
R0215 Schedule 30 Switch Meter Reading Problems - Rejections and Timings
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
R0060 ERDS Service Definition timezone correction
  • Schedule 1 - Interpretations and Definitions
R0232 Non-Domestic Change of Occupier SDEP Screens (R0155 Solution)
R0243 Transfer of Standard Settlement Configuration and Time Pattern Regime Data Item Ownership
  • Data Item Catalogue
R0248 REC Changes to tie in with DCP451 - Suspending Registrations
  • Schedule 24 - Switching Data Management
R0254 Non-Domestic Change of Occupier Reporting (R0155 Solution)
R0255 Terms of Reference Updates
R0257 Change to REC for Data processing outside of EEA
R0263 Sharing Confirmed Energy Theft Data with the BSCCo
  • Schedule 7 - Energy Theft Reduction
R0269 Schedule 5 – Change Management: Clarity and Typographical Review
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0279 Housekeeping November 2025
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 7 - Energy Theft Reduction
  • Schedule 27 - RMP Lifecycle
  • Schedule 18 - Green Deal Arrangements
  • Schedule 24 - Switching Data Management
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Market Message Catalogue
R0227 Domestic Elective HH Switching
  • Schedule 23 - Registration Services
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0227 - Proposed Legal Text (IA) - Schedule 23 - Registration Services.doc
Upload document
I0227 - Schedule 23 Registration Services - Paragraph 11 Mark up - 28 February 2025(114145004).docx
Archive
Off
Document title
I0227 Schedule 23 pre MHHS version
Upload document
I0227 Schedule 23 pre MHHS version.pdf
Archive
Off
Document title
I0227 Schedule 23 post MHHS version
Upload document
I0227 Schedule 23 post MHHS version.pdf
Archive
Off
Problem Statement
There are issues when a Domestic Consumer intends to Switch Suppliers, but their MPAN is registered as elective HH with their current Supplier, and this is not offered by the Gaining Supplier. This can cause delays with Switching for Consumers.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Issues Proposal Form - Attachment 1. Electralink Post.docx
Issue Proposal form
I0227 - Change Report (Proposal Plan - Approved) v1.0 04.02.2025
I0227 - Consolidated Party Impact Assessment Responses (Non-Confidential) 11.04.2025
I0227 Extension to Plan V1.0 Approved 15.04.2025
R0227 Change Report (For Consultation) V1.0
R0227 Consolidated Consultation Responses v1.0
R0227 Change Report (Final Recommendation) V1.0 Approved 17.06.25
Company Name
octopus energy
Review status
Review required

Clarification on TDIS portfolio transfers on sale

Date of latest update
Type
Change
ID
R0225
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the REC Release on 27 June 2025.
Summary
The current wording of the Energy Theft Reduction Schedule has wording on the transfer of theft targets on portfolio sale, however which sales would qualify is ambiguous.
Proposer
Anton Moden
Change Plan

Change Plan at Change Panel

Clarification on TDIS portfolio transfers on sale > Change Plan

Start:

27 Nov 2024

Due:

21 Jan 2025

Completion:

21 Jan 2025

Change Report (Consultation) to Change Panel

In Progress

Start:

21 Jan 2025

Due:

04 Feb 2025

Completion:

Impacted REC Documents
Status
Implementation Date
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
florentina.monea
Solution Development
Proposed Solution Document
Document title
R0225 - Legal Drafting
Upload document
I0225 - Legal Drafting (3).docx
Archive
Off
Document title
Schedule 7 Energy Theft Reduction (based on v3.0) Legal Drafting
Upload document
Schedule 7 Energy Theft Reduction (based on v3.0) Legal Drafting.doc
Archive
Off
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
Change/ Issue form
I0225 - Change Report - Proposal Plan (Approved 21/01/2025)
R0225 Change Report (Consultation)
R0225 Consolidated Consultation Responses
R0225 Change Report (Final) Post-vote
Company Name
REC Code Manager
Review status
Review required

Agile Reporting within CSS

Date of latest update
Type
Change
ID
R0224
Change Path
Priority
Urgent
No
Latest Update
23/09/2026 - An update to plan has been published for consideration at the Technical Expert Panel on 30 September 26.
Summary
As part of the impact assessment process for R0115, it was identified that it is very costly and time consuming to make reporting changes within the CSS architecture. As such, we would like to explore enabling agile reporting within the CSS ecosystem, by creating a functionality that consolidates all necessary data into a single, centralised database.
Proposer
Maxime Eyseren
Change report - Final Change Report
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
holly.law
Solution Development
Problem Statement
Current CSS arrangements mean that REC Changes designed to facilitate access to CSS data are more onerous that they need to be. Current arrangements are costly and have relatively long lead-times. This Issue seeks to explore changing the way that the CSS data can be accessed.
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Proposal Form - Agile reporting within CSS
I0224 Change Report (Plan) (Approved) V1.0 21.01.25
Change Proposal Re-Plan Approved
Solution/Business Case report
R0224 update to plan 18.03.26
R0224 update to plan 19 May 2026
R0224 Update to plan September 2026
Company Name
REC Technical Services
Review status
Review required

Reconciliation of Unallocatable Transactions Review

Date of latest update
Type
Change
ID
R0223
Change Category
Change Path
Priority
Urgent
No
Latest Update
22/09/25 - This Change Proposal has been implemented as part of the MHHS M8 22 September 2025 REC Release.
Summary
The process for Reconciliation of Unallocatable Transactions is set out in Section 10 of Schedule 11. During the most recent reconciliation delivery (the gas process from July 2024) several areas of improvement were identified, critically a lack of clarity regarding historic Supplier Licences and how to include or exclude them from the calculations. The Code Manager believes that this lack of clarity and past precedent would lead to material impact on one or more Party.
Proposer
helen.fosberry_e0pk4
Change Plan

Findings from Information Request were presented at Change Issues Group

Completed

Start:

Due:

Completion:

06 Feb 2025
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 4.0.0_Superseded
Included changes Affected REC Items
R0044 MHHS Programme Changes required to Central Switching Service
  • Schedule 1 - Interpretations and Definitions
  • Schedule 27 - RMP Lifecycle
R0173 Improvements to the Theft Detection Incentive Scheme (TDIS)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 7 - Energy Theft Reduction
R0209 Implementation of Market-wide Half Hourly Settlement (MHHS) Arrangements
  • Schedule 15 - Metering Accreditation
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 19 - Market Exit and Supplier of Last Resort
  • Schedule 27 - RMP Lifecycle
  • Schedule 28 - Related Metering Points
  • Schedule 29 - Address Management
  • Schedule 9 - Qualification and Maintenance
  • Schedule 12 - Data Access
  • Schedule 24 - Switching Data Management
  • Schedule 23 - Registration Services
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Standards Definition Document
  • Data Item Catalogue
  • Market Message Catalogue
R0222 ESME ID Update Rejections
R0223 Reconciliation of Unallocatable Transactions Review
  • Schedule 11 - Prepayment Arrangements
R0241 MHHS Incremental Changes for go live
  • Schedule 15 - Metering Accreditation
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 19 - Market Exit and Supplier of Last Resort
  • Schedule 27 - RMP Lifecycle
  • Schedule 28 - Related Metering Points
  • Schedule 29 - Address Management
  • Schedule 9 - Qualification and Maintenance
  • Schedule 24 - Switching Data Management
  • Schedule 23 - Registration Services
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Standards Definition Document
  • Data Item Catalogue
  • Market Message Catalogue
R0259 Update to R0173 Implementation Date
R0264 Data Specification Housekeeping
R0083 Changes to Supply Number Format for MHHS
R0097 Consequential Change for CSS Smart Meter Data Retriever Appointments
  • Data Item Catalogue
  • Market Message Catalogue
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed solution summary
  1. A review of the process with specific regard to: - Clarity within the process regarding historic Supplier Licences - Alignment between fuels - Re-introducing an independent audit.
Proposed Solution Document
Document title
Schedule 11 - Prepayment Arrangements (I0223 - Party Impact Assessment) 05.06.2025
Upload document
Schedule 11 - Prepayment Arrangements (I0223 - Party Impact Assessment) 05.06.docx
Archive
Off
Document title
Extract - Schedule 11 - Prepayment Arrangements (I0223 - Party Impact Assessment) 05.06.2025
Upload document
Extract - Schedule 11 - Prepayment Arrangements (I0223 - Party Impact Assessment) 05.06.docx
Archive
Off
Document title
Schedule 11 - Prepayment Arrangements (R0223 - Consultation) 24.07.2025
Upload document
Schedule 11 - Prepayment Arrangements (R0223 - Consultation).docx
Archive
Off
Document title
Extract - Schedule 11 - Prepayment Arrangements (R0223 - Consultation) 24.07.2025
Upload document
Extract - Schedule 11 - Prepayment Arrangements (R0223 - Consultation).docx
Archive
Off
Document title
Schedule 11 - Prepayment Arrangements (R0223 - Final Recommendation) 18.08.2025
Upload document
Schedule 11 - Prepayment Arrangements (R0223 - Final Recommendation) 18.08.2025.pdf
Archive
Off
Document title
Extract - Schedule 11 - Prepayment Arrangements (R0223 - Final Recommendation) 18.08.2025
Upload document
Extract - Schedule 11 - Prepayment Arrangements (R0223 - Final Recommendation) 18.08.2025.pdf
Archive
Off
Problem Statement
During the most recent reconciliation delivery (the gas process from July 2024) several areas of improvement were identified, critically a lack of clarity regarding historic Supplier Licences and how to include or exclude them from the calculations.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0223 - Submission Form
I0223 - Information Request Responses
I0223 - Change Report (Proposal Plan) V2.0 (Approved) 20.05.2025
I0223 - Proposal Plan Update V1.0 (Approved) 20.05.2025
I0223 - Change Report (Impact Assessment) V1.0 (06.06.2025)
I0223 - Party Impact Assessment Consolidated Responses V1.0 (11.07.2025)
R0223 - Change Report (For Consultation) V1.0 (24.07.2025)
R0223 - Change Report (Final Recommendation) V2.0 (Approved) 02.09.2025
Company Name
Code Manager
Review status
Review required