MSC Scheme Non-Domestic Exclusions – Process Clarification
Date of latest update
Type
Issue
ID
I0349
Urgent
No
Latest Update
15/10/2026 REC Issue accepted in by the Code Manager.
Summary
The MSC Scheme applies only to domestic Switches; however, identifying eligible Switches currently relies on the Domestic Premises Indicator (DPI), which may not be applied consistently or reliably. This can result in unnecessary processing where an Energy Supplier, or an entire MPID/SSC within its portfolio, supplies only non-domestic Consumers.
Status
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
Stages Selection
I0349 Submission Form
Company Name
RECCo
Review status
Review required
REC Changes for the Gas Enquiry Service Evolution
Date of latest update
Type
Issue
ID
I0346
Priority
Urgent
No
Latest Update
03/09/2026 - Issue accepted in by Code Manager
Summary
"As part of the evolution of the Gas Enquiry Service (GES), the service is intended to transition to a new Service Provider with an updated service provided for both the API and Portal. To recognise the new service, a number of changes may be required to REC documentation. These changes will need to be discussed with industry and approved via the REC change process prior to implementation of the new service."
Status
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
Stages Selection
I0346 submission form
Company Name
RECCo
Review status
Review required
Explore use of CHECK as a Meter Type option on J0483 DI-059
Date of latest update
Type
Issue
ID
I0344
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
Change Report (Proposal Plan) has been published for REC Change Panel approval on 17 November 2026.
Summary
It has been suggested that CHECK meters should not be sent within industry messages so the presence of this value within the valid set may not be required. This Issue has been raised to explore whether this assumption is correct, look at the existing/historic use cases industry have used the CHECK option for, if they are no longer valid and if so why not.
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
Solution Development
Problem Statement
The DI-059 / J0483 Meter Type Data Item is shared between the Balancing and Settlement Code’s Data Integration Platform (DIP) and the REC’s Data Catalogue. The CHECK Meter Type does not have a valid MHHS Market Segment combination and is not a valid enumeration under the DIP version of DI-059 / J0483. Having an enumeration that is valid in one version of the Data Item and not valid in another causes confusion as to what enumerations are valid for this Data Item. As part of this Issue, we will also explore whether use of the LAG_, LEAD_, and MAIN_ meter types are still necessary to be kept within D-Flows, even though they are valid meter types for MHHS arrangements.
Stages Selection
Stages Selection
Workgroup
Workgroup(s)
I0344 submission form
Change Report - Proposal Plan
Company Name
-
Review status
Review required
Improved Validation for DI51599 - Electricity Smart Meter Equipment (ESME ID)
Date of latest update
Type
Issue
ID
I0341
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
18/11/2026 - The Change Report (Proposal Plan) was approved by the REC Change Panel
Summary
A DNO has raised an issue with the ESME ID data stored in MPRS. Some of the ESMEs are passing MPRS basic validation but are being rejected by the proposed Metering Service preventing a change of service.
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
Solution Development
Problem Statement
A DNO has raised an issue with the ESME ID data stored in MPRS. Some of the ESMEs are passing MPRS basic validation but are being rejected by the proposed Metering Service preventing a change of service (Rejection of IF-033 with IF-035 Response R). Basic REC R032 Validation on IF-005/D0312: XX-XX-XX-XX-XX-XX-XX-XX (0-9, A-Z)
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Workgroup
Workgroup(s)
I0341 submission form
Change Report - Proposal Plan
Company Name
-
Review status
Review required
REC Change to align with CP1633 Capture Modem Module Details Under BSCP601
Date of latest update
Type
Issue
ID
I0338
Change Category
Priority
Urgent
No
Latest Update
06/08/2026 - Issue accepted in by the Code Manager
Summary
BSC CP1633 “Capture Modem Module Details Under BSCP601” makes amendments to BSCP601 Metering Protocol Approval and Compliance Testing. One of the amendments places obligations on MOAs where they are introducing and amending Communications Equipment. Equivalent and potentially expanded obligations need to be placed within REC Schedule 14 Metering Operations to support this.
Status
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
Stages Selection
I0338 submission form
Company Name
REC Code Manager / CCSG representative
Review status
Review required
Change to Location (A0059) data item within the ONAGE APPT file to MAMs, from ‘Optional’ to ‘Mandatory’
Date of latest update
Type
Change
ID
R0337
Priority
Urgent
No
Latest Update
17/11/2026 - Change Report (Proposal Plan) approved by the REC Change Panel.
Summary
Currently, the location (A0059) data item within the ONAGE APPT file from Suppliers to MAMs is Optional, this allows a Supplier to leave this field blank. Currently SGNCS system functionality is designed to reject the file if this field is blank. This is due to SGNCS requiring to hold the location of the meter installation in order to allow us to deliver on our safety obligations as a MAM in maintaining of an asset.
Impacted REC Documents
Status
Status
Implementation Status
Date Raised
Fuel
Solution Development
Proposed Solution Document
Document title
I0337 legal text changes
Upload document
I0337 proposed solution.pdf
Archive
Off
Problem Statement
ONAGE files are Market Messages sent from Gas Suppliers to Gas Metering Asset Managers (MAMs) to appoint or de-appoint the MAM following a change of Energy Supplier or a change of MAM. The 'Location Code' (A0059) Data Item within ONAGE tells MAMs where a meter is located within the property (“01 = cellar”, “02 = under stairs”, etc). A0059 is currently an 'Optional' data item, which means that ONAGE entries are valid even where A0059 is blank. Although most Energy Suppliers send ONAGE files that always have A0059 populated, including when it is "00 = unknown", it is possible for ONAGE files to be sent with a blank ‘Location Code’. This Issue was raised by a MAM who has identified that this leads to rejections of the ONAGE appointment (APPT) files where the A0059 is left blank as this is a mandatory field in their internal systems. The location of the meter installation is also required for MAMs to deliver their safety and asset maintenance obligations.
Stages Selection
Stages Selection
Workgroup
Workgroup(s)
I0337 submission form
Company Name
-
Review status
Review required
Introduction of Defined Electricity Metering Work Categories for Metering Accreditation
Date of latest update
Type
Issue
ID
I0335
Change Category
Change Path
Priority
Urgent
No
Latest Update
03/11/2026 The Information Request has closed and the Consolidated Responses have been published.
Summary
Currently, there are no clearly defined or standardised categories of work for electricity third-party activities within CoMCoP. This lack of categorisation reduces transparency of company capabilities and scope of work, limits the ability to align accreditation with actual operational activity and restricts the ability to apply targeted, risk-based audit assurance.
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Stages Selection
Stages Selection
I0335 submission form.pdf
I0335 - Change Report (Proposal Plan) v1.0
I0335 - Change Report (Proposal Plan) v1.0 Approved 15.09.26
I0335 Consolidated IR Responses NON-CONFIDENTIAL v0.1.pdf
Company Name
Wilcock Consultants Ltd
Review status
Review required
A review of the Misdirected Payments and Debt Assignment Processes
Date of latest update
Type
Issue
ID
I0329
Change Category
Change Path
Priority
Urgent
No
Latest Update
04/08/2026 - On 04 August 2026, the REC Change Panel approved this Proposal Plan.
Summary
This Issue seeks to assess and identify any gaps, inconsistencies or process improvements opportunities for the Misdirected Payments and Debt Assignment processes.
Status
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0329 Submission Form
I0329 Change Report (Proposal Plan) V1.1 Approved
Company Name
REC Code Manager
Review status
Review required
Provision of Standard industrial Classification (SIC) Code to REC Parties
Date of latest update
Type
Issue
ID
I0327
Priority
Urgent
No
Latest Update
18/11/2026 - On 17 November 2026, the REC Change Panel approved the Change Report (Proposal Plan) for I0327 in line with the Code Manager's recommendation. The Information Request will close on 04 December 2026.
Summary
As part of the planning required to deliver Net Zero, Gas Distribution Networks (GDNs) are obligated to plan Industrial and Commercial (I&C) gas demand at a more granular, site-specific level. To meet this obligation, access to Standard Industrial Classification (SIC) Code data, matched to both Gas and Electricity Meter Point Reference Numbers, would provide a significantly improved understanding of I&C customers.
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Solution Development
Problem Statement
As part of the planning required to deliver Net Zero, Gas Distribution Networks (GDNs) are obligated to plan Industrial and Commercial (I&C) gas demand at a more granular, site-specific level. Ofgem, DESNZ and NESO increasingly require GDNs to present detailed information on the types of I&C activities operating within each Network footprint to support robust long-term whole-system planning. To meet this obligation, access to Standard Industrial Classification (SIC) Code data, matched to both Gas and Electricity Meter Point Reference Numbers, would provide a significantly improved understanding of I&C customers. This data would enable GDNs to:
- characterise current I&C gas demand more accurately,
- identify patterns and drivers of consumption across different industrial and commercial sectors, and
- engage more effectively with site operators to understand their ongoing and future energy needs.
By improving visibility of the industrial and commercial landscape across the network, GDNs would be able to plan current demand more effectively, better identify areas requiring continued investment, and support whole system partners such as DNOs where cross vector interactions may be relevant, ensuring planning decisions remain aligned with customers’ needs while supporting the broader Net Zero transition. This data would also improve targeted engagement with strategically significant I&C sites, allowing networks to better understand operation drivers, decarbonisation constraints and long-term energy requirements rather than that of current and historic consumption trends.
- characterise current I&C gas demand more accurately,
- identify patterns and drivers of consumption across different industrial and commercial sectors, and
- engage more effectively with site operators to understand their ongoing and future energy needs.
By improving visibility of the industrial and commercial landscape across the network, GDNs would be able to plan current demand more effectively, better identify areas requiring continued investment, and support whole system partners such as DNOs where cross vector interactions may be relevant, ensuring planning decisions remain aligned with customers’ needs while supporting the broader Net Zero transition. This data would also improve targeted engagement with strategically significant I&C sites, allowing networks to better understand operation drivers, decarbonisation constraints and long-term energy requirements rather than that of current and historic consumption trends.
Stages Selection
Stages Selection
Workgroup
Workgroup(s)
I0327 submission form
Change Report - Proposal Plan
I0327 Change Report (Proposal Plan) Approved 17.11.26
Company Name
-
Review status
Review required
Erroneous Switch Review: Assurance Reporting Update
Date of latest update
Type
Issue
ID
I0326
Change Path
Priority
Urgent
No
Latest Update
On 30 October 2026, the REC Change Panel voted to approve this Extension to Plan for I0326 via ex-committee decision.
Summary
There is gap in the Erroneous Switch (ES) Performance Assurance reporting as the DTN does not provide MPXN level data up front. It requires individual ES permission before MPXNs are provided. However, CSS reporting does provide monthly MPXN level report. As such end-to-end monitoring of the ES process cannot be carried out at a MPXN level.
Status
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Problem Statement
There is a lack of consistency in the level of data granularity provided for ES Performance Assurance reporting across industry systems. Specifically, the DTN provides only aggregated data unless explicit permission is obtained from individual Energy Suppliers for each MPxN, whereas the CSS routinely produces monthly reports at MPxN level. This misalignment restricts the ability to access comparable, detailed datasets across platforms and prevents effective end-to-end monitoring and assurance of the ES process at MPxN level.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0326 submission form
I0326 Change Report (Proposal Plan) (Approved) v1.1 07.07.26
I0326 Change Report (Update to Plan) Pre-Approval
I0326 Change Report (Update to Plan) v1.0 Approved 30.10.26
Company Name
RECCo
Review status
Review required