ID
R0331
Change Category
Change Path
Priority
Urgent
No
Latest Update
20/10/2026 The Change Report (Update to Plan) was approved by the REC Change Panel on 20 October 2026, and the Issue progressed to a Change Proposal on 22 October 2026.
Summary
An incident where Network Parties did not submit Regulatory Alliances on time to the Central Switching Service (CSS) Provider, or did submit the Regulatory Alliances but did not action rejections from the CSS Provider in a timely manner, led to over 200 Consumers being delayed in Switching to their chosen Energy Supplier. This Change Proposal has been raised to review this process.
Change Plan
Change Report (Proposal Plan) approved at Change Panel
Completed
Start:
Due:
Completion:
18 Aug 2026Presented at Change Issues Group
Completed
Start:
Due:
Completion:
03 Sep 2026Update to plan approved by Change Panel
Completed
Start:
Due:
Completion:
20 Oct 2026Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0331 Schedule 24 Switching Data Management
Upload document
I0331 Schedule 24 Switching Data Management v0.6.docx
Archive
Off
Problem Statement
The lack of Service Level Agreements (SLAs) on Network Parties to submit Regulatory Alliances to the CSS Provider or to work any rejections received from the CSS Provider can lead to delays in Consumers being able to Switch to their chosen Energy Supplier.
Stages Selection
SME
SME Role
Lead Assurance Analyst
I0331 submission form
I0331 Change Report (Update to Plan) - Approved 20/10/26
I0331 Change Report (Proposal Plan) V1.0 approved 18.08.26
I0331 Consolidated Impact Assessment Responses v2.0
I0331 Update to Plan Approved 20.10.2026
Company Name
SQE Energy
Review status
Review required
Provision of Standard industrial Classification (SIC) Code to REC Parties
Date of latest update
Type
Issue
ID
I0327
Priority
Urgent
No
Latest Update
18/11/2026 - On 17 November 2026, the REC Change Panel approved the Change Report (Proposal Plan) for I0327 in line with the Code Manager's recommendation. The Information Request will close on 04 December 2026.
Summary
As part of the planning required to deliver Net Zero, Gas Distribution Networks (GDNs) are obligated to plan Industrial and Commercial (I&C) gas demand at a more granular, site-specific level. To meet this obligation, access to Standard Industrial Classification (SIC) Code data, matched to both Gas and Electricity Meter Point Reference Numbers, would provide a significantly improved understanding of I&C customers.
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Solution Development
Problem Statement
As part of the planning required to deliver Net Zero, Gas Distribution Networks (GDNs) are obligated to plan Industrial and Commercial (I&C) gas demand at a more granular, site-specific level. Ofgem, DESNZ and NESO increasingly require GDNs to present detailed information on the types of I&C activities operating within each Network footprint to support robust long-term whole-system planning. To meet this obligation, access to Standard Industrial Classification (SIC) Code data, matched to both Gas and Electricity Meter Point Reference Numbers, would provide a significantly improved understanding of I&C customers. This data would enable GDNs to:
- characterise current I&C gas demand more accurately,
- identify patterns and drivers of consumption across different industrial and commercial sectors, and
- engage more effectively with site operators to understand their ongoing and future energy needs.
By improving visibility of the industrial and commercial landscape across the network, GDNs would be able to plan current demand more effectively, better identify areas requiring continued investment, and support whole system partners such as DNOs where cross vector interactions may be relevant, ensuring planning decisions remain aligned with customers’ needs while supporting the broader Net Zero transition. This data would also improve targeted engagement with strategically significant I&C sites, allowing networks to better understand operation drivers, decarbonisation constraints and long-term energy requirements rather than that of current and historic consumption trends.
- characterise current I&C gas demand more accurately,
- identify patterns and drivers of consumption across different industrial and commercial sectors, and
- engage more effectively with site operators to understand their ongoing and future energy needs.
By improving visibility of the industrial and commercial landscape across the network, GDNs would be able to plan current demand more effectively, better identify areas requiring continued investment, and support whole system partners such as DNOs where cross vector interactions may be relevant, ensuring planning decisions remain aligned with customers’ needs while supporting the broader Net Zero transition. This data would also improve targeted engagement with strategically significant I&C sites, allowing networks to better understand operation drivers, decarbonisation constraints and long-term energy requirements rather than that of current and historic consumption trends.
Stages Selection
Stages Selection
Workgroup
Workgroup(s)
I0327 submission form
Change Report - Proposal Plan
I0327 Change Report (Proposal Plan) Approved 17.11.26
Company Name
-
Review status
Review required
Crossed Meters Process: Clarifications and Support
Date of latest update
Type
Issue
ID
I0314
Change Category
Change Path
Priority
Urgent
No
Latest Update
On 30 October 2026, the REC Change Panel approved an Extension to Plan for I0314 via ex-committee.
Summary
This issue seeks to solve is the gap between the documented REC Crossed Meters process and how it is being applied operationally. The aim is to ensure all parties fully understand the process, apply it consistently, and have the support necessary to achieve timely, correct resolution of Crossed Meter cases.
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0314 submission form
I0314 Change Report (Proposal Plan) Approved 21.04.26
I0314 Extension to Plan V1.0 (Approved) 30.10.26
Company Name
REC Code Manager
Review status
Review required
Organisations with multiple role types EES and SDEP access
Date of latest update
Type
Issue
ID
I0285
Change Category
Change Path
Priority
Urgent
No
Latest Update
On 22 October 2026, the Code Manager published the I0285 Closure Report. Following a review of the responses to the Party impact assessment, the Code Manager has determined that this REC Issu can be moved to Resolved as there has been a lack of Parties indicating they would use the proposed solution under I0285. The enduring solution of one individual assigned to two company groups to use two separate email addresses for each company group will be sustained. RECCo will consider the requirement for a single login across multiple roles as part of the Enquiry Services Evolution project development.
Summary
It is currently not possible for organisations with multiple role types to have the same person be able to access all assigned role types within the Secure Data Exchange Portal (SDEP) without having a unique email address for each role type.
Change Plan
Change Report (Proposal Plan) approved by Change Panel
Completed
Start:
Due:
Completion:
04 Nov 2025Discussed at Technical Expert Panel
Completed
Start:
Due:
Completion:
17 Dec 2025Discussed at Technical Expert Panel
Completed
Start:
Due:
Completion:
28 Jan 2026Extension to Plan approved by Technical Expert Panel
Completed
Start:
Due:
Completion:
25 Feb 2026Discussed at Change Issues Group
Completed
Start:
Due:
Completion:
06 Aug 2026Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Zip file with I0285 legal text
Upload document
Legal text for Party IA (2).zip
Archive
Off
Document title
I0285 Solution Development Report V1.0
Upload document
I0285 Solution Development Report V1.0.pdf
Archive
Off
Problem Statement
Organisations with more than one role type are required to have unique email addresses for staff who require access to multiple role types, leading to inefficiencies, unnecessary administrative burdens and a poor user experience.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
I0285 submission form
I0285 Change Report (Proposal Plan) V1.0 approved 04.11.25
I0285 Extension to Plan V1.0 approved 25.02.26
I0285 Extension to Plan V2.0 approved 24.06.26
I0285 Consolidated Impact Assessment Responses v1.0
I0285_Closure Report
Company Name
REC Code Manager
Review status
Review required
Annual Address Management Plan Updates
Date of latest update
Type
Change
ID
R0283
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
Address management is the responsibility of DCC, with support from REC Parties. There has been progress resolving address data issues, but there is no mechanism to clearly establish code level targets for address improvement, or overall market performance.
Change Plan
Proposal Plan approved at Change Panel
Completed
Start:
Due:
Completion:
21 Oct 2025Final Recommendation approved at Change Panel
Completed
Start:
Due:
Completion:
16 Dec 2025Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
27 February 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0179 | Proposal for Limiting Queries in EES API Calls (Single Query per API Call) | |
| R0190 | Related Meter Point RMP status rules |
|
| R0198 | Metering Asset Manager (MAM) Communication Method Register | |
| R0242 | Missing Scenario Variant from R0043 |
|
| R0244 | C21 to be introduced into STIRG Document |
|
| R0235A | Missing Scenario Variants in D0179 Alternate Solution | |
| R0256 | MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101 |
|
| R0270 | Clarification of SIP Qualification Requirements |
|
| R0271 | Clarification of ASP, AMI, and EMO Accession Requirements |
|
| R0272 | Enabling transparency of the CRS Provider’s REC service level performance |
|
| R0277 | Data Latency SLA Alignment for Gas Enquiry Service |
|
| R0280 | CSS Certificate Authority audit clarification |
|
| R0283 | Annual Address Management Plan Updates |
|
| R0287 | Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations |
|
| R0293 | Housekeeping February 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0283 Legal Text For Consultation
Upload document
R0283 Legal Text For Consultation.zip
Archive
Off
Problem Statement
The REC Address Management Service is the responsibility of DCC, with support from REC Parties. There has been progress resolving address data issues, but there is no mechanism to clearly establish code level targets for address improvement, or overall market performance.
Stages Selection
SME
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
R0283 submission form
R0283 Change Report (Proposal Plan) v1.0 approved 21/10/2025
R0283 Change Report (For Consultation) v1.0
R0283 Consolidated Consultation Responses v1.0
R0283 - Change Report (Final Recommendation) Approved 16.12.25 v1.0
Company Name
REC Code Manager
Review status
Review required
Additional Registration Data (Gas) under Smart Energy Code
Date of latest update
Type
Issue
ID
I0262
Change Category
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
30/09/2026 - Change Report Re-Plan V5.0 approved by Change Panel.
Summary
Gas Transporters (GTs) only have a single obligation in the Smart Energy Code (SEC). This obligation relates to the provision of Registration Data to the DCC. This issue is exploring whether these obligations may be transferred to the REC.
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
Gas Transporters have very few obligations under the Smart Energy Code; those that they do have relate to provision of data owned by the REC. If these obligations were to be moved from the SEC to the REC, then the regulatory burden on GTs may be reduced as they would be able to completely secede from the SEC.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Change Proposal Submission form
I0262 Change Report (Plan) (Approved) V5.0 19.06.26
I0262 Change Report Re-Plan V4.0 19.06
I0262 Change Report Re-Plan V5.0 Approved 30.09.2026
Company Name
Northern Gas Networks Ltd
Review status
Review required
Changes to Terms of reference following acceptance of R0167
Date of latest update
Type
Change
ID
R0188
Change Path
Urgent
No
Latest Update
20/08/2024 - Approved for implementation on 06/09/2024.
Summary
This Housekeeping Change Proposal seeks to update the Terms of Reference of the REC Change Panel and the Performance Assurance Board, following the acceptance of R0167, to reflect Issues.
Status
Implementation Date
06 September 2024
| Included changes | Affected REC Items | |
|---|---|---|
| R0177 | Change Smart Meter Installation Consumer Survey Specification survey questions to a REC Category 2 document | |
| R0188 | Changes to Terms of reference following acceptance of R0167 | |
| R0192 | Housekeeping Amendments |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
REC Change Panel - Terms of Reference
Upload document
REC Change Panel - Terms of Reference.docx
Archive
Off
Document title
REC Performance Assurance Board (PAB) - Terms of Reference
Upload document
REC Performance Assurance Board (PAB) - Terms of Reference.docx
Archive
Off
Problem Statement
This Housekeeping Change Proposal seeks to update the Change Panel and Performance Assurance Board, Terms of Reference to reflect that these Committees consider change Issues as well as Change Proposals.
Stages Selection
R0188 - Change Proposal Form
R0188 - Housekeeping Change Report (Post Approval)
Company Name
Rec Manager
Review status
Review required
Schedule 8 Review and Best Practice Guidance Development
Date of latest update
Type
Issue
ID
I0187
Change Category
Change Path
Priority
Urgent
No
Latest Update
18/11/2026 The REC Change Panel has approved the Update to Plan as part of the Bulk Update presented at their meeting on 17/11/2026
Summary
Schedule 8 - Unbilled Energy Code of Practice has not been reviewed since its development for REC go-live. This Issue seeks to understand if there are any conflicts in the Schedule with best practice and identify any gaps or duplication. Alongside this, a best practice guidance document will be developed which is relevant, complete and aligned to current processes and obligations.
Change Plan
Proposal Plan Approved at Change Panel
Completed
Start:
26 Sep 2024Due:
31 Mar 2027Completion:
21 Jan 2025Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
Schedule 8 - Unbilled Energy Code of Practice has not been reviewed since its development for REC go-live. The Schedule needs to be reviewed to ensure it is up to date, understand if there are any conflicts with best practice and identify any gaps or duplication.
Stages Selection
Stages Selection
Workgroup
Workgroup(s)
I0187 - Change Proposal Form
I0187 - Change Report (Proposal Plan) V1.0 (Approved) 21.01.2025
I0187 - Change Report (Extension to Plan) Approved 17.06.2025
I0187 - Change Report (Extension to Plan) 02.09.2025
I0187 - Change Report (Extension to Plan) 13.01.2025 (Pre-Approval)
I0187 - Change Report (Extension to Plan) V1.0 Approved 25.06.2026
I0187 - Change Report (Extension to Plan) 13.01.2025
I0187 - Change Report (Extension to Plan) V5.0 (Approved)
Company Name
Code Manager
Review status
Review required
Gas Meter Type Code - Thermal Mass Measurement
Date of latest update
Type
Issue
ID
I0184
Urgent
No
Latest Update
16/10/2024 - This Change Issue has been withdrawn at the request of the proposer.
Summary
Empty
Status
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
Stages Selection
I0184 - Change Proposal Form (PDF)
Company Name
Octopus Energy Ltd
Review status
Review required
Improvements to CSS Business Process Logic
Date of latest update
Type
Change
ID
R0178
Change Category
Change Path
Priority
Urgent
No
Latest Update
17/06/2026 - The Code Manager has published an Update to Plan. This will be presented to the REC Technical Expert Panel at their meeting on 24 June 2026.
Summary
This change proposal is aimed towards rectifying a collection of issues that were identified with the CSS Business Process Logic. These have been identified as follows: 1. Deactivation of an active reg. whilst in-flight switch in progress 2. Deactivation of a prior cancelled registration 3. OFAF switch containing multiple MPxN
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
25 June 2027
| Included changes | Affected REC Items | |
|---|---|---|
| R0122 | SDEP Review Improvements (2) - Usability | |
| R0178 | Improvements to CSS Business Process Logic | |
| R0284 | Updates to Schedule 14 Measurement Transformers Commissioning Timescales |
|
| R0321 | DNOs Create Export MPANs after approving G98/99 commissioning documents |
|
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- Deactivation of an active reg. whilst in-flight switch in progress As mentioned previously, the ‘Deactivation of an active reg. whilst in-flight switch in progress’ issue did have an existing REC CP raised and therefore is further along the discussion process compared to the other two issues identified. Initial discussion outlined that the most appropriate solution for this change proposal should consider the business needs and the desired outcomes. It was noted that from a business perspective, if the switch has already been accepted, then it should still go through and not be cancelled. Therefore, the following points were raised: • It was acknowledged that there are multiple solution options/approaches that could potentially be employed to resolve this issue. As such, and to avoid being overly prescriptive, it is requested that CSS provider investigate all possible options and outline their recommendation for the most suitable approach, which would be developed/progressed further through the subsequent Impact Assessments. • However, the aim is for an effective solution to be developed which would ensure that the consumer is switched with the original effective date being used and that CSS systems could cater for such registration events whilst following the normal Gate Closure processes. • Where possible, the solution should also look to proactively mitigate the impact of this scenario, as opposed to working on a retrospective basis which can lead to the issue persisting over an extended period of time. It was also noted that consideration would need to be given to state of the meters as this would also have an impact on whether switches are able to progress: Therefore, the following points were raised: • The solution would need to consider how the incumbent supplier has deactivated the meter and whether it has been moved to a ‘terminated’ state or a ‘dormant’ state. o Dormant – The meter is inactive. Note that this is a temporary state and therefore the meter could be put back into service. o Terminated – The meter has reached end of life and cannot be reinstated. Note that this is a permanent state. • If the incumbent supplier has moved the meter into a ‘terminated’ state, the in-flight switch would then need to be cancelled. • However, for the ‘dormant’ state, the following two options would be available in terms of what could happen to the status of the meter and thus the in-flight switch: o Moves from ‘inactive’ to ‘active’ (continue with the switch) o Moves from ‘inactive’ to ‘cancelled’ (cannot continue with the switch)
- Deactivation of a prior cancelled registration and OFAF switch contains multiple of the same MPxN It is noted that the initial approach discussed was to add new Business Data Validation Rules (BDVR) to stop these issues from occurring. However, this was only discussed at high-level and therefore we request that the CSS provider confirm this approach and provide further details as this change proposal progresses.
Problem Statement
1) Deactivation of an active reg. whilst in-flight switch in progress: There are instances where the incumbent supplier is withdrawing prior to the ‘Supply Effective from Date’, causing the accepted switch to fail at Gate Closure which occurs at 17:00hrs. This creates the scenario in which there is no longer a losing supplier for the consumer to switch from, and therefore the switch process stalls and cannot be progressed. Therefore, this has a direct impact on consumers who have a switch request which has already been accepted but CSS is not able to progress further as the switch process stops. Indeed, there have been a total of 82 missing messages observed since 1st January 2023, of which 66 messages have been related to switches where there was no registered Supplier recorded at Gate Closure. The 30th September 2023 Gate Closure was particularly impacted by this scenario and resulted in 45 registrations which did not become effective on 14th October 2023 as planned. It should also be noted that the 1st October is one of the key contracting dates for large Industrial and Commercial (I&C) consumers, consequently increasing the impact to consumers in this instance. 2) Deactivation of a prior cancelled registration: This scenario occurs when the registered supplier of a MPxN (via the active registration) is the same supplier that cancelled a previous switch for the same MPxN. In this case there is the possibility that the supplier could attempt to deactivate the active registration by accidentally providing the cancelled registration identifier. Currently, CSS still accepts the deactivation request and erroneously changes the cancelled registration state from cancelled to inactive, sending out securedInactive messages. Currently, after an MPxN is disconnected, the Supplier is required to submit a deregistration request to CSS. Therefore, there is a possibility that the suppliers could submit this request for a cancelled registration not active registration. CSS would still accept this request as the Business Data Validation Rules (BDVR) lack coverage of this case; in such cases the Supplier may incorrectly believe that they have deregistered the MPANs. 3) OFAF switch containing multiple MPxN: This is the instance where the end user sends through a One Fail All Fail (OFAF) switch with the same MPxN contained within the payload 2 or more times. Multiple registration IDs are created for the same MPxN, and the registration is left in an incorrect state given a lack of appropriate BDVRs. Indeed, there has been a further reported incident regarding an OFAF transaction of the same MPxN. The primary MPxN was associated with a secondary MPxN and therefore two registrations were created for the primary and secondary MPxN, equating to four registrations in total. There was then an objection raised but this only cancelled 1 of the 2 registrations for each MPxN. The remaining 2 registrations proceeded through gate closure.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
R0178 - Change Proposal Form
R0178 - Change Report (Proposal Plan) V2.0 (18.02.2025)
R0178 - Update to Proposal Plan V1.0 (Approved) 18.02.2025
R0178 - Consolidated Impact Assessment Responses (Non-Confidential) 18.03.2026
R0178 - Change Report (For Consultation) V1.0
R0178 - Update to Plan (17.06.2026) Pre-Approval
Company Name
REC Technical Services
Review status
Review required