Post-MHHS Full Transition Complete (M15) REC updates
Date of latest update
Type
Change
ID
R0325
Change Category
Change Path
Priority
Urgent
No
Latest Update
29/09/2026 - A Change Report (Update to Plan) has been published for review at the Change Panel on 06 October 2026, any comments on this plan must be received by 23:59 05 October 2026.
Summary
The REC was updated, primarily through R0209 and R0241, to add requirements that support the transition to, and enduring operation of the MHHS arrangements. As part of the transition, each impacted Metering Point will be migrated using processes defined in Codes, including the REC. Once this migration activity is complete, the legacy and transitional arrangements will become redundant and should be removed from the REC to support its efficient operation
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
Retention of redundant obligations within the REC would make it more complex to navigate for Market Participants and could cause confusion on the obligations that are in effect to support the efficient operation of the Great British Energy retail market. It is also worth noting that until Ofgem formally closes the MHHS Significant Code Review (SCR), this REC Issue could potentially impact that SCR.
Stages Selection
Stages Selection
Workgroup
Workgroup(s)
I0325 submission form
I0325 Scope list
I0325 Schedules CHIG 03092026.zip
I0325 Schedules CHIG 01102026.zip
I0325 Schedule1 CHIG 05112026.pdf
I0325_Change Report (Update to Plan) v1.0
R0325 Legal drafting
Company Name
RECCO
Review status
Reviewed - Accepted
Introduction of Consumer Consent Service
Date of latest update
Type
Change
ID
R0318
Date of next activity
Change Category
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
18/11/2026 - The Issue was progressed to Change Proposal on 17 November 2026. Following industry consultation on the REC drafting a number of refinements to the CCS design and drafting are being made. On progression to Change Proposal and Modification, the title has been updated to Introduction of Consumer Consent Service (not Solution) to reflect the new service that will be introduced.
Summary
This initiative will support the transformation of how energy is managed and consumed by giving consumers control over their energy (gas, electricity, heat, or other) data, enabling innovation through third-party services, and advancing sustainability goals. This REC Issue is being raised to promote visibility and awareness of opportunities for engagement, in advance of the CCS Change Proposal being progressed.
Change Plan
Proposal Plan (Approved)
Completed
Start:
02 Apr 2026Due:
02 Apr 2026Completion:
02 Apr 2026Update to Plan (Approved)
Completed
Start:
30 Sep 2026Due:
30 Sep 2026Completion:
30 Sep 2026Definition
Completed
Start:
02 Apr 2026Due:
17 Nov 2026Completion:
17 Nov 2026Business Case Assessment
In Progress
Start:
18 Nov 2026Due:
18 Dec 2026Completion:
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
RECCo | Consumer Consent Programme page
Archive
Off
Document title
Consumer Consent Hub - REC Portal
Archive
Off
Document title
Consumer Consent Solution Design Consultation (March 2026)
Archive
Off
Document title
RECCo's response to the CCS Design Consultation - 28 May 2026
Archive
Off
Problem Statement
A new set of arrangements for a Consumer Consent Solution (CCS) is currently being developed under the RECCo CCS project. The new arrangements will need to be implemented within the REC so that they can be governed under the REC on an enduring basis.
Stages Selection
Stages Selection
Workgroup
Workgroup(s)
I0318 submission form
RECCHIG_26_0305 - I0318 Consumer Consent Solution
I0318 Change Proposal Re-Plan v2.0 APPROVED 30.09.2026.
I0318 Change Report (Proposal Plan) v1.0 APPROVED 02.04.2026
Company Name
Retail Energy Code Company Ltd
Review status
Review required
REC Portal Solution to R0224
Date of latest update
Type
Issue
ID
I0315
Priority
Urgent
No
Latest Update
18/02/2026 - accepted in by Code Manager
Summary
As part of R0224, the technical solution creates a CSS replica (read-only) database view that can be used by RECCo and the REC Code Manager to generate reports on demand for market participants. For users to be able to access this database and request generation of the appropriate reports, this change is seeking to develop that front end portal capability to manage user’s requests and allow for completed reports to be downloaded via the REC Portal.
Status
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
Stages Selection
I0315 submission form
Company Name
REC Code Manager
Review status
Review required
Crossed Meters Process: Clarifications and Support
Date of latest update
Type
Issue
ID
I0314
Change Category
Change Path
Priority
Urgent
No
Latest Update
On 30 October 2026, the REC Change Panel approved an Extension to Plan for I0314 via ex-committee.
Summary
This issue seeks to solve is the gap between the documented REC Crossed Meters process and how it is being applied operationally. The aim is to ensure all parties fully understand the process, apply it consistently, and have the support necessary to achieve timely, correct resolution of Crossed Meter cases.
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0314 submission form
I0314 Change Report (Proposal Plan) Approved 21.04.26
I0314 Extension to Plan V1.0 (Approved) 30.10.26
Company Name
REC Code Manager
Review status
Review required
Review of export meter work arrangements
Date of latest update
Type
Change
ID
R0312
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
12/11/2026 The Party impact assessment has now opened until 23:59 on 04/12/2026
Summary
The REC Metering Operations Schedule has limited distinction between the activities for import and export metering. These provisions were not specifically developed to support a market with high volumes of small-scale microgeneration with shared metering assets for import and export.
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
There is a lack of distinction within REC Schedule 14 – Metering Operations between activities for Import and Export Metering, and how to manage work arrangements where is a shared Metering Asset between Import and Export Suppliers.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Workgroup
Workgroup(s)
I0312 submission form
I0312 Change Report (Proposal Plan) v1.0 Approved 21.04.26
Change Report (Update to Plan) V1.0 Pre-Approval 10.11.26
R0312 Process Maps and Proposed Solution Requirements
Company Name
-
Review status
Review required
Categorisation of Gas Address Amendment SDEP Cases
Date of latest update
Type
Issue
ID
I0305
Priority
Urgent
No
Latest Update
20/01/2026 - Issue accepted in by Code Manager
Summary
The Market Message PT0055 is specifically used for SDEP cases related to Gas Crossed Meter queries. We have identified a large number of cases requesting resolutions relating to Gas Address Amendments that are being raised in PT0055.
Status
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
Stages Selection
I0305 submission form
Company Name
OVO Energy
Review status
Review required
Potential Consumer detriment for Smart Economy 7
Date of latest update
Type
Issue
ID
I0303
Urgent
No
Latest Update
09/04/2026 Following a review of responses to the joint information request on REC Issues I0273 - Sharing of SSC and TPR Information for MHHS Smart and Advanced Meters and I0303 - Potential Consumer detriment for Smart Economy 7, the Code Manager has determined that the scope of REC Issue I0303 can be considered as part of the solution development for REC Issue I0273. I0303 has now been classed as resolved and will not be progressed further as a separate Issue. For further engagement with this issue, please refer to I0273 directly.
Summary
There is a potential for Consumer detriment under the Market-wide Half Hourly Settlement arrangements where a customer unknowingly selects a tariff (i.e. single rate) where they have an Economy 7 type configuration on a Smart meter for water/storage heating.
Status
Implementation Status
Date Raised
Solution Development
Problem Statement
There is a potential for Consumer detriment under the Market-wide Half Hourly Settlement arrangements where a customer unknowingly selects a tariff (i.e. single rate) where they have an Economy 7 type configuration on a Smart meter for water/storage heating. A solution is required that enables a Supplier to identify a Smart E7 Consumer during the Switch process to ensure they can offer the correct tariff and prevent consumer detriment.
Stages Selection
Stages Selection
Workgroup
Workgroup(s)
I0303 submission form
Company Name
Centrica
Review status
Review required
Provision of data to the GES Provider
Date of latest update
Type
Issue
ID
I0302
Change Category
Change Path
Priority
Urgent
No
Latest Update
26/08/2026 On 26 August 2026, in line with the Code Manager's recommendation, TEP approved the extension to plan for I0302.
Summary
RECCo has commenced work on developing a dual-fuel Enquiry Service which will involve the migration of data from its legacy services.
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
Ahead of the introduction of a dual-fuel Enquiry Service and in the case that the GES Provider is not the same entity as the CDSP and GRDA, this Issue seeks to enable the migration of gas data from legacy services into a new physical interface.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Workgroup
Workgroup(s)
I0302 submission form
I0302 Change Report (Proposal Plan) v1.0
I0302 Change Report (Update to Plan) v1.0 Approved 15.04.26
I0302 Change Report (Extension to Plan) v1.0 Approved 26.08.2026
Company Name
REC Code Manager
Review status
Review required
Updates to Enquiry Service API endpoints to support migration to RECCo’s API Gateway
Date of latest update
Type
Issue
ID
I0301
Change Path
Urgent
No
Latest Update
06/11/2026 - Following further analysis, it was determined that I0301 is no longer required. While the Issue was originally raised to support a dual-fuel approach to RECCo’s Enquiry Service evolution, the initial focus on GES means that no changes to the REC are currently required to update the relevant API endpoints.
Summary
As part of RECCo’s plan to procure a dual-fuel Enquiry Service, there will be a single point of entry to API services. A migration plan has been developed with two independent stages. For stage one, all current Enquiry Service API users will need to connect through RECCo’s API Gateway rather than connecting directly to the existing EES and GES APIs. This will require users to amend the URLs they call when accessing the services.
Status
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
Stages Selection
I0301 submission form
Company Name
REC Code Manager
Review status
Review required
Meter Manufacturers Make and Type not Populated in SMRS
Date of latest update
Type
Issue
ID
I0297
Change Path
Priority
Urgent
No
Latest Update
On 30 September 2026, the REC Technical Expert Panel voted to approve the Update to Plan for I0297, and to place this REC Issue on hold.
Summary
The Meter Manufacturers Make and Type (J0410 / DI-048) was not populated as part of the MHHS Programme's data cleanse. However it is part of the SMRS maintained Meter Technical Details (MTDs) for Smart Meters which replace the DTC MTD Market Messages for Smart Meters in the MHHS environment. It is not currently possible to populate this item in the legacy arrangements.
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
Following MHHS Migration, the MTDs provided by SMRS do not include the Meter Manufacturers Make and Type, as this replaces the existing D0149/D0150 Market Messages it could lead to the information being lost. This will mean Energy Suppliers and MOAs will not know the make and type of meter installed at a particular Site.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0297 submission form
I0297 Change Report (Proposal Plan) V1.0
I0297 Update to plan
I0297 Legal Drafting
I0297 Update to plan v1.0 Approved 30.09.26
Company Name
RECCo
Review status
Review required