Market Role Code
ES
Harmonised context
ES

Transfer of Standard Settlement Configuration and Time Pattern Regime Data Item Ownership

Date of latest update
Type
Change
ID
R0243
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
From MHHS go live (M8), responsibility for maintaining the SSC and TPR valid set will transfer to the REC Code Manager. Without an associated change to ownership of the specific data items, cross governance issues will arise delaying the resolution of future changes to the use of SSC and TPR data in enduring retail processes.
Proposer
Jonny Moore
Change Plan

Change Report (Proposal Plan) published

Completed

Start:

12 Feb 2025

Due:

29 Jul 2025

Completion:

29 Jul 2025

Proposal Plan approved

Completed

Start:

29 Jul 2025

Due:

05 Aug 2025

Completion:

05 Aug 2025
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 4.1.0_Superseded
Included changes Affected REC Items
R0152 Revision to the Consolidated Metering Code of Practice (CoMCoP)
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0157 Removal of Facsimile as a Method of Code Communication
  • Schedule 14 - Metering Operations
  • Schedule 18 - Green Deal Arrangements
  • Standards Definition Document
  • Data Item Catalogue
R0191 Introduction of SLA for Supplier De-Registration on Disconnected Meters
  • Schedule 27 - RMP Lifecycle
R0205 Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches
R0212 Protecting Crimestoppers and their Contacts
R0215 Schedule 30 Switch Meter Reading Problems - Rejections and Timings
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
R0060 ERDS Service Definition timezone correction
  • Schedule 1 - Interpretations and Definitions
R0232 Non-Domestic Change of Occupier SDEP Screens (R0155 Solution)
R0243 Transfer of Standard Settlement Configuration and Time Pattern Regime Data Item Ownership
  • Data Item Catalogue
R0248 REC Changes to tie in with DCP451 - Suspending Registrations
  • Schedule 24 - Switching Data Management
R0254 Non-Domestic Change of Occupier Reporting (R0155 Solution)
R0255 Terms of Reference Updates
R0257 Change to REC for Data processing outside of EEA
R0263 Sharing Confirmed Energy Theft Data with the BSCCo
  • Schedule 7 - Energy Theft Reduction
R0269 Schedule 5 – Change Management: Clarity and Typographical Review
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0279 Housekeeping November 2025
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 7 - Energy Theft Reduction
  • Schedule 27 - RMP Lifecycle
  • Schedule 18 - Green Deal Arrangements
  • Schedule 24 - Switching Data Management
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Market Message Catalogue
R0227 Domestic Elective HH Switching
  • Schedule 23 - Registration Services
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Harriet Truss
Solution Development
Proposed Solution Document
Document title
R0243 - Data Items REDLINED
Upload document
R0243 - Data Items REDLINED.zip
Archive
Off
Problem Statement
From MHHS Go Live at MHHS Milestone M8 ‘Code changes delivered’, responsibility for maintaining the SSC and TPR valid sets will transfer to the REC Code Manager. Without an associated change to ownership of the specific Data Items, cross governance issues will arise delaying the resolution of future changes to the use of SSC and TPR data in enduring retail processes.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Change Proposal form
R0243 Change Report (Proposal Plan) v1.0 APPROVED 05.08.2025
R0243 Change Report (Consultation) v1.0 11.08.2025
R0243 Consolidated Consultation Responses PUBLIC v1.0
R0243 Change Report (Final Recommendation) v1.0 approved 24.09.25
Company Name
RECCo
Review status
Review required

Erroneous Switch Review: CSS Solution

Date of latest update
Type
Issue
ID
I0237
Change Category
Change Path
Priority
Urgent
No
Latest Update
18/11/2026 On 17 November 2026, the REC Change Panel approved an Update to Plan.
Summary
The current solution for Erroneous Switch (ES) resolution is failing some Consumers, there are gaps in the process and several areas that could be considered for improvement. It has been a number of years since the process has been reviewed end to end. Since then, Faster Switching has been introduced and MHHS is on the horizon.
Proposer
Carl Dennis
Issue Report - Issue Closure Report
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Linked to SDS Delivery
Yes
Lead Analyst
Florentina Monea
Solution Development
Proposed Solution Document
Document title
I0237 Erroneous Switch Draft Guidance Document V0.2
Upload document
Erroneous Switch_I0237_Draft_Guidance_V0.2_20250312.pdf
Archive
Off
Problem Statement
ES obligations are a key Consumer-impacting process which facilitate the quick resolution of Consumer detriment as efficiently as possible and requires an end-to-end review.
Workgroup
Workgroup(s)
Change proposal Form
I0237 - Change Report (Proposal plan) Approved 17.06.2025
I0237 Change Proposal Re Plan V2.0
I0237 Extension to Plan V1.0 Approved 25.06.2026
I0237 - Change Report (Extension to Plan) V4.0 (Approved)
Company Name
-
Review status
Review required

Missing Scenario Variants in D0179

Date of latest update
Type
Change
ID
R0235
Change Category
Change Path
Priority
Urgent
No
Latest Update
01/07/2025 - On 01 July 2025, the REC Change Panel voted to reject R0235 and approve R0235A, in line with the Code Manager's recommendation. The appeal window has closed.
Summary
Within MHHS SIT there is a scenario where the LDSO generates a D0139 to the MS for a PPM but the requirement is for the MS to generate a D0179. There is a gap in the D0179 data required and that provided on the D0139. 21.5.1 & 21.5.6 under Schedule 14 states that where the DNO changes the energisation status, within 3 WD of changing the energisation status the DNO will send the D0139 or the D0179(21.5.6) to the MS and then the MS will generate the D0179 to the Supplier(21.5.6). Currently, the LDSO only generates the D0179 to the Supplier but not to the MOP and the only change under MHHS is to add the new variant MSS.
Proposer
Patricia Parker
Change Plan

Change Report (Proposal Plan) approved by Change Panel

Completed

Start:

Due:

Completion:

04 Mar 2025

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

06 Mar 2025

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

01 May 2025

Presented at REC Change Panel

Completed

Start:

Due:

Completion:

20 May 2025
Impacted Consumers
Impacted REC Documents
Status
Implementation Date
Status Superseded
EMAR Version 4.2.0_Superseded
Included changes Affected REC Items
R0179 Proposal for Limiting Queries in EES API Calls (Single Query per API Call)
R0190 Related Meter Point RMP status rules
  • Schedule 28 - Related Metering Points
R0198 Metering Asset Manager (MAM) Communication Method Register
R0242 Missing Scenario Variant from R0043
  • Market Message Catalogue
R0244 C21 to be introduced into STIRG Document
  • Data Item Catalogue
R0235A Missing Scenario Variants in D0179 Alternate Solution
R0256 MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101
  • Market Message Catalogue
R0270 Clarification of SIP Qualification Requirements
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 15 - Metering Accreditation
R0271 Clarification of ASP, AMI, and EMO Accession Requirements
  • Schedule 15 - Metering Accreditation
  • Schedule 1 - Interpretations and Definitions
R0272 Enabling transparency of the CRS Provider’s REC service level performance
  • Schedule 1 - Interpretations and Definitions
  • Schedule 6 - Performance Assurance
  • Schedule 26 - Switching Service Management
  • Schedule 24 - Switching Data Management
R0277 Data Latency SLA Alignment for Gas Enquiry Service
  • Schedule 1 - Interpretations and Definitions
R0280 CSS Certificate Authority audit clarification
  • Schedule 1 - Interpretations and Definitions
R0283 Annual Address Management Plan Updates
  • Schedule 1 - Interpretations and Definitions
  • Schedule 6 - Performance Assurance
  • Schedule 29 - Address Management
R0287 Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0293 Housekeeping February 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0235 D0179 Missing Scenario Variants
Upload document
I0235 D0179 Missing Scenario Variants.pdf
Archive
Off
Document title
R0235 Data Specification V0.2
Upload document
I0235 D0179 Missing Scenario Variants V0.2.pdf
Archive
Off
Problem Statement
DNOs and MOAs cannot fulfil their full obligations listed in Schedule 14 Metering Operations as there missing Scenario Variants in the Data Specification preventing them from sending the D0179 to all required Parties.
Stages Selection
I0235 Change Proposal Form
I0235 Change Report (Proposal Plan) V1.0 Approved 04.03.25
I0235 Consolidated Impact Assessment Responses V1.0
R0235 and R0235A Change Report (For Consultation) V1.1
R0235 and R0235A Consolidated Consultation Responses PUBLIC V1.0
R0235 and R0235A Change Report (Final Recommendation) V2.0 (Approved) 01.07.2025
Company Name
ESG Global
Review status
Review required

D0303 flow following MHHS design changes

Date of latest update
Type
Issue
ID
I0230
Change Path
Priority
Urgent
No
Latest Update
29/04/2026 - This Issue has been withdrawn by the Proposer, as there was not a strong preference amongst MAPs of which temporary solution option (if any) should be progressed. Many MAPs already have workarounds in place, and a permanent solution is expected to be progressed in the future through a joint REC / BSC change. The adoption window has closed.
Summary
As part of Market Wide Half Hourly Settlement (MHHS) design, the requirement to provide Data Item Effective from Settlement Date {REGI} (J0049 / DI50025) in the Notification of Meter Operator, Supplier and Metering Assets installed / removed by the MOP to the MAP Market Message (D0303 / MM00240) has been changed from mandatory to optional. This means Meter Asset Providers (MAP) may not receive it.
Proposer
Beth Tatton
Change Plan

Change Report (Proposal Plan) approved at Change Panel

Completed

Start:

Due:

Completion:

04 Nov 2025
Impacted REC Services
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Problem Statement
The Effective from Settlement Date {REGI} Data Item being optional rather than mandatory inside the Notification of Meter Operator, Supplier and Metering Assets installed / removed by the MOP to the MAP Market Message means that MAPs may not receive this information required for billing purposes.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
Issue Proposal Form
I0230 Change Report (Proposal Plan) V1.0 approved 04.11.25
I0230 and I0261 Solution Development Report V1.0
I0230 I0261 Q&A session V1.0
I0230 and I0261 Consolidated IR Responses PUBLIC V1.0
Company Name
Calisen Asset Management Limited
Review status
Review required

Reconciliation of Unallocatable Transactions Review

Date of latest update
Type
Change
ID
R0223
Change Category
Change Path
Priority
Urgent
No
Latest Update
22/09/25 - This Change Proposal has been implemented as part of the MHHS M8 22 September 2025 REC Release.
Summary
The process for Reconciliation of Unallocatable Transactions is set out in Section 10 of Schedule 11. During the most recent reconciliation delivery (the gas process from July 2024) several areas of improvement were identified, critically a lack of clarity regarding historic Supplier Licences and how to include or exclude them from the calculations. The Code Manager believes that this lack of clarity and past precedent would lead to material impact on one or more Party.
Proposer
helen.fosberry_e0pk4
Change Plan

Findings from Information Request were presented at Change Issues Group

Completed

Start:

Due:

Completion:

06 Feb 2025
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 4.0.0_Superseded
Included changes Affected REC Items
R0044 MHHS Programme Changes required to Central Switching Service
  • Schedule 1 - Interpretations and Definitions
  • Schedule 27 - RMP Lifecycle
R0173 Improvements to the Theft Detection Incentive Scheme (TDIS)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 7 - Energy Theft Reduction
R0209 Implementation of Market-wide Half Hourly Settlement (MHHS) Arrangements
  • Schedule 15 - Metering Accreditation
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 19 - Market Exit and Supplier of Last Resort
  • Schedule 27 - RMP Lifecycle
  • Schedule 28 - Related Metering Points
  • Schedule 29 - Address Management
  • Schedule 9 - Qualification and Maintenance
  • Schedule 12 - Data Access
  • Schedule 24 - Switching Data Management
  • Schedule 23 - Registration Services
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Standards Definition Document
  • Data Item Catalogue
  • Market Message Catalogue
R0222 ESME ID Update Rejections
R0223 Reconciliation of Unallocatable Transactions Review
  • Schedule 11 - Prepayment Arrangements
R0241 MHHS Incremental Changes for go live
  • Schedule 15 - Metering Accreditation
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 19 - Market Exit and Supplier of Last Resort
  • Schedule 27 - RMP Lifecycle
  • Schedule 28 - Related Metering Points
  • Schedule 29 - Address Management
  • Schedule 9 - Qualification and Maintenance
  • Schedule 24 - Switching Data Management
  • Schedule 23 - Registration Services
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Standards Definition Document
  • Data Item Catalogue
  • Market Message Catalogue
R0259 Update to R0173 Implementation Date
R0264 Data Specification Housekeeping
R0083 Changes to Supply Number Format for MHHS
R0097 Consequential Change for CSS Smart Meter Data Retriever Appointments
  • Data Item Catalogue
  • Market Message Catalogue
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed solution summary
  1. A review of the process with specific regard to: - Clarity within the process regarding historic Supplier Licences - Alignment between fuels - Re-introducing an independent audit.
Proposed Solution Document
Document title
Schedule 11 - Prepayment Arrangements (I0223 - Party Impact Assessment) 05.06.2025
Upload document
Schedule 11 - Prepayment Arrangements (I0223 - Party Impact Assessment) 05.06.docx
Archive
Off
Document title
Extract - Schedule 11 - Prepayment Arrangements (I0223 - Party Impact Assessment) 05.06.2025
Upload document
Extract - Schedule 11 - Prepayment Arrangements (I0223 - Party Impact Assessment) 05.06.docx
Archive
Off
Document title
Schedule 11 - Prepayment Arrangements (R0223 - Consultation) 24.07.2025
Upload document
Schedule 11 - Prepayment Arrangements (R0223 - Consultation).docx
Archive
Off
Document title
Extract - Schedule 11 - Prepayment Arrangements (R0223 - Consultation) 24.07.2025
Upload document
Extract - Schedule 11 - Prepayment Arrangements (R0223 - Consultation).docx
Archive
Off
Document title
Schedule 11 - Prepayment Arrangements (R0223 - Final Recommendation) 18.08.2025
Upload document
Schedule 11 - Prepayment Arrangements (R0223 - Final Recommendation) 18.08.2025.pdf
Archive
Off
Document title
Extract - Schedule 11 - Prepayment Arrangements (R0223 - Final Recommendation) 18.08.2025
Upload document
Extract - Schedule 11 - Prepayment Arrangements (R0223 - Final Recommendation) 18.08.2025.pdf
Archive
Off
Problem Statement
During the most recent reconciliation delivery (the gas process from July 2024) several areas of improvement were identified, critically a lack of clarity regarding historic Supplier Licences and how to include or exclude them from the calculations.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0223 - Submission Form
I0223 - Information Request Responses
I0223 - Change Report (Proposal Plan) V2.0 (Approved) 20.05.2025
I0223 - Proposal Plan Update V1.0 (Approved) 20.05.2025
I0223 - Change Report (Impact Assessment) V1.0 (06.06.2025)
I0223 - Party Impact Assessment Consolidated Responses V1.0 (11.07.2025)
R0223 - Change Report (For Consultation) V1.0 (24.07.2025)
R0223 - Change Report (Final Recommendation) V2.0 (Approved) 02.09.2025
Company Name
Code Manager
Review status
Review required

Stranded RMPs in Defunct Suppliers

Date of latest update
Type
Issue
ID
I0219
Change Path
Priority
Urgent
No
Latest Update
27/02/2025 - Change is now not being merged into any other changes and will proceed as a standalone change. A potential solution has been identified, but will be discussed for potential cross code impacts
Summary
Currently within Schedule 23 a Registration can only be undertaken on RMPs with an Operational or Dormant RMP Status, and not Terminated. Terminated is a status that the RMP is set to when the Meter Point Status is no longer operational or the site is isolated. It is right that these sites are not able to be Registered as there is a risk that Suppliers could inadvertently Register such Meter Points. We do have instances where such sites are stranded in defunct Supplier portfolios - and the Supplier no longer has the capability to take the relevant action to Deactivate the Registrations. This may because the operational staff have left and the business is in administration.
Proposer
David Addison
Change Plan

Discussed at Technical Change Workshop

Completed

Start:

Due:

Completion:

25 Feb 2025
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
Lead Analyst
James Hardy
Solution Development
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
Issue Proposal Form
Company Name
Xoserve
Review status
Review required

Introducing Third Party Intermediary (energy broker) assurance and accreditation (Alternate)

Date of latest update
Type
Change
ID
R0137A
Change Category
Urgent
No
Latest Update
16/05/2025 - the Authority have published their decision to reject R0137 and R0137A.
Summary
This change seeks to expand the obligation for Energy Suppliers to only work with TPIs who are adhering to principles as set out in the REC TPI Code of Practice to all Non-Domestic Consumers. It also looks to reduce the burden on Energy Suppliers having to perform their own audits by introducing a REC Services Accreditation Scheme and allowing companies to qualify as an Industry-Recognised Accreditation Body.
Proposer
Caroline Freimuller
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Legal Text R0137A Consultation
Upload document
Legal Text R0137A Consultation.zip
Archive
Off
Document title
Legal Text for R0137A - Final
Upload document
R0137A Final Legal Text.zip
Archive
Off
Problem Statement
Non-Domestic Consumers have more limited protections than Domestic and Microbusiness Consumers in the energy market, and so may not always experience best practice from all parties they interact with. The aim is to expand these protections while limiting the audit burdens on Suppliers and TPIs.
Stages Selection
SME
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
R0137A Change Proposal Form
Authority decision on REC modification proposal R0137 and R0137A
Company Name
REC Code Manager
Review status
Review required

Creation of a Mechanism to Allow Third Parties to Report Objection Activity

Date of latest update
Type
Issue
ID
I0213
Change Category
Change Path
Priority
Urgent
No
Latest Update
15/07/2025 - The Code Manager has rejected Issue I0213. This Issue has been deemed out of scope of the REC and has been rejected following a legal review. This decision was ratified by the REC Change Panel at their meeting on 15 July 2025.
Summary
Presently only industry parties can raise the matter of non-compliant or unwarranted objections activity that a supplier may be participating in. This Issues has been raised to request RECCo to consider accepting notice and evidence (that can be acted upon) from qualifying 'non industry' parties, from third party consultants and brokers.
Proposer
Simon Askew
Change Plan

Proposal Plan Approved at REC Change Panel

Completed

Start:

Due:

Completion:

06 May 2025
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed solution summary
  1. I0213 has been raised with a suggestion that the Code Manager should consider accepting notice and evidence from qualifying non-industry Parties, including Third Party consultants and brokers (Third Party Intermediaries (TPIs)). A possible solution for this may include a new submission page, or form, on the REC Portal, that would allow Third Parties to submit evidence of non-compliant Objection activity.
Problem Statement
There is currently not a method for Third Parties, who may be involved in the Switching process, to report non-compliant Objection activity. Non-Compliant Objection activity can result in time consuming procedures for Consumers, creating unnecessary engagement with Energy Suppliers, and may result in a financial burden.
Stages Selection
Stages Selection
I0213 - Change Proposal Form
I0213 - Change Report (Proposal Plan) 25.04.2025 (Approved)
I0213 - Solution Development Report (for Party impact assessment) V1.0 (16.05.2025)
I0213 Consolidated Impact Assessment Responses V1.0 (Non-Confidential) 07.07.2025
Company Name
Energy Consultants Association
Review status
Review required

Sequence order of CSS00200 message

Date of latest update
Type
Issue
ID
I0204
Urgent
No
Latest Update
08/11/2024 - The Proposer has withdrawn this issue as it is being progressed under MHHS CR056. The adoption window has now closed. * This is Issue relates to the Market-wide Half Hourly Settlement design.
Summary
Empty
Proposer
Madison Layton
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
Stages Selection
Company Name
St.Clements
Review status
Review required

Review of Metering Asset data transferred from MAMs to the CDSP

Date of latest update
Type
Issue
ID
I0196
Change Path
Priority
Urgent
No
Latest Update
10/09/2026 - The Metering Expert Panel approved the extension to plan for I0196. This REC Issue is now placed on hold.
Summary
It has emerged that a high proportion of gas Data Items contain mismatches when comparing between Metering Asset Managers (MAM), Gas Suppliers, and the Central Data Service Provider. This Issue seeks to explore this issue and identify mechanisms by which these mismatches may be resolved.
Proposer
Amy Crowe-Lamont
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
florentina.monea
Solution Development
Problem Statement
Work conducted by RPA has identified a significant number of mismatches between gas Data Items held by key stakeholders. This may result in Consumer detriment, as information relevant to an MPRN may not be held accurately by any given Party. As such, there is a need to review processes pertaining to the communication of gas data by MAMs onward to the CDSP to mitigate the potential for mismatches.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0196 Issue Proposal Form (Word)
I0196 Issue Proposal Form (PDF)
I0196 Change Report (Plan) (Approved) V2.0 07.05.25
I0196 Change Re-Plan (Approved) V1.0 02.05.25
I0196 Change Re-Plan V2.1 (Approved) 09.09.26
Company Name
-
Review status
Review required